Volumn 48, Issue 2, 1997, Pages 175-183

On-line control model for network construction projects

Author keywords

Activity network; Chance constraint; Construction project; Inspection point; On line control

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; CONSTRUCTION; DECISION MAKING; INSPECTION; OPTIMIZATION; PERFORMANCE; PERT; PROJECT MANAGEMENT; RANDOM PROCESSES;

EID: 0031070492     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2600353     Document Type: Article
Times cited : (5)

References (18)
  • 1
    • 0001320360 scopus 로고
    • A generalized network approach to the planning and scheduling of a research project
    • Eisner, H., (1962). A generalized network approach to the planning and scheduling of a research project. Oper Res 10(1): 115-125.
    • (1962) Oper Res , vol.10 , Issue.1 , pp. 115-125
    • Eisner, H.1
  • 4
    • 0037644390 scopus 로고
    • The use of advanced management techniques in R&D
    • Watts, K. M., Higgins, J. C., (1987). The use of advanced management techniques in R and D. Omega 15(1): 21-29
    • (1987) Omega , vol.15 , Issue.1 , pp. 21-29
    • Watts, K.M.1    Higgins, J.C.2
  • 5
    • 38249026380 scopus 로고
    • PERT assumptions revisited
    • Golenko-Ginzburg, D., (1989). PERT assumptions revisited. Omega 17(4): 393-396.
    • (1989) Omega , vol.17 , Issue.4 , pp. 393-396
    • Golenko-Ginzburg, D.1
  • 6
    • 0027642129 scopus 로고
    • A two-level decision-makingmodel for controlling stochastic projects
    • Golenko-Ginzburg, D., (1993). A two-level decision-makingmodel for controlling stochastic projects. Int J Prod Economics 32: 117-127.
    • (1993) Int J Prod Economics , vol.32 , pp. 117-127
    • Golenko-Ginzburg, D.1
  • 7
    • 0041453249 scopus 로고
    • Planning and control in research and development
    • Pearson, A. W., (1990). Planning and control in research and development. Omega 18(6): 573-581.
    • (1990) Omega , vol.18 , Issue.6 , pp. 573-581
    • Pearson, A.W.1
  • 8
    • 0030084906 scopus 로고    scopus 로고
    • On-line control model for COST-Simulation projects
    • Golenko-Ginzburg, D., Gonik, A., (1996). On-line control model for COST-Simulation projects. J Opl Res Soc 47: 266-283.
    • (1996) J Opl Res Soc , vol.47 , pp. 266-283
    • Golenko-Ginzburg, D.1    Gonik, A.2
  • 9
    • 0038654496 scopus 로고
    • Why projects are ‘always’ late: Arationale based on manual simulation of a Pert/CPM network
    • Schonberger, R.J., (1981). Why projects are ‘always’ late: arationale based on manual simulation of a Pert/CPM network. Interfaces 11(5): 66-70.
    • (1981) Interfaces , vol.11 , Issue.5 , pp. 66-70
    • Schonberger, R.J.1
  • 10
    • 0041859693 scopus 로고
    • Why projects fail: An effect of ignoringthe obvious
    • Hughes, M. W., (1986). Why projects fail: an effect of ignoringthe obvious. Ind Engnr 18(4): 14-18.
    • (1986) Ind Engnr , vol.18 , Issue.4 , pp. 14-18
    • Hughes, M.W.1
  • 11
    • 5244328738 scopus 로고
    • Project management control problems: An information systems focus
    • Bobrowksi, P. M., (1989). Project management control problems: an information systems focus. Proj Mgmt J 20(2): 11-16.
    • (1989) Proj Mgmt J , vol.20 , Issue.2 , pp. 11-16
    • Bobrowksi, P.M.1
  • 12
    • 0024063984 scopus 로고
    • On the distribution of activitytime in PERT
    • Golenko-Ginzburg, D., (1988). On the distribution of activitytime in PERT. J Opl Res Soc 39(8): 767-771.
    • (1988) J Opl Res Soc , vol.39 , Issue.8 , pp. 767-771
    • Golenko-Ginzburg, D.1
  • 13
    • 84974860315 scopus 로고
    • A new distribution function for risk analysis
    • Berny, J., (1989). A new distribution function for risk analysis. J Opl Res Soc 40(12): 1121-1127.
    • (1989) J Opl Res Soc , vol.40 , Issue.12 , pp. 1121-1127
    • Berny, J.1
  • 14
    • 0026837875 scopus 로고
    • Practical use of distributions in activity analysis
    • Williams, T., (1992). Practical use of distributions in activity analysis. J Opl Res Soc 43(3): 265-270.
    • (1992) J Opl Res Soc , vol.43 , Issue.3 , pp. 265-270
    • Williams, T.1
  • 15
    • 38149144832 scopus 로고
    • A comparison between the VERT program andother methods of project duration estimates
    • Kidd, J., (1987). A comparison between the VERT program andother methods of project duration estimates. Omega 15(2):129-134.
    • (1987) Omega , vol.15 , Issue.2 , pp. 129-134
    • Kidd, J.1
  • 17
    • 0000623498 scopus 로고
    • Hierarchicalcontrol of semi-automated production systems
    • Golenko-Ginzburg, D., Sinuany-Stern, Z., (1993). Hierarchicalcontrol of semi-automated production systems. Prod Plan and Cont 4(4): 361-370.
    • (1993) Prod Plan and Cont , vol.4 , Issue.4 , pp. 361-370
    • Golenko-Ginzburg, D.1    Sinuany-Stern, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.