Public sector efficiency: an international comparison
-
Afonso A., Schuknecht L., Tanzi V. Public sector efficiency: an international comparison. Public Choice 2005, 123(3-4):321-347.
-
(2005)
Public Choice
, vol.123
, Issue.3-4
, pp. 321-347
-
-
Afonso, A.1
Schuknecht, L.2
Tanzi, V.3
-
2
-
-
34548663905
-
Build-operate-transfer in infrastructure projects in the United States
-
Algarni A.M., Arditi D., Polat G. Build-operate-transfer in infrastructure projects in the United States. J. Constr. Eng. Manag. ASCE 2007, 133(10):728-735.
-
(2007)
J. Constr. Eng. Manag. ASCE
, vol.133
, Issue.10
, pp. 728-735
-
-
Algarni, A.M.1
Arditi, D.2
Polat, G.3
-
3
-
-
0029425663
-
Epistemic conditions for Nash equilibrium
-
Aumann R., Brandenburger A. Epistemic conditions for Nash equilibrium. Econometrica 1995, 63:1161-1180.
-
(1995)
Econometrica
, vol.63
, pp. 1161-1180
-
-
Aumann, R.1
Brandenburger, A.2
-
4
-
-
13944251011
-
Optimal capital structure model for BOT power projects in Turkey
-
Bakatjan S., Arikan M., Tiong R.L.K. Optimal capital structure model for BOT power projects in Turkey. J. Constr. Eng. Manag. ASCE 2003, 129(1):89-97.
-
(2003)
J. Constr. Eng. Manag. ASCE
, vol.129
, Issue.1
, pp. 89-97
-
-
Bakatjan, S.1
Arikan, M.2
Tiong, R.L.K.3
-
5
-
-
0000679438
-
The Nash bargaining solution in economic modeling
-
Binmore K., Rubinstein A., Wolinsky A. The Nash bargaining solution in economic modeling. RAND J. Econ. 1986, 17(2):176-188.
-
(1986)
RAND J. Econ.
, vol.17
, Issue.2
, pp. 176-188
-
-
Binmore, K.1
Rubinstein, A.2
Wolinsky, A.3
-
6
-
-
48349095747
-
Public sector efficiency: the roles of political and budgetary institutions, fiscal capacity, and democratic participation
-
Borge L.E., Falch T., Tovmo P. Public sector efficiency: the roles of political and budgetary institutions, fiscal capacity, and democratic participation. Public Choice 2008, 136(3-4):475-495.
-
(2008)
Public Choice
, vol.136
, Issue.3-4
, pp. 475-495
-
-
Borge, L.E.1
Falch, T.2
Tovmo, P.3
-
7
-
-
84905270232
-
Concession period for PPPs: a win-win model for a fair risk sharing
-
Carbonara N., Costantino N., Pellegrino R. Concession period for PPPs: a win-win model for a fair risk sharing. Int. J. Proj. Manag. 2014, 32(7):1223-1232.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, Issue.7
, pp. 1223-1232
-
-
Carbonara, N.1
Costantino, N.2
Pellegrino, R.3
-
9
-
-
0029511404
-
The BOT option: conflicts and compromises
-
David A.K., Fernando P.N. The BOT option: conflicts and compromises. Energy Policy 1995, 23(8):669-675.
-
(1995)
Energy Policy
, vol.23
, Issue.8
, pp. 669-675
-
-
David, A.K.1
Fernando, P.N.2
-
10
-
-
84866381303
-
Reasonable concession period for build-operate-transfer road projects in the Philippines
-
Hanaoka S., Palapus H.P. Reasonable concession period for build-operate-transfer road projects in the Philippines. Int. J. Proj. Manag. 2012, 30(8):938-949.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, Issue.8
, pp. 938-949
-
-
Hanaoka, S.1
Palapus, H.P.2
-
11
-
-
0000294227
-
Approaches to the bargaining problem before and after the theory of games: a critical discussion of Zeuthen's, Hick's and Nash's theories
-
Harsanyi J.C. Approaches to the bargaining problem before and after the theory of games: a critical discussion of Zeuthen's, Hick's and Nash's theories. Econometrica 1965, 24(2):144-157.
