Volumn 33, Issue 5, 2006, Pages 622-631

Determining a reasonable concession period for private sector provision of public works and services

Author keywords

Build own transfer; Concession; Critical path method; Financial management; Infrastructure; Monte Carlo simulation; Partnerships; Procurement; Risk analysis

Indexed keywords

COMPUTER SIMULATION; FINANCE; MONTE CARLO METHODS; RISK ASSESSMENT; SUSTAINABLE DEVELOPMENT;

EID: 33749004816     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L06-010     Document Type: Article
Times cited : (57)

References (23)
  • 2
    • 12444288242 scopus 로고    scopus 로고
    • Enlightened risk allocation: The twenty-first century owner's guide to cost effectiveness
    • American Consulting Engineers Council and Associated General Contractors of America 1998. Washington, D.C
    • American Consulting Engineers Council and Associated General Contractors of America 1998. Enlightened risk allocation: the twenty-first century owner's guide to cost effectiveness. Washington, D.C.
  • 6
    • 12344272424 scopus 로고    scopus 로고
    • BOO/BOT projects: A commercial and contractual guide
    • Sweet and Maxwell Limited, London, U.K
    • Delmon, J. 2000. BOO/BOT projects: a commercial and contractual guide. Sweet and Maxwell Limited, London, U.K.
    • (2000)
    • Delmon, J.1
  • 7
    • 18844364009 scopus 로고    scopus 로고
    • Life-cycle costing: Using activity-based costing and Monte Carlo methods to manage future costs and risks
    • John Wiley and Sons, New Jersey, N.J
    • Emblemsvag, J. 2003. Life-cycle costing: using activity-based costing and Monte Carlo methods to manage future costs and risks. John Wiley and Sons, New Jersey, N.J.
    • (2003)
    • Emblemsvag, J.1
  • 9
    • 0343310370 scopus 로고    scopus 로고
    • DBFO value in roads: A case study of the first eight DBFO road contracts and their development
    • Highways Agency London, U.K
    • Highways Agency 1997. DBFO value in roads: a case study of the first eight DBFO road contracts and their development. London, U.K.
    • (1997)
  • 10
    • 84862873171 scopus 로고    scopus 로고
    • The public sector comparator - A Canadian best practice guide
    • Industry Canada Ottawa, Canada
    • Industry Canada 2003. The public sector comparator - a Canadian best practice guide. Ottawa, Canada.
    • (2003)
  • 11
    • 0033506925 scopus 로고    scopus 로고
    • Project finance in developing countries
    • International Finance Corporation Washington, D.C
    • International Finance Corporation 1999. Project finance in developing countries. Washington, D.C.
    • (1999)
  • 12
    • 0003266269 scopus 로고    scopus 로고
    • Guide to the preparation and evaluation of build-own-operate-transfer (BOOT) project tenders
    • Hong Kong
    • Merna, A., and Smith, N.J. 1996. Guide to the preparation and evaluation of build-own-operate-transfer (BOOT) project tenders. Asia Law and Practice, Hong Kong.
    • (1996) Asia Law and Practice
    • Merna, A.1    Smith, N.J.2
  • 14
    • 20444502274 scopus 로고    scopus 로고
    • For the good of the people: Using public-private partnerships to meet America's essential needs
    • National Council for Public-Private Partnerships Washington, D.C
    • National Council for Public-Private Partnerships 2002. For the good of the people: using public-private partnerships to meet America's essential needs. Washington, D.C.
    • (2002)
  • 15
    • 0003898887 scopus 로고    scopus 로고
    • A guide to the project management body of knowledge
    • Project Management Institute Penn
    • Project Management Institute 2000. A guide to the project management body of knowledge. Penn.
    • (2000)
  • 17
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build/operate/transfer contract projects
    • Shen, L.Y., and Wu, Y.Z. 2005. Risk concession model for build/operate/ transfer contract projects. Journal of Construction Engineering and Management, 131: 211-220.
    • (2005) Journal of Construction Engineering and Management , vol.131 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 18
    • 0003470956 scopus 로고    scopus 로고
    • Technical note No. 5: How to construct a public sector comparator
    • Treasury Taskforce London, U.K
    • Treasury Taskforce 1999. Technical note No. 5: how to construct a public sector comparator. London, U.K.
    • (1999)
  • 20
    • 22144438501 scopus 로고    scopus 로고
    • Monte Carlo risk analysis and due diligence of new business ventures
    • AMACOM, New York, N.Y
    • Wright, J.F. 2002. Monte Carlo risk analysis and due diligence of new business ventures. AMACOM, New York, N.Y.
    • (2002)
    • Wright, J.F.1
  • 21
  • 22
    • 0041622910 scopus 로고    scopus 로고
    • The effect of concession period design on completion risk management of BOT projects
    • Ye, S.D., and Tiong, R.L.K. 2003. The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics, 21: 471-482.
    • (2003) Construction Management and Economics , vol.21 , pp. 471-482
    • Ye, S.D.1    Tiong, R.L.K.2
  • 23
    • 20444441426 scopus 로고    scopus 로고
    • Financial viability analysis and capital structure optimization in privatized public infrastructure projects
    • Zhang, X.Q. 2005. Financial viability analysis and capital structure optimization in privatized public infrastructure projects. Journal of Construction Engineering and Management, 131: 656-668.
    • (2005) Journal of Construction Engineering and Management , vol.131 , pp. 656-668
    • Zhang, X.Q.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.