메뉴 건너뛰기




Volumn 33, Issue 5, 2015, Pages 1151-1159

An alternative incomplete information bargaining model for identifying the reasonable concession period of a BOT project

Author keywords

Bargaining model; Build operate transfer (BOT); Concession period; Incomplete information

Indexed keywords

PROJECT MANAGEMENT; TECHNOLOGY TRANSFER;

EID: 84929519791     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2014.12.004     Document Type: Article
Times cited : (42)

References (57)
  • 1
    • 23044511386 scopus 로고    scopus 로고
    • Public sector efficiency: an international comparison
    • Afonso A., Schuknecht L., Tanzi V. Public sector efficiency: an international comparison. Public Choice 2005, 123(3-4):321-347.
    • (2005) Public Choice , vol.123 , Issue.3-4 , pp. 321-347
    • Afonso, A.1    Schuknecht, L.2    Tanzi, V.3
  • 2
    • 34548663905 scopus 로고    scopus 로고
    • Build-operate-transfer in infrastructure projects in the United States
    • Algarni A.M., Arditi D., Polat G. Build-operate-transfer in infrastructure projects in the United States. J. Constr. Eng. Manag. ASCE 2007, 133(10):728-735.
    • (2007) J. Constr. Eng. Manag. ASCE , vol.133 , Issue.10 , pp. 728-735
    • Algarni, A.M.1    Arditi, D.2    Polat, G.3
  • 3
    • 0029425663 scopus 로고
    • Epistemic conditions for Nash equilibrium
    • Aumann R., Brandenburger A. Epistemic conditions for Nash equilibrium. Econometrica 1995, 63:1161-1180.
    • (1995) Econometrica , vol.63 , pp. 1161-1180
    • Aumann, R.1    Brandenburger, A.2
  • 4
    • 13944251011 scopus 로고    scopus 로고
    • Optimal capital structure model for BOT power projects in Turkey
    • Bakatjan S., Arikan M., Tiong R.L.K. Optimal capital structure model for BOT power projects in Turkey. J. Constr. Eng. Manag. ASCE 2003, 129(1):89-97.
    • (2003) J. Constr. Eng. Manag. ASCE , vol.129 , Issue.1 , pp. 89-97
    • Bakatjan, S.1    Arikan, M.2    Tiong, R.L.K.3
  • 5
    • 0000679438 scopus 로고
    • The Nash bargaining solution in economic modeling
    • Binmore K., Rubinstein A., Wolinsky A. The Nash bargaining solution in economic modeling. RAND J. Econ. 1986, 17(2):176-188.
    • (1986) RAND J. Econ. , vol.17 , Issue.2 , pp. 176-188
    • Binmore, K.1    Rubinstein, A.2    Wolinsky, A.3
  • 6
    • 48349095747 scopus 로고    scopus 로고
    • Public sector efficiency: the roles of political and budgetary institutions, fiscal capacity, and democratic participation
    • Borge L.E., Falch T., Tovmo P. Public sector efficiency: the roles of political and budgetary institutions, fiscal capacity, and democratic participation. Public Choice 2008, 136(3-4):475-495.
    • (2008) Public Choice , vol.136 , Issue.3-4 , pp. 475-495
    • Borge, L.E.1    Falch, T.2    Tovmo, P.3
  • 7
    • 84905270232 scopus 로고    scopus 로고
    • Concession period for PPPs: a win-win model for a fair risk sharing
    • Carbonara N., Costantino N., Pellegrino R. Concession period for PPPs: a win-win model for a fair risk sharing. Int. J. Proj. Manag. 2014, 32(7):1223-1232.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.7 , pp. 1223-1232
    • Carbonara, N.1    Costantino, N.2    Pellegrino, R.3
  • 9
    • 0029511404 scopus 로고
    • The BOT option: conflicts and compromises
    • David A.K., Fernando P.N. The BOT option: conflicts and compromises. Energy Policy 1995, 23(8):669-675.