-
(1965)
Econometrica
, vol.24
, Issue.2
, pp. 144-157
-
-
Harsanyi, J.C.1
-
13
-
-
9544233567
-
Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
-
1633.1564
-
Kang C.C., Feng C.M., Khan H.A. Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach. Comput. Oper. Res. 2005, 32(6):1633.1564.
-
(2005)
Comput. Oper. Res.
, vol.32
, Issue.6
-
-
Kang, C.C.1
Feng, C.M.2
Khan, H.A.3
-
14
-
-
84867458957
-
Risk management practice in China's public-private partnership projects
-
Ke Y., Wang S., Chan A.P. Risk management practice in China's public-private partnership projects. J. Civ. Eng. Manag. 2012, 18(5):675-684.
-
(2012)
J. Civ. Eng. Manag.
, vol.18
, Issue.5
, pp. 675-684
-
-
Ke, Y.1
Wang, S.2
Chan, A.P.3
-
15
-
-
84857355375
-
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
-
Khanzadi M., Nasirzadeh F., Alipour M. Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. Autom. Constr. 2012, 22:368-376.
-
(2012)
Autom. Constr.
, vol.22
, pp. 368-376
-
-
Khanzadi, M.1
Nasirzadeh, F.2
Alipour, M.3
-
17
-
-
0035341384
-
Governmental role in BOT-led infrastructure development
-
Kumaraswamy M.M., Zhang X.Q. Governmental role in BOT-led infrastructure development. Int. J. Proj. Manag. 2001, 19(4):195-205.
-
(2001)
Int. J. Proj. Manag.
, vol.19
, Issue.4
, pp. 195-205
-
-
Kumaraswamy, M.M.1
Zhang, X.Q.2
-
19
-
-
0041764884
-
South Israel 100 million m3/y seawater desalination facility: build, operate and transfer (BOT) project
-
Lokiec F., Kronenberg G. South Israel 100 million m3/y seawater desalination facility: build, operate and transfer (BOT) project. Desalination 2003, 156:29-37.
-
(2003)
Desalination
, vol.156
, pp. 29-37
-
-
Lokiec, F.1
Kronenberg, G.2
-
23
-
-
0002021736
-
Equilibrium points in n-person games
-
Nash J.F. Equilibrium points in n-person games. Proc. Natl. Acad. Sci. U.S.A. 1950, 36(1):48-49.
-
(1950)
Proc. Natl. Acad. Sci. U.S.A.
, vol.36
, Issue.1
, pp. 48-49
-
-
Nash, J.F.1
-
24
-
-
0001730497
-
Non-coorperative games
-
Nash J.F. Non-coorperative games. Ann. Math. 1951, 54(2):289-295.
-
(1951)
Ann. Math.
, vol.54
, Issue.2
, pp. 289-295
-
-
Nash, J.F.1
-
25
-
-
0001058478
-
Two-person cooperative games
-
Nash J.F. Two-person cooperative games. Econometrica 1953, 21(1):128-140.
-
(1953)
Econometrica
, vol.21
, Issue.1
, pp. 128-140
-
-
Nash, J.F.1
-
26
-
-
34547728279
-
A fuzzy simulation model for evaluating the concession items of public-private partnership schemes
-
Ng S.T., Xie J.Z., Skitmore M., Cheung Y.K. A fuzzy simulation model for evaluating the concession items of public-private partnership schemes. Autom. Constr. 2007, 17(1):22-29.
-
(2007)
Autom. Constr.
, vol.17
, Issue.1
, pp. 22-29
-
-
Ng, S.T.1
Xie, J.Z.2
Skitmore, M.3
Cheung, Y.K.4
-
27
-
-
0031121951
-
Automated approach to negotiation of BOT contracts
-
Ngee L., Tiong R.L.K., Alum J. Automated approach to negotiation of BOT contracts. J. Comput. Civ. Eng. ASCE 1997, 11(2):121-128.
