메뉴 건너뛰기




Volumn 17, Issue 1, 2007, Pages 22-29

A fuzzy simulation model for evaluating the concession items of public-private partnership schemes

Author keywords

Concession period; Fuzzy sets; Public private partnership; Simulation; Tariff regime

Indexed keywords

COMPUTER SIMULATION; DECISION MAKING; INVESTMENTS; PROJECT MANAGEMENT;

EID: 34547728279     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2007.02.010     Document Type: Article
Times cited : (59)

References (39)
  • 1
    • 33645236338 scopus 로고    scopus 로고
    • BOOT schemes - a project delivery system for a new millennium
    • (March)
    • Angeles N.H., and Walker D. BOOT schemes - a project delivery system for a new millennium. Chartered Building Professional (2000) 21-23 (March)
    • (2000) Chartered Building Professional , pp. 21-23
    • Angeles, N.H.1    Walker, D.2
  • 5
    • 0343085947 scopus 로고    scopus 로고
    • The practical application of delivery methods to project portfolios
    • Miller J.B., and Evje R.H. The practical application of delivery methods to project portfolios. Construction Management & Economics 17 (1999) 669-677
    • (1999) Construction Management & Economics , vol.17 , pp. 669-677
    • Miller, J.B.1    Evje, R.H.2
  • 7
    • 0036857280 scopus 로고    scopus 로고
    • Procurement methods for US infrastructure: historical perspectives and recent trends
    • Pietroforte R., and Miller J.B. Procurement methods for US infrastructure: historical perspectives and recent trends. Building and Research Information 30 6 (2002) 425-434
    • (2002) Building and Research Information , vol.30 , Issue.6 , pp. 425-434
    • Pietroforte, R.1    Miller, J.B.2
  • 8
    • 34547736675 scopus 로고    scopus 로고
    • Public-private partnerships for infrastructure development: case study of the 895 connector project
    • Proceedings: CIB W92 Procurement Systems Symposium, Procurement Systems and Technology Transfer. Lewis T.M. (Ed) January 14-17
    • Vorster M., Songer A.D., and Morgan H. Public-private partnerships for infrastructure development: case study of the 895 connector project. In: Lewis T.M. (Ed). Proceedings: CIB W92 Procurement Systems Symposium, Procurement Systems and Technology Transfer. The University of The West Indies, Trinidad and Tobago (2002) 41-51 January 14-17
    • (2002) The University of The West Indies, Trinidad and Tobago , pp. 41-51
    • Vorster, M.1    Songer, A.D.2    Morgan, H.3
  • 10
    • 33645239877 scopus 로고    scopus 로고
    • Private financing of construction projects and procurement systems: an integrated approach
    • Duncan (Ed), Wellington, NZ, CIB, Netherland April 2-6
    • Chege L.W., and Rwelamila P.D. Private financing of construction projects and procurement systems: an integrated approach. In: Duncan (Ed). Proceedings: CIB World Building Congress, Performance in Product and Practice (2001), Wellington, NZ, CIB, Netherland April 2-6
    • (2001) Proceedings: CIB World Building Congress, Performance in Product and Practice
    • Chege, L.W.1    Rwelamila, P.D.2
  • 14
    • 34547787858 scopus 로고    scopus 로고
    • From the three P's to the three W's - public private partnerships and beyond
    • Elliott P., and Boyd T. (Eds), Customs House, Brisbane January 19-22, 22 pp.
    • Earl G., and Regan M. From the three P's to the three W's - public private partnerships and beyond. In: Elliott P., and Boyd T. (Eds). Proceedings: 9th Annual Conference of the Pacific Rim Real Estate Society (PRRES) (2003), Customs House, Brisbane January 19-22, 22 pp.
    • (2003) Proceedings: 9th Annual Conference of the Pacific Rim Real Estate Society (PRRES)
    • Earl, G.1    Regan, M.2
  • 18
    • 34547726935 scopus 로고    scopus 로고
    • Decision-making model for concession period in BOT contract infrastructure project
    • Shen L.Y., and Li Q.M. Decision-making model for concession period in BOT contract infrastructure project. Journal of Industrial Engineering and Engineering Management 14 1 (2000) 43-47
    • (2000) Journal of Industrial Engineering and Engineering Management , vol.14 , Issue.1 , pp. 43-47