    • (1995) Energy Policy , vol.23 , Issue.8 , pp. 669-675
    • David, A.K.1    Fernando, P.N.2
  • 10
    • 84866381303 scopus 로고    scopus 로고
    • Reasonable concession period for build-operate-transfer road projects in the Philippines
    • Hanaoka S., Palapus H.P. Reasonable concession period for build-operate-transfer road projects in the Philippines. Int. J. Proj. Manag. 2012, 30(8):938-949.
    • (2012) Int. J. Proj. Manag. , vol.30 , Issue.8 , pp. 938-949
    • Hanaoka, S.1    Palapus, H.P.2
  • 11
    • 0000294227 scopus 로고
    • Approaches to the bargaining problem before and after the theory of games: a critical discussion of Zeuthen's, Hick's and Nash's theories
    • Harsanyi J.C. Approaches to the bargaining problem before and after the theory of games: a critical discussion of Zeuthen's, Hick's and Nash's theories. Econometrica 1965, 24(2):144-157.
    • (1965) Econometrica , vol.24 , Issue.2 , pp. 144-157
    • Harsanyi, J.C.1
  • 13
    • 9544233567 scopus 로고    scopus 로고
    • Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
    • 1633.1564
    • Kang C.C., Feng C.M., Khan H.A. Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach. Comput. Oper. Res. 2005, 32(6):1633.1564.
    • (2005) Comput. Oper. Res. , vol.32 , Issue.6
    • Kang, C.C.1    Feng, C.M.2    Khan, H.A.3
  • 14
    • 84867458957 scopus 로고    scopus 로고
    • Risk management practice in China's public-private partnership projects
    • Ke Y., Wang S., Chan A.P. Risk management practice in China's public-private partnership projects. J. Civ. Eng. Manag. 2012, 18(5):675-684.
    • (2012) J. Civ. Eng. Manag. , vol.18 , Issue.5 , pp. 675-684
    • Ke, Y.1    Wang, S.2    Chan, A.P.3
  • 15
    • 84857355375 scopus 로고    scopus 로고
    • Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
    • Khanzadi M., Nasirzadeh F., Alipour M. Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. Autom. Constr. 2012, 22:368-376.
    • (2012) Autom. Constr. , vol.22 , pp. 368-376
    • Khanzadi, M.1    Nasirzadeh, F.2    Alipour, M.3
  • 17
    • 0035341384 scopus 로고    scopus 로고
    • Governmental role in BOT-led infrastructure development
    • Kumaraswamy M.M., Zhang X.Q. Governmental role in BOT-led infrastructure development. Int. J. Proj. Manag. 2001, 19(4):195-205.
    • (2001) Int. J. Proj. Manag. , vol.19 , Issue.4 , pp. 195-205
    • Kumaraswamy, M.M.1    Zhang, X.Q.2
  • 19
    • 0041764884 scopus 로고    scopus 로고
    • South Israel 100 million m3/y seawater desalination facility: build, operate and transfer (BOT) project
    • Lokiec F., Kronenberg G. South Israel 100 million m3/y seawater desalination facility: build, operate and transfer (BOT) project. Desalination 2003, 156:29-37.
    • (2003) Desalination , vol.156 , pp. 29-37
    • Lokiec, F.1    Kronenberg, G.2
  • 23
    • 0002021736 scopus 로고
    • Equilibrium points in n-person games
    • Nash J.F. Equilibrium points in n-person games. Proc. Natl. Acad. Sci. U.S.A. 1950, 36(1):48-49.
    • (1950) Proc. Natl. Acad. Sci. U.S.A. , vol.36 , Issue.1 , pp. 48-49
    • Nash, J.F.1
  • 24
    • 0001730497 scopus 로고
    • Non-coorperative games
    • Nash J.F. Non-coorperative games. Ann. Math. 1951, 54(2):289-295.
    • (1951) Ann. Math. , vol.54 , Issue.2 , pp. 289-295
    • Nash, J.F.1
  • 25
    • 0001058478 scopus 로고
    • Two-person cooperative games
    • Nash J.F. Two-person cooperative games. Econometrica 1953, 21(1):128-140.