-
(1997)
J. Comput. Civ. Eng. ASCE
, vol.11
, Issue.2
, pp. 121-128
-
-
Ngee, L.1
Tiong, R.L.K.2
Alum, J.3
-
28
-
-
84889664172
-
The feasibility of concentrated rural settlement in a context of post-disaster reconstruction: a study of China
-
Peng Y., Shen L., Zhang X., Ochoa J.J. The feasibility of concentrated rural settlement in a context of post-disaster reconstruction: a study of China. Disasters 2014, 38(1):108-124.
-
(2014)
Disasters
, vol.38
, Issue.1
, pp. 108-124
-
-
Peng, Y.1
Shen, L.2
Zhang, X.3
Ochoa, J.J.4
-
29
-
-
0001020937
-
Arbitration schemes for generalized two-person games
-
Raiffa H. Arbitration schemes for generalized two-person games. Ann. Math. Stud. 1953, 28:361-387.
-
(1953)
Ann. Math. Stud.
, vol.28
, pp. 361-387
-
-
Raiffa, H.1
-
32
-
-
47349112974
-
The private partnership projects in Greece: risk ranking and preferred risk allocation.
-
Roumboutsos A., Anagnostopoulos K.P. The private partnership projects in Greece: risk ranking and preferred risk allocation. Constr. Manag. Econ. 2008, 26(7):751-763.
-
(2008)
Constr. Manag. Econ.
, vol.26
, Issue.7
, pp. 751-763
-
-
Roumboutsos, A.1
Anagnostopoulos, K.P.2
-
33
-
-
0003019549
-
Perfect equilibrium in a bargaining model
-
Rubinstein A. Perfect equilibrium in a bargaining model. Econometrica 1982, 50(1):97-110.
-
(1982)
Econometrica
, vol.50
, Issue.1
, pp. 97-110
-
-
Rubinstein, A.1
-
34
-
-
12744271519
-
Risk concession model for build/operate/transfer contract projects
-
Shen L.Y., Wu Y.Z. Risk concession model for build/operate/transfer contract projects. J. Constr. Eng. Manag. ASCE 2005, 131(2):211-220.
-
(2005)
J. Constr. Eng. Manag. ASCE
, vol.131
, Issue.2
, pp. 211-220
-
-
Shen, L.Y.1
Wu, Y.Z.2
-
35
-
-
0030391310
-
Application of BOT system for infrastructure projects
-
Shen L.Y., Lee R.K.H., Zhang Z. Application of BOT system for infrastructure projects. J. Constr. Eng. Manag. ASCE 1996, 122(4):319-323.
-
(1996)
J. Constr. Eng. Manag. ASCE
, vol.122
, Issue.4
, pp. 319-323
-
-
Shen, L.Y.1
Lee, R.K.H.2
Zhang, Z.3
-
36
-
-
12144277401
-
Alternative concession model for build operate transfer contract projects
-
Shen L.Y., Li H., Li Q.M. Alternative concession model for build operate transfer contract projects. J. Constr. Eng. Manag. ASCE 2002, 128(4):326-330.
-
(2002)
J. Constr. Eng. Manag. ASCE
, vol.128
, Issue.4
, pp. 326-330
-
-
Shen, L.Y.1
Li, H.2
Li, Q.M.3
-
37
-
-
34247222582
-
Using bargaining-game theory for negotiating concession period for BOT-type contract
-
Shen L.Y., Bao H.J., Wu Y.Z., Lu W.S. Using bargaining-game theory for negotiating concession period for BOT-type contract. J. Constr. Eng. Manag. ASCE 2007, 133(5):385-392.
