메뉴 건너뛰기




Volumn 26, Issue 2, 2015, Pages 280-296

A case study of the successful implementation of workload control: A practitioner-led approach

Author keywords

Case study; Implementation; Make to order; Workload control

Indexed keywords

PRODUCTION CONTROL;

EID: 84923696378     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/JMTM-10-2013-0144     Document Type: Article
Times cited : (26)

References (26)
  • 2
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W. (1988), "Theory and practice of load-oriented manufacturing control", The International Journal of Production Research, Vol. 26 No. 3, pp. 375-395.
    • (1988) The International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 3
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • Bertrand, J.W.M. and van Ooijen, H.P.G. (2002), "Workload based order release and productivity: a missing link", Production Planning and Control, Vol. 13 No. 7, pp. 665-678.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 4
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigolini, R. and Portioli-Staudacher, A. (2002), "An experimental investigation on workload limiting methods with ORR policies in a job shop environment", Production Planning and Control, Vol. 13 No. 7, pp. 602-613.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 602-613
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 5
    • 79551626056 scopus 로고    scopus 로고
    • Order release in a workload controlled flow-shop with sequence-dependent set-up times
    • Fernandes, N.O. and Carmo-Silva, S. (2011), "Order release in a workload controlled flow-shop with sequence-dependent set-up times", International Journal of Production Research, Vol. 49 No. 8, pp. 2443-2454.
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2443-2454
    • Fernandes, N.O.1    Carmo-Silva, S.2
  • 6
    • 0023544082 scopus 로고
    • A procedure for implementing input/output control: A case study
    • Fry, T.D. and Smith, A.E. (1987), "A procedure for implementing input/output control: a case study", Production and Inventory Management Journal, Vol. 28 No. 4, pp. 50-52.
    • (1987) Production and Inventory Management Journal , vol.28 , Issue.4 , pp. 50-52
    • Fry, T.D.1    Smith, A.E.2
  • 7
    • 84871957648 scopus 로고    scopus 로고
    • Workload control: Successful implementation taking a contingency-based view of production planning & control
    • Hendry, L.C, Stevenson, M. and Huang, Y. (2013), "Workload control: successful implementation taking a contingency-based view of production planning & control", International Journal of Operations & Production Management, Vol. 33 No. 1, pp. 69-103.
    • (2013) International Journal of Operations & Production Management , vol.33 , Issue.1 , pp. 69-103
    • Hendry, L.C.1    Stevenson, M.2    Huang, Y.3
  • 9
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • Hendry, L.C., Land, M.J., Stevenson, M. and Gaalman, G. (2008), "Investigating implementation issues for workload control (WLC): a comparative case study analysis", International Journal of Production Economics, Vol. 112 No. 1, pp. 452-469.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.C.1    Land, M.J.2    Stevenson, M.3    Gaalman, G.4
  • 11
    • 70349649481 scopus 로고    scopus 로고
    • Production planning and control in SME's: Time for change
    • Land, M.J. and Gaalman, G.J.C. (2009), "Production planning and control in SME's: time for change", Production Planning and Control, Vol. 20 No. 7, pp. 548-558.
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 548-558
    • Land, M.J.1    Gaalman, G.J.C.2
  • 12
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale make-to-order manufacturing companies: A Korean electric motor company case
    • Park, C., Song, J., Kim, J.-G. and Kim, I. (1999), "Delivery date decision support system for the large scale make-to-order manufacturing companies: a Korean electric motor company case", Production Planning and Control, Vol. 10 No. 6, pp. 585-597.
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 585-597
    • Park, C.1    Song, J.2    Kim, J.-G.3    Kim, I.4
  • 14
    • 0242301554 scopus 로고    scopus 로고
    • Improving a practical DBR buffering approach using workload control
    • Riezebos, J., Korte, G.J. and Land, M.J. (2003), "Improving a practical DBR buffering approach using workload control", International Journal of Production Research, Vol. 41 No. 4, pp. 699-712.
    • (2003) International Journal of Production Research , vol.41 , Issue.4 , pp. 699-712
    • Riezebos, J.1    Korte, G.J.2    Land, M.J.3
  • 15
    • 0033335345 scopus 로고    scopus 로고