    • (1953) Econometrica , vol.21 , Issue.1 , pp. 128-140
    • Nash, J.F.1
  • 26
    • 34547728279 scopus 로고    scopus 로고
    • A fuzzy simulation model for evaluating the concession items of public-private partnership schemes
    • Ng S.T., Xie J.Z., Skitmore M., Cheung Y.K. A fuzzy simulation model for evaluating the concession items of public-private partnership schemes. Autom. Constr. 2007, 17(1):22-29.
    • (2007) Autom. Constr. , vol.17 , Issue.1 , pp. 22-29
    • Ng, S.T.1    Xie, J.Z.2    Skitmore, M.3    Cheung, Y.K.4
  • 27
    • 0031121951 scopus 로고    scopus 로고
    • Automated approach to negotiation of BOT contracts
    • Ngee L., Tiong R.L.K., Alum J. Automated approach to negotiation of BOT contracts. J. Comput. Civ. Eng. ASCE 1997, 11(2):121-128.
    • (1997) J. Comput. Civ. Eng. ASCE , vol.11 , Issue.2 , pp. 121-128
    • Ngee, L.1    Tiong, R.L.K.2    Alum, J.3
  • 28
    • 84889664172 scopus 로고    scopus 로고
    • The feasibility of concentrated rural settlement in a context of post-disaster reconstruction: a study of China
    • Peng Y., Shen L., Zhang X., Ochoa J.J. The feasibility of concentrated rural settlement in a context of post-disaster reconstruction: a study of China. Disasters 2014, 38(1):108-124.
    • (2014) Disasters , vol.38 , Issue.1 , pp. 108-124
    • Peng, Y.1    Shen, L.2    Zhang, X.3    Ochoa, J.J.4
  • 29
    • 0001020937 scopus 로고
    • Arbitration schemes for generalized two-person games
    • Raiffa H. Arbitration schemes for generalized two-person games. Ann. Math. Stud. 1953, 28:361-387.
    • (1953) Ann. Math. Stud. , vol.28 , pp. 361-387
    • Raiffa, H.1
  • 32
    • 47349112974 scopus 로고    scopus 로고
    • The private partnership projects in Greece: risk ranking and preferred risk allocation.
    • Roumboutsos A., Anagnostopoulos K.P. The private partnership projects in Greece: risk ranking and preferred risk allocation. Constr. Manag. Econ. 2008, 26(7):751-763.
    • (2008) Constr. Manag. Econ. , vol.26 , Issue.7 , pp. 751-763
    • Roumboutsos, A.1    Anagnostopoulos, K.P.2
  • 33
    • 0003019549 scopus 로고
    • Perfect equilibrium in a bargaining model
    • Rubinstein A. Perfect equilibrium in a bargaining model. Econometrica 1982, 50(1):97-110.
    • (1982) Econometrica , vol.50 , Issue.1 , pp. 97-110
    • Rubinstein, A.1
  • 34
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build/operate/transfer contract projects
    • Shen L.Y., Wu Y.Z. Risk concession model for build/operate/transfer contract projects. J. Constr. Eng. Manag. ASCE 2005, 131(2):211-220.
    • (2005) J. Constr. Eng. Manag. ASCE , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 35
    • 0030391310 scopus 로고    scopus 로고
    • Application of BOT system for infrastructure projects
    • Shen L.Y., Lee R.K.H., Zhang Z. Application of BOT system for infrastructure projects. J. Constr. Eng. Manag. ASCE 1996, 122(4):319-323.
    • (1996) J. Constr. Eng. Manag. ASCE , vol.122 , Issue.4 , pp. 319-323
    • Shen, L.Y.1    Lee, R.K.H.2    Zhang, Z.3
  • 36
    • 12144277401 scopus 로고    scopus 로고
    • Alternative concession model for build operate transfer contract projects
    • Shen L.Y., Li H., Li Q.M. Alternative concession model for build operate transfer contract projects. J. Constr. Eng. Manag. ASCE 2002, 128(4):326-330.