-
(2007)
J. Constr. Eng. Manag. ASCE
, vol.133
, Issue.5
, pp. 385-392
-
-
Shen, L.Y.1
Bao, H.J.2
Wu, Y.Z.3
Lu, W.S.4
-
38
-
-
84863407773
-
Critical assessment indicators for measuring benefits of rural infrastructure investment in China
-
Shen L., Lu W., Peng Y., Jiang S. Critical assessment indicators for measuring benefits of rural infrastructure investment in China. J. Infrastruct. Syst. ASCE 2011, 17(4):176-183.
-
(2011)
J. Infrastruct. Syst. ASCE
, vol.17
, Issue.4
, pp. 176-183
-
-
Shen, L.1
Lu, W.2
Peng, Y.3
Jiang, S.4
-
39
-
-
1942530582
-
The Huaibei power plant and its implications for the Chinese BOT market
-
Smith N., Zhang H., Zhu Y. The Huaibei power plant and its implications for the Chinese BOT market. Int. J. Proj. Manag. 2004, 22(5):407-413.
-
(2004)
Int. J. Proj. Manag.
, vol.22
, Issue.5
, pp. 407-413
-
-
Smith, N.1
Zhang, H.2
Zhu, Y.3
-
40
-
-
0032711692
-
Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures
-
Tam C.M. Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures. Int. J. Proj. Manag. 1999, 17(6):377-382.
-
(1999)
Int. J. Proj. Manag.
, vol.17
, Issue.6
, pp. 377-382
-
-
Tam, C.M.1
-
42
-
-
0029361061
-
Impact of finance package versus technical solution in a BOT tender
-
Tiong R.L.K. Impact of finance package versus technical solution in a BOT tender. J. Constr. Eng. Manag. ASCE 1995, 121(3):304-311.
-
(1995)
J. Constr. Eng. Manag. ASCE
, vol.121
, Issue.3
, pp. 304-311
-
-
Tiong, R.L.K.1
-
43
-
-
85001576951
-
CSFs in competitive tendering and negotiation model for BOT projects
-
Tiong R.L.K. CSFs in competitive tendering and negotiation model for BOT projects. J. Constr. Eng. Manag. ASCE 1996, 122(3):205-211.
-
(1996)
J. Constr. Eng. Manag. ASCE
, vol.122
, Issue.3
, pp. 205-211
-
-
Tiong, R.L.K.1
-
44
-
-
0031126476
-
Financial commitments for BOT projects
-
Tiong R.L.K., Alum J. Financial commitments for BOT projects. Int. J. Proj. Manag. 1997, 15(2):73-78.
-
(1997)
Int. J. Proj. Manag.
, vol.15
, Issue.2
, pp. 73-78
-
-
Tiong, R.L.K.1
Alum, J.2
-
45
-
-
0002528013
-
Final negotiation in competitive BOT tender
-
Tiong R.L.K., Alum J. Final negotiation in competitive BOT tender. J. Constr. Eng. Manag. ASCE 1997, 123(1):6-10.
-
(1997)
J. Constr. Eng. Manag. ASCE
, vol.123
, Issue.1
, pp. 6-10
-
-
Tiong, R.L.K.1
Alum, J.2
-
46
-
-
38249022219
-
Bargaining with common values
-
Vincent D.R. Bargaining with common values. J. Econ. Theory 1989, 48(1):47-62.
-
(1989)
J. Econ. Theory
, vol.48
, Issue.1
, pp. 47-62
-
-
Vincent, D.R.1
-
48
-
-
0032667280
-
Political risks: analysis of key contract clauses in China's BOT project
-
Wang S.Q., Tiong R.L.K., Ting S.K., Ashley D. Political risks: analysis of key contract clauses in China's BOT project. J. Constr. Eng. Manag. ASCE 1999, 125(3):190-197.
-
(1999)
J. Constr. Eng. Manag. ASCE
, vol.125
, Issue.3
, pp. 190-197
-
-
Wang, S.Q.1
Tiong, R.L.K.2
Ting, S.K.3
Ashley, D.4
-
49
-
-
84655169586
-
System dynamics (SD)-based concession pricing model for PPP highway projects
-
Xu Y.L., Sun C.S., Skibniewski M.J., Chan A.P.C., Yeung J.F.Y., Cheng H. System dynamics (SD)-based concession pricing model for PPP highway projects. Int. J. Proj. Manag. 2012, 30(2):240-251.
