메뉴 건너뛰기




Volumn 22, Issue , 2012, Pages 368-376

Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects

Author keywords

BOT projects; Concession period; Fuzzy logic; System dynamics

Indexed keywords

BOT PROJECT; CONCESSION PERIOD; DECISION VARIABLES; FUZZY LOGIC MODELING; FUZZY NUMBERS; HIGHWAY PROJECTS; INPUT VARIABLES; INTEGRATING SYSTEMS; INTERVAL ARITHMETIC; RISKS AND UNCERTAINTIES; SYSTEM DYNAMICS; SYSTEM DYNAMICS APPROACH; SYSTEM DYNAMICS MODELING; ZADEH'S EXTENSION PRINCIPLES;

EID: 84857355375     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2011.09.015     Document Type: Conference Paper
Times cited : (85)

References (23)
  • 1
    • 12744271519 scopus 로고    scopus 로고
    • Risk concession model for build operate transfer contract projects
    • L.Y. Shen, and Y.Z. Wu Risk concession model for build operate transfer contract projects Journal of Construction Engineering Management 131 2 2005 211 220
    • (2005) Journal of Construction Engineering Management , vol.131 , Issue.2 , pp. 211-220
    • Shen, L.Y.1    Wu, Y.Z.2
  • 2
    • 78650264454 scopus 로고    scopus 로고
    • Using Fuzzy-Delphi technique to determine the concession period in BOT projects
    • M. Khanzadi, F. Nasirzadeh, and M. Alipour Using Fuzzy-Delphi technique to determine the concession period in BOT projects IEEE 2010 442 446
    • (2010) IEEE , pp. 442-446
    • Khanzadi, M.1    Nasirzadeh, F.2    Alipour, M.3
  • 3
    • 37249056991 scopus 로고    scopus 로고
    • Automated approach to negotiations of BOT contracts with the consideration of project risk
    • Fen-May Liou, and Chih-Pin Huang Automated approach to negotiations of BOT contracts with the consideration of project risk Journal of Construction Engineering Management 134 1 2008 18 24
    • (2008) Journal of Construction Engineering Management , vol.134 , Issue.1 , pp. 18-24
    • Liou, F.-M.1    Huang, C.-P.2
  • 6
    • 36049036883 scopus 로고    scopus 로고
    • A simulation model for optimizing the concession period of public private partnerships schemes
    • Thomas S. Ng, J.Z. Xie, Y.K. Cheung, and M. Jefferies A simulation model for optimizing the concession period of public private partnerships schemes International Journal of Project Management 25 2007 791 798
    • (2007) International Journal of Project Management , vol.25 , pp. 791-798
    • Ng, T.S.1    Xie, J.Z.2    Cheung, Y.K.3    Jefferies, M.4
  • 7
    • 12144277401 scopus 로고    scopus 로고
    • Alternative concession model for build operate transfer contract projects
    • L.Y. Shen, H. Li, and Q.M. Li Alternative concession model for build operate transfer contract projects Journal of Construction Engineering Management 128 4 2002 326 330
    • (2002) Journal of Construction Engineering Management , vol.128 , Issue.4 , pp. 326-330
    • Shen, L.Y.1    Li, H.2    Li, Q.M.3
  • 8
    • 34547728279 scopus 로고    scopus 로고
    • A fuzzy simulation model for evaluating the concession items of public private partnership schemes
    • Thomas S. Ng, J.Z. Xie, M. Skitmore, and Y.K. Cheung A fuzzy simulation model for evaluating the concession items of public private partnership schemes Journal of Automation in Construction 17 2007 22 29
    • (2007) Journal of Automation in Construction , vol.17 , pp. 22-29
    • Ng, T.S.1    Xie, J.Z.2    Skitmore, M.3    Cheung, Y.K.4
  • 9
    • 34247222582 scopus 로고    scopus 로고
    • Using bargaining-game theory for negotiating concession period for BOT-type contract
    • L.Y. Shen, H.j. Bao, y.z. Wu, and w.s. Lu Using bargaining-game theory for negotiating concession period for BOT-type contract Journal of Construction Engineering Management 133 5 2007 385 392
    • (2007) Journal of Construction Engineering Management , vol.133 , Issue.5 , pp. 385-392
    • Shen, L.Y.1    Bao, H.J.2    Wu, Z.3    Lu, S.4
  • 18
    • 78149282590 scopus 로고    scopus 로고
    • Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction
    • H. Zhang, and F. Xing Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction Journal of Automation in Construction 19 2010 1065 1075
    • (2010) Journal of Automation in Construction , vol.19 , pp. 1065-1075
    • Zhang, H.1    Xing, F.2
  • 20
    • 0008563034 scopus 로고    scopus 로고
    • NPV at risk method in infrastructure project investment evalution
    • s. Ye, and L. Tiong NPV at risk method in infrastructure project investment evalution Journal of Construction Engineering Management 126 3 2000 227 233
    • (2000) Journal of Construction Engineering Management , vol.126 , Issue.3 , pp. 227-233
    • Ye, S.1    Tiong, L.2
  • 22
    • 16444375607 scopus 로고
    • Fuzzy weighted averages and implementation of the extension principle
    • Dong w.m., and Wong f.s. Fuzzy weighted averages and implementation of the extension principle Journal of Fuzzy Sets and System 21 1987 183 199
    • (1987) Journal of Fuzzy Sets and System , vol.21 , pp. 183-199
    • Dong, M.1    Wong, F.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.