    • (2002) J. Constr. Eng. Manag. ASCE , vol.128 , Issue.4 , pp. 326-330
    • Shen, L.Y.1    Li, H.2    Li, Q.M.3
  • 37
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining-game theory for negotiating concession period for BOT-type contract
    • Shen L.Y., Bao H.J., Wu Y.Z., Lu W.S. Using bargaining-game theory for negotiating concession period for BOT-type contract. J. Constr. Eng. Manag. ASCE 2007, 133(5):385-392.
    • (2007) J. Constr. Eng. Manag. ASCE , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Wu, Y.Z.3    Lu, W.S.4
  • 38
    • 84863407773 scopus 로고    scopus 로고
    • Critical assessment indicators for measuring benefits of rural infrastructure investment in China
    • Shen L., Lu W., Peng Y., Jiang S. Critical assessment indicators for measuring benefits of rural infrastructure investment in China. J. Infrastruct. Syst. ASCE 2011, 17(4):176-183.
    • (2011) J. Infrastruct. Syst. ASCE , vol.17 , Issue.4 , pp. 176-183
    • Shen, L.1    Lu, W.2    Peng, Y.3    Jiang, S.4
  • 39
    • 1942530582 scopus 로고    scopus 로고
    • The Huaibei power plant and its implications for the Chinese BOT market
    • Smith N., Zhang H., Zhu Y. The Huaibei power plant and its implications for the Chinese BOT market. Int. J. Proj. Manag. 2004, 22(5):407-413.
    • (2004) Int. J. Proj. Manag. , vol.22 , Issue.5 , pp. 407-413
    • Smith, N.1    Zhang, H.2    Zhu, Y.3
  • 40
    • 0032711692 scopus 로고    scopus 로고
    • Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures
    • Tam C.M. Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures. Int. J. Proj. Manag. 1999, 17(6):377-382.
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.6 , pp. 377-382
    • Tam, C.M.1
  • 42
    • 0029361061 scopus 로고
    • Impact of finance package versus technical solution in a BOT tender
    • Tiong R.L.K. Impact of finance package versus technical solution in a BOT tender. J. Constr. Eng. Manag. ASCE 1995, 121(3):304-311.
    • (1995) J. Constr. Eng. Manag. ASCE , vol.121 , Issue.3 , pp. 304-311
    • Tiong, R.L.K.1
  • 43
    • 85001576951 scopus 로고    scopus 로고
    • CSFs in competitive tendering and negotiation model for BOT projects
    • Tiong R.L.K. CSFs in competitive tendering and negotiation model for BOT projects. J. Constr. Eng. Manag. ASCE 1996, 122(3):205-211.
    • (1996) J. Constr. Eng. Manag. ASCE , vol.122 , Issue.3 , pp. 205-211
    • Tiong, R.L.K.1
  • 44
    • 0031126476 scopus 로고    scopus 로고
    • Financial commitments for BOT projects
    • Tiong R.L.K., Alum J. Financial commitments for BOT projects. Int. J. Proj. Manag. 1997, 15(2):73-78.
    • (1997) Int. J. Proj. Manag. , vol.15 , Issue.2 , pp. 73-78
    • Tiong, R.L.K.1    Alum, J.2
  • 45
    • 0002528013 scopus 로고    scopus 로고
    • Final negotiation in competitive BOT tender
    • Tiong R.L.K., Alum J. Final negotiation in competitive BOT tender. J. Constr. Eng. Manag. ASCE 1997, 123(1):6-10.
    • (1997) J. Constr. Eng. Manag. ASCE , vol.123 , Issue.1 , pp. 6-10
    • Tiong, R.L.K.1    Alum, J.2
  • 46
    • 38249022219 scopus 로고
    • Bargaining with common values
    • Vincent D.R. Bargaining with common values. J. Econ. Theory 1989, 48(1):47-62.
    • (1989) J. Econ. Theory , vol.48 , Issue.1 , pp. 47-62
    • Vincent, D.R.1
  • 48
    • 0032667280 scopus 로고    scopus 로고
    • Political risks: analysis of key contract clauses in China's BOT project
    • Wang S.Q., Tiong R.L.K., Ting S.K., Ashley D. Political risks: analysis of key contract clauses in China's BOT project. J. Constr. Eng. Manag. ASCE 1999, 125(3):190-197.