-
(2012)
Int. J. Proj. Manag.
, vol.30
, Issue.2
, pp. 240-251
-
-
Xu, Y.L.1
Sun, C.S.2
Skibniewski, M.J.3
Chan, A.P.C.4
Yeung, J.F.Y.5
Cheng, H.6
-
50
-
-
0033879670
-
Positive management of differences for risk reduction in BOT projects
-
Yeo K.T., Tiong R.L.K. Positive management of differences for risk reduction in BOT projects. Int. J. Proj. Manag. 2000, 18(4):257-265.
-
(2000)
Int. J. Proj. Manag.
, vol.18
, Issue.4
, pp. 257-265
-
-
Yeo, K.T.1
Tiong, R.L.K.2
-
51
-
-
84872066527
-
A decision support system for the determination of concession period length in transportation project under BOT contract.
-
Yu C.Y., Lam K.C. A decision support system for the determination of concession period length in transportation project under BOT contract. Autom. Constr. 2013, 31:114-127.
-
(2013)
Autom. Constr.
, vol.31
, pp. 114-127
-
-
Yu, C.Y.1
Lam, K.C.2
-
52
-
-
12344319409
-
Critical success factors for public-private partnerships in infrastructure development
-
Zhang X. Critical success factors for public-private partnerships in infrastructure development. J. Constr. Eng. Manag. ASCE 2005, 131(1):3-14.
-
(2005)
J. Constr. Eng. Manag. ASCE
, vol.131
, Issue.1
, pp. 3-14
-
-
Zhang, X.1
-
53
-
-
79959987780
-
Web-based concession period analysis system
-
Zhang X.Q. Web-based concession period analysis system. Expert Syst. Appl. 2011, 38(11):13532-13542.
-
(2011)
Expert Syst. Appl.
, vol.38
, Issue.11
, pp. 13532-13542
-
-
Zhang, X.Q.1
-
54
-
-
33749004816
-
Determining a reasonable concession period for private sector provision of public works and services
-
Zhang X.Q., AbouRizk S.M. Determining a reasonable concession period for private sector provision of public works and services. Can. J. Civ. Eng. 2006, 33(5):622-631.
-
(2006)
Can. J. Civ. Eng.
, vol.33
, Issue.5
, pp. 622-631
-
-
Zhang, X.Q.1
AbouRizk, S.M.2
-
55
-
-
84922593252
-
PPP application in infrastructure development in China: institutional analysis and implications
-
Zhang S., Gao Y., Feng Z., Sun W. PPP application in infrastructure development in China: institutional analysis and implications. Int. J. Proj. Manag. 2015, 33(3):497-509.
-
(2015)
Int. J. Proj. Manag.
, vol.33
, Issue.3
, pp. 497-509
-
-
Zhang, S.1
Gao, Y.2
Feng, Z.3
Sun, W.4
-
56
-
-
33748184721
-
Public-private partnership projects: towards a model of contractor bidding decision-making
-
Zitron J. Public-private partnership projects: towards a model of contractor bidding decision-making. J. Purch. Supply Manag. 2006, 12(2):53-62.
-
(2006)
J. Purch. Supply Manag.
, vol.12
, Issue.2
, pp. 53-62
-
-
Zitron, J.1
-
57
-
-
84890193766
-
Identifying the critical success factors for relationship management in PPP projects
-
Zou W., Kumaraswamy M., Chung J., Wong J. Identifying the critical success factors for relationship management in PPP projects. Int. J. Proj. Manag. 2014, 32(2):265-274.
-
(2014)
Int. J. Proj. Manag.
, vol.32
, Issue.2
, pp. 265-274
-
-
Zou, W.1
Kumaraswamy, M.2
Chung, J.3
Wong, J.4
|