-
1
-
-
0033114757
-
A review of scheduling research involving setup considerations
-
Allahverdi, A., Gupta, J., and Aldowaisan, T., 1999. A review of scheduling research involving setup considerations. Omega, 27 (2), 219-239.
-
(1999)
Omega
, vol.27
, Issue.2
, pp. 219-239
-
-
Allahverdi, A.1
Gupta, J.2
Aldowaisan, T.3
-
2
-
-
36849082395
-
A survey of scheduling problems with set-up times or costs
-
Allahverdi, A., et al., 2008. A survey of scheduling problems with set-up times or costs. European Journal of Operational Research, 187 (3), 985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 985-1032
-
-
Allahverdi, A.1
-
3
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte, W., 1988. Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26 (3), 375-395.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.3
, pp. 375-395
-
-
Bechte, W.1
-
4
-
-
0031078124
-
Order review and release strategies in a job shop environment: A review and a classification
-
Bergamaschi, D., et al., 1997. Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research, 35 (2), 399-420.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 399-420
-
-
Bergamaschi, D.1
-
5
-
-
0036819876
-
The workload control concept: Theory and practical extensions of load oriented order release
-
Breithaupt, J., Land, M., and Nyhuis, P., 2002. The workload control concept: theory and practical extensions of load oriented order release. Production Planning and Control, 13 (7), 625-638.
-
(2002)
Production Planning and Control
, vol.13
, Issue.7
, pp. 625-638
-
-
Breithaupt, J.1
Land, M.2
Nyhuis, P.3
-
6
-
-
0000647451
-
A review of flowshop scheduling research with setup times
-
Cheng, T.C.E., Gupta, J.N.D., and Wang, G., 2000. A review of flowshop scheduling research with setup times. Production and Operations Management, 9 (3), 283-302.
-
(2000)
Production and Operations Management
, vol.9
, Issue.3
, pp. 283-302
-
-
Cheng, T.C.E.1
Gupta, J.N.D.2
Wang, G.3
-
7
-
-
2642522040
-
Performance analysis of make-to-order manufacturing systems under different workload control regimes
-
Haskose, A., Kