Minimum feasible tariff model for BOT water supply projects in Malaysia
-
Cheng L.Y., Tiong R.L.K. Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics 2005, 23(3):255-263.
-
(2005)
Construction Management and Economics
, vol.23
, Issue.3
, pp. 255-263
-
-
Cheng, L.Y.1
Tiong, R.L.K.2
-
2
-
-
84655173900
-
Serving the community by using the private sector - an introductory guide to public private partnerships (PPPs)
-
Efficiency Unit
-
Efficiency Unit Serving the community by using the private sector - an introductory guide to public private partnerships (PPPs). Hong Kong Special Administrative Region Government, March 2008, Second Edition.
-
(2008)
Hong Kong Special Administrative Region Government, March
-
-
-
3
-
-
57449114311
-
Tools for selecting appropriate risk management techniques in the built environment
-
Forbes D., Smith S., Horner M. Tools for selecting appropriate risk management techniques in the built environment. Construction Management and Economics 2008, 26(11):1241-1250.
-
(2008)
Construction Management and Economics
, vol.26
, Issue.11
, pp. 1241-1250
-
-
Forbes, D.1
Smith, S.2
Horner, M.3
-
4
-
-
9144224430
-
Designing safe systems: using system dynamics to understand complexity
-
Gillespie D.F., Robards K.J., Cho S. Designing safe systems: using system dynamics to understand complexity. Natural Hazards Review 2004, 5(2):82-88.
-
(2004)
Natural Hazards Review
, vol.5
, Issue.2
, pp. 82-88
-
-
Gillespie, D.F.1
Robards, K.J.2
Cho, S.3
-
5
-
-
70449438312
-
-
Southeast University Press, NanJing
-
Huang Y.L., Xu X.Y., Tan F., Li X.S. Engineering Economics 2004, Southeast University Press, NanJing.
-
(2004)
Engineering Economics
-
-
Huang, Y.L.1
Xu, X.Y.2
Tan, F.3
Li, X.S.4
-
6
-
-
33646423563
-
Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects
-
Huang Y.L., Chou S.P. Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics 2006, 24(4):379-389.
-
(2006)
Construction Management and Economics
, vol.24
, Issue.4
, pp. 379-389
-
-
Huang, Y.L.1
Chou, S.P.2
-
7
-
-
75649141315
-
Hierarchical structuring of PPP risks using interpretative structural modeling
-
Iyer K.C., Sagheer M. Hierarchical structuring of PPP risks using interpretative structural modeling. J. Constr. Eng. Manag. 2010, 136(2):151-159.
-
(2010)
J. Constr. Eng. Manag.
, vol.136
, Issue.2
, pp. 151-159
-
-
Iyer, K.C.1
Sagheer, M.2
-
8
-
-
33749423592
-
A dynamic competition model for construction contractors
-
Kim H.J., Reinschmidt K. A dynamic competition model for construction contractors. Construction Management and Economics 2006, 24(9):955-965.
-
(2006)
Construction Management and Economics
, vol.24
, Issue.9
, pp. 955-965
-
-
Kim, H.J.1
Reinschmidt, K.2
-
9
-
-
77952582780
-
Preferred risk allocation in China's public-private partnership (PPP) projects
-
Ke, Y.J., Wang, S.Q., Chan, A.P.C., Lam, P.T.I., 2010. Preferred risk allocation in China's public-private partnership (PPP) projects. International Journal of Project Management 28 (5), 482-492.
-
(2010)
International Journal of Project Management
, vol.28
, Issue.5
, pp. 482-492
-
-
Ke, Y.J.1
Wang, S.Q.2
Chan, A.P.C.3
Lam, P.T.I.4
-
10
-
-
2142718584
-
Modelling the dynamics of design error induced rework in construction
-
Love P.E.D., Mandal P., Smith J., LI H. Modelling the dynamics of design error induced rework in construction. Construction Management and Economics 2000, 18(5):567-574.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
11
-
-
84655168221
-
Pricing model and empirical analysis of PPP projects' product or service. Master thesis, Southeast University, China
-
(In Chinese)
-
Li, J.H., 2007. Pricing model and empirical analysis of PPP projects' product or service. Master thesis, Southeast University, China (In Chinese).
-
(2007)
-
-
Li, J.H.1
-
12
-
-
37249056991
-
Automated approach to negotiations of BOT contracts with the consideration of project risk
-
Liou F.M., Huang C.P. Automated approach to negotiations of BOT contracts with the consideration of project risk. J. Constr. Eng. Manag. 2008, 134(1):18-24.
-
(2008)
J. Constr. Eng. Manag.
, vol.134
, Issue.1
, pp. 18-24
-
-
Liou, F.M.1
Huang, C.P.2
-
13
-
-
70349336494
-
System dynamic approach for simulation of experience transfer in the AEC industry
-
Lê M.A.T., Law K.H. System dynamic approach for simulation of experience transfer in the AEC industry. J. Manag. Eng. 2009, 25(4):195-203.
-
(2009)
J. Manag. Eng.
, vol.25
, Issue.4
, pp. 195-203
-
-
Lê, M.A.T.1
Law, K.H.2
-
15
-
-
34547728279
-
A fuzzy simulation model for evaluating the concession items of public-private partnership schemes
-
Ng S.T., Xie J., Skitmore M., Cheung Y.K. A fuzzy simulation model for evaluating the concession items of public-private partnership schemes. Autom. Constr. 2007, 17(1):22-29.
-
(2007)
Autom. Constr.
, vol.17
, Issue.1
, pp. 22-29
-
-
Ng, S.T.1
Xie, J.2
Skitmore, M.3
Cheung, Y.K.4
-
16
-
-
36049036883
-
A simulation model for optimizing the concession period of public-private partnerships schemes
-
Ng S.T., Xie J.Z., Cheung Y.K., Jefferies M. A simulation model for optimizing the concession period of public-private partnerships schemes. Int. J. Proj. Manag. 2007, 25(8):791-798.
-
(2007)
Int. J. Proj. Manag.
, vol.25
, Issue.8
, pp. 791-798
-
-
Ng, S.T.1
Xie, J.Z.2
Cheung, Y.K.3
Jefferies, M.4
-
18
-
-
13944250288
-
System dynamics approach to exploring performance enhancement in a construction organization
-
Ogunlana S.O., Li H., Sukhera F.A. System dynamics approach to exploring performance enhancement in a construction organization. J. Constr. Eng. Manag. 2003, 129(5):528-536.
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.5
, pp. 528-536
-
-
Ogunlana, S.O.1
Li, H.2
Sukhera, F.A.3
-
19
-
-
70350051324
-
Strategies for design-build in Korea using system dynamics modeling
-
Park M., Ji S.H., Lee H.S., Kim W. Strategies for design-build in Korea using system dynamics modeling. J. Constr. Eng. Manag. 2009, 135(11):1125-1137.
-
(2009)
J. Constr. Eng. Manag.
, vol.135
, Issue.11
, pp. 1125-1137
-
-
Park, M.1
Ji, S.H.2
Lee, H.S.3
Kim, W.4
-
20
-
-
33845772209
-
Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme
-
Subprasom K., Chen A. Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme. J. Constr. Eng. Manag. 2007, 133(1):64-71.
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, Issue.1
, pp. 64-71
-
-
Subprasom, K.1
Chen, A.2
-
21
-
-
12744271519
-
Risk concession model for build/operate/transfer contract projects
-
Shen L.Y., Wu Y.Z. Risk concession model for build/operate/transfer contract projects. J. Constr. Eng. Manag. 2005, 131(2):211-220.
-
(2005)
J. Constr. Eng. Manag.
, vol.131
, Issue.2
, pp. 211-220
-
-
Shen, L.Y.1
Wu, Y.Z.2
-
22
-
-
12144277401
-
Alternative concession model for build operate transfer contract projects
-
Shen L.Y., Li H., Li Q.M. Alternative concession model for build operate transfer contract projects. J. Constr. Eng. Manag. 2002, 128(4):326-330.
-
(2002)
J. Constr. Eng. Manag.
, vol.128
, Issue.4
, pp. 326-330
-
-
Shen, L.Y.1
Li, H.2
Li, Q.M.3
-
23
-
-
34247222582
-
Using bargaining-game theory for negotiating concession period for BOT-type contract
-
Shen L.Y., Bao H.J., Wu Y.Z., Lu W.S. Using bargaining-game theory for negotiating concession period for BOT-type contract. J. Constr. Eng. Manag. 2007, 133(5):385-392.
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, Issue.5
, pp. 385-392
-
-
Shen, L.Y.1
Bao, H.J.2
Wu, Y.Z.3
Lu, W.S.4
-
24
-
-
0038644500
-
Modelling the dynamic performance of a construction organization
-
Tang Y.H., Ogunlana S.O. Modelling the dynamic performance of a construction organization. Construction Management and Economics 2003, 21(2):127-136.
-
(2003)
Construction Management and Economics
, vol.21
, Issue.2
, pp. 127-136
-
-
Tang, Y.H.1
Ogunlana, S.O.2
-
25
-
-
2342420461
-
Risk management framework for construction projects in developing countries
-
Wang S.Q., Dulaimi M.F., Aguria M.Y. Risk management framework for construction projects in developing countries. Construction Management and Economics 2004, 22(3):237-252.
-
(2004)
Construction Management and Economics
, vol.22
, Issue.3
, pp. 237-252
-
-
Wang, S.Q.1
Dulaimi, M.F.2
Aguria, M.Y.3
-
28
-
-
0041622910
-
The effect of concession period design on completion risk management of BOT projects
-
Ye S., Tiong R.L.K. The effect of concession period design on completion risk management of BOT projects. Construction Management and Economics 2003, 21(5):471-482.
-
(2003)
Construction Management and Economics
, vol.21
, Issue.5
, pp. 471-482
-
-
Ye, S.1
Tiong, R.L.K.2
-
29
-
-
84655168222
-
The study on models of bidding decision making for BOT project and its application
-
Hunan University. PhD thesis. (In Chinese).
-
Yu Y.H., 2006. The study on models of bidding decision making for BOT project and its application. Hunan University. PhD thesis. (In Chinese).
-
(2006)
-
-
Yu, Y.H.1
-
30
-
-
78650258684
-
Win-win concession period determination methodology
-
Zhang X.Q. Win-win concession period determination methodology. J. Constr. Eng. Manag. 2009, 135(6):550-558.
-
(2009)
J. Constr. Eng. Manag.
, vol.135
, Issue.6
, pp. 550-558
-
-
Zhang, X.Q.1
-
31
-
-
44049083501
-
Assessing risk and uncertainty inherent in Chinese highway projects using AHP
-
Zayed T., Amer M., Pan J. Assessing risk and uncertainty inherent in Chinese highway projects using AHP. Int. J. Proj. Manag. 2008, 26(4):408-419.
-
(2008)
Int. J. Proj. Manag.
, vol.26
, Issue.4
, pp. 408-419
-
-
Zayed, T.1
Amer, M.2
Pan, J.3
|