    • (1999) J. Constr. Eng. Manag. ASCE , vol.125 , Issue.3 , pp. 190-197
    • Wang, S.Q.1    Tiong, R.L.K.2    Ting, S.K.3    Ashley, D.4
  • 50
    • 0033879670 scopus 로고    scopus 로고
    • Positive management of differences for risk reduction in BOT projects
    • Yeo K.T., Tiong R.L.K. Positive management of differences for risk reduction in BOT projects. Int. J. Proj. Manag. 2000, 18(4):257-265.
    • (2000) Int. J. Proj. Manag. , vol.18 , Issue.4 , pp. 257-265
    • Yeo, K.T.1    Tiong, R.L.K.2
  • 51
    • 84872066527 scopus 로고    scopus 로고
    • A decision support system for the determination of concession period length in transportation project under BOT contract.
    • Yu C.Y., Lam K.C. A decision support system for the determination of concession period length in transportation project under BOT contract. Autom. Constr. 2013, 31:114-127.
    • (2013) Autom. Constr. , vol.31 , pp. 114-127
    • Yu, C.Y.1    Lam, K.C.2
  • 52
    • 12344319409 scopus 로고    scopus 로고
    • Critical success factors for public-private partnerships in infrastructure development
    • Zhang X. Critical success factors for public-private partnerships in infrastructure development. J. Constr. Eng. Manag. ASCE 2005, 131(1):3-14.
    • (2005) J. Constr. Eng. Manag. ASCE , vol.131 , Issue.1 , pp. 3-14
    • Zhang, X.1
  • 53
    • 79959987780 scopus 로고    scopus 로고
    • Web-based concession period analysis system
    • Zhang X.Q. Web-based concession period analysis system. Expert Syst. Appl. 2011, 38(11):13532-13542.
    • (2011) Expert Syst. Appl. , vol.38 , Issue.11 , pp. 13532-13542
    • Zhang, X.Q.1
  • 54
    • 33749004816 scopus 로고    scopus 로고
    • Determining a reasonable concession period for private sector provision of public works and services
    • Zhang X.Q., AbouRizk S.M. Determining a reasonable concession period for private sector provision of public works and services. Can. J. Civ. Eng. 2006, 33(5):622-631.
    • (2006) Can. J. Civ. Eng. , vol.33 , Issue.5 , pp. 622-631
    • Zhang, X.Q.1    AbouRizk, S.M.2
  • 55
    • 84922593252 scopus 로고    scopus 로고
    • PPP application in infrastructure development in China: institutional analysis and implications
    • Zhang S., Gao Y., Feng Z., Sun W. PPP application in infrastructure development in China: institutional analysis and implications. Int. J. Proj. Manag. 2015, 33(3):497-509.
    • (2015) Int. J. Proj. Manag. , vol.33 , Issue.3 , pp. 497-509
    • Zhang, S.1    Gao, Y.2    Feng, Z.3    Sun, W.4
  • 56
    • 33748184721 scopus 로고    scopus 로고
    • Public-private partnership projects: towards a model of contractor bidding decision-making
    • Zitron J. Public-private partnership projects: towards a model of contractor bidding decision-making. J. Purch. Supply Manag. 2006, 12(2):53-62.
    • (2006) J. Purch. Supply Manag. , vol.12 , Issue.2 , pp. 53-62
    • Zitron, J.1
  • 57
    • 84890193766 scopus 로고    scopus 로고
    • Identifying the critical success factors for relationship management in PPP projects
    • Zou W., Kumaraswamy M., Chung J., Wong J. Identifying the critical success factors for relationship management in PPP projects. Int. J. Proj. Manag. 2014, 32(2):265-274.
    • (2014) Int. J. Proj. Manag. , vol.32 , Issue.2 , pp. 265-274
    • Zou, W.1    Kumaraswamy, M.2    Chung, J.3    Wong, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.