메뉴 건너뛰기




Volumn 11, Issue 2, 1997, Pages 121-128

Automated approach to negotiation of BOT contracts

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMATION; CONSTRUCTION; ECONOMICS; FINANCE; MAINTENANCE; MATHEMATICAL MODELS; PROJECT MANAGEMENT; REGRESSION ANALYSIS; SPREADSHEETS; STRUCTURAL DESIGN;

EID: 0031121951     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(1997)11:2(121)     Document Type: Article
Times cited : (34)

References (8)
  • 1
    • 84930768955 scopus 로고
    • Lecture at Ctr. for Advanced Constr. Studies, Nanyang Technol. Univ., Singapore
    • Issen, R. (1992). "The Johor water privatization project." Lecture at Ctr. for Advanced Constr. Studies, Nanyang Technol. Univ., Singapore.
    • (1992) The Johor Water Privatization Project
    • Issen, R.1
  • 2
    • 84889545503 scopus 로고
    • Concession contracts for power generation
    • Merna, A., and Smith, N. J. (1991). "Concession contracts for power generation." J. Engrg. Constr. and Arch., 1(1), 17-27.
    • (1991) J. Engrg. Constr. and Arch. , vol.1 , Issue.1 , pp. 17-27
    • Merna, A.1    Smith, N.J.2
  • 5
    • 44949274979 scopus 로고
    • Financial and contractual aspects of BOT projects
    • London, England
    • Tiong, L. K. R., and McCarthy, S. C. (1991). "Financial and contractual aspects of BOT projects." Int. J. Proj. Mgmt., London, England, 9(4), 222-227.
    • (1991) Int. J. Proj. Mgmt. , vol.9 , Issue.4 , pp. 222-227
    • Tiong, L.K.R.1    McCarthy, S.C.2
  • 6
    • 0026883757 scopus 로고
    • Critical success factors in winning BOT contracts
    • ASCE
    • Tiong, L. K. R., Yeo, K. M., and McCarthy, S. C. (1992). "Critical success factors in winning BOT contracts." J. Constr. Engrg. and Mgmt., ASCE, 118(2), 217-228.
    • (1992) J. Constr. Engrg. and Mgmt. , vol.118 , Issue.2 , pp. 217-228
    • Tiong, L.K.R.1    Yeo, K.M.2    McCarthy, S.C.3
  • 7
    • 85033321396 scopus 로고
    • The Turkish BOT power project
    • U.S. Agency for Int. Devel., Energy Ofc., Washington, D.C.
    • Williamson, S. E. (1988). "The Turkish BOT power project," Proc., Philippines Private Power Sem., U.S. Agency for Int. Devel., Energy Ofc., Washington, D.C.
    • (1988) Proc., Philippines Private Power Sem.
    • Williamson, S.E.1
  • 8
    • 5244277422 scopus 로고
    • Build-operate-transfer: The Hopewell experience
    • Ctr. for Advanced Const. Studies, Singapore
    • Wu, G. (1991). "Build-operate-transfer: the Hopewell experience." Proc., Conf. on Int. Constr. Marketing and Proj. Financing, Ctr. for Advanced Const. Studies, Singapore.
    • (1991) Proc., Conf. on Int. Constr. Marketing and Proj. Financing
    • Wu, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.