    • The effects of low inventory on the development of productivity norms
    • Schultz, K.L., Juran, D.C. and Boudreaux, J.W. (1999), "The effects of low inventory on the development of productivity norms", Management Science, Vol. 45 No. 12, pp. 1664-1678.
    • (1999) Management Science , vol.45 , Issue.12 , pp. 1664-1678
    • Schultz, K.L.1    Juran, D.C.2    Boudreaux, J.W.3
  • 16
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • Silva, C., Roque, L. and Almeida, A. (2006), "MAPP - a web-based decision support system for the mould industry", Decision Support Systems, Vol. 42 No. 2, pp. 999-1014.
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 17
    • 30844447199 scopus 로고    scopus 로고
    • Refining a workload control (WLC) control concept: A case study
    • Stevenson, M. (2006), "Refining a workload control (WLC) control concept: a case study", International Journal of Production Research, Vol. 44 No. 4, pp. 767-790.
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 767-790
    • Stevenson, M.1
  • 18
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidences from two case studies
    • Stevenson, M. and Silva, C. (2008), "Theoretical development of a workload control methodology: evidences from two case studies", International Journal of Production research, Vol. 46 No. 11, pp. 3107-3131.
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 19
    • 27744563510 scopus 로고    scopus 로고
    • A review of production and planning control: The applicability of key concepts to the make to order industry
    • Stevenson, M., Hendry, L.C. and Kingsman, B.G. (2005), "A review of production and planning control: the applicability of key concepts to the make to order industry", International Journal of Production Research, Vol. 43 No. 5, pp. 869-898.
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 20
    • 79954418061 scopus 로고    scopus 로고
    • The theory & practice of workload control: A research agenda & implementation strategy
    • Stevenson, M., Huang, Y., Hendry L.C. and Soepenberg, E. (2011), "The theory & practice of workload control: a research agenda & implementation strategy", International Journal of Production Economics, Vol. 131 No. 2, pp. 689-700.
    • (2011) International Journal of Production Economics , vol.131 , Issue.2 , pp. 689-700
    • Stevenson, M.1    Huang, Y.2    Hendry, L.C.3    Soepenberg, E.4
  • 21
    • 84868224912 scopus 로고    scopus 로고
    • Improving the applicability of workload control (WLC): The influence of sequence dependent set-up times on workload controlled job shops
    • Thürer, M., Silva, C., Stevenson, M. and Land, M. (2012a), "Improving the applicability of workload control (WLC): the influence of sequence dependent set-up times on workload controlled job shops", International Journal of Production Research, Vol. 50 No. 22, pp. 6419-6430.
    • (2012) International Journal of Production Research , vol.50 , Issue.22 , pp. 6419-6430
    • Thürer, M.1    Silva, C.2    Stevenson, M.3    Land, M.4
  • 22
    • 84855789582 scopus 로고    scopus 로고
    • Three decades of workload control research: A systematic review of the literature
    • Thürer, M., Stevenson, M. and Silva, C. (2011), "Three decades of workload control research: a systematic review of the literature", International Journal of Production Research, Vol. 49 No. 23, pp. 6905-6935.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 6905-6935
    • Thürer, M.1    Stevenson, M.2    Silva, C.3
  • 23
    • 84867085910 scopus 로고    scopus 로고
    • The application of workload control in assembly job-shops: An assessment by simulation
    • Thürer, M., Stevenson, M., Silva, C. and Huang, G. (2012b), "The application of workload control in assembly job-shops: an assessment by simulation", International Journal of Production Research, Vol. 50 No. 18, pp. 5048-5062.
    • (2012) International Journal of Production Research , vol.50 , Issue.18 , pp. 5048-5062
    • Thürer, M.1    Stevenson, M.2    Silva, C.3    Huang, G.4
  • 24
    • 84866400823 scopus 로고    scopus 로고
    • Workload control (WLC) and order release: A lean solution for make-to-order companies
    • Thürer, M., Stevenson, M., Silva, C., Land, M.J. and Fredendall, L.D. (2012), "Workload control (WLC) and order release: a lean solution for make-to-order companies", Production & Operations Management, Vol. 21 No. 5, pp. 939-953.
    • (2012) Production & Operations Management , vol.21 , Issue.5 , pp. 939-953
    • Thürer, M.1    Stevenson, M.2    Silva, C.3    Land, M.J.4    Fredendall, L.D.5
  • 25


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.