    • Shen, L.Y.1    Li, Q.M.2
  • 19
    • 0032630817 scopus 로고    scopus 로고
    • Build operate transfer municipal bridge projects in India
    • Malini E. Build operate transfer municipal bridge projects in India. Journal of Management in Engineering, ASCE 15 4 (1999) 51-58
    • (1999) Journal of Management in Engineering, ASCE , vol.15 , Issue.4 , pp. 51-58
    • Malini, E.1
  • 21
    • 34547746142 scopus 로고    scopus 로고
    • Risk analysis to assess completion time of a tram-line
    • Cagno E., and di Milano P. Risk analysis to assess completion time of a tram-line. Project Management 7 1 (2001) 26-31
    • (2001) Project Management , vol.7 , Issue.1 , pp. 26-31
    • Cagno, E.1    di Milano, P.2
  • 24
    • 0001998441 scopus 로고
    • On the min-max composition of fuzzy matrices
    • Ragab M.Z., and Emam E.G. On the min-max composition of fuzzy matrices. Fuzzy Sets and Systems 75 1 (1995) 83-92
    • (1995) Fuzzy Sets and Systems , vol.75 , Issue.1 , pp. 83-92
    • Ragab, M.Z.1    Emam, E.G.2
  • 26
    • 0016900196 scopus 로고
    • Resolution of composite fuzzy relation equation
    • Sanchez E. Resolution of composite fuzzy relation equation. Information and Control 30 (1976) 38-48
    • (1976) Information and Control , vol.30 , pp. 38-48
    • Sanchez, E.1
  • 27
    • 34547806828 scopus 로고
    • School of Computer Science, Carnegie Mellon University http://www.cs.cmu.edu/Groups/AI/html/faqs/ai/fuzzy/part1/faq-doc-4.html
    • CMU. What is a Fuzzy Expert System? (1993), School of Computer Science, Carnegie Mellon University. http://www.cs.cmu.edu/Groups/AI/html/faqs/ai/fuzzy/part1/faq-doc-4.html http://www.cs.cmu.edu/Groups/AI/html/faqs/ai/fuzzy/part1/faq-doc-4.html
    • (1993) What is a Fuzzy Expert System?
    • CMU1
  • 28
    • 0000571075 scopus 로고    scopus 로고
    • Fuzzy multiattribute decision-making models and methods with incomplete preference information
    • Li D. Fuzzy multiattribute decision-making models and methods with incomplete preference information. Fuzzy Sets and Systems 106 (1997) 113-119
    • (1997) Fuzzy Sets and Systems , vol.106 , pp. 113-119
    • Li, D.1
  • 30
    • 0035476791 scopus 로고    scopus 로고
    • A fuzzy approach to construction project risk assessment and analysis: construction project risk management system
    • Chrr V., and Tah J.H.M. A fuzzy approach to construction project risk assessment and analysis: construction project risk management system. Advances in Engineering Software 32 (2001) 847-857
    • (2001) Advances in Engineering Software , vol.32 , pp. 847-857
    • Chrr, V.1    Tah, J.H.M.2
  • 34
    • 33749004816 scopus 로고    scopus 로고
    • Determining a reasonable concession period for private sector provision of public works and services
    • Zhang X., and AbouRizk S.M. Determining a reasonable concession period for private sector provision of public works and services. Canadian Journal of Civil Engineering 33 5 (2006) 622-631
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.5 , pp. 622-631
    • Zhang, X.1    AbouRizk, S.M.2
  • 35
    • 0041622910 scopus 로고    scopus 로고
    • The effect of concession period design on completion risk management of BOT projects
    • Ye S., and Tiong R.L.K. The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics 21 5 (2003) 471-482
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 471-482
    • Ye, S.1    Tiong, R.L.K.2
  • 37
    • 0034831215 scopus 로고    scopus 로고
    • Minimum building life-cycle cost design criteria I: methodology
    • Wen Y.K., and Kang Y.J. Minimum building life-cycle cost design criteria I: methodology. Journal of Structural Engineering 127 3 (2001) 330-337
    • (2001) Journal of Structural Engineering , vol.127 , Issue.3 , pp. 330-337
    • Wen, Y.K.1    Kang, Y.J.2
  • 39
    • 49649152119 scopus 로고
    • Similarity relations and fuzzy orderings
    • Zadeh L.A. Similarity relations and fuzzy orderings. Information Science 3 (1971) 177-200
    • (1971) Information Science , vol.3 , pp. 177-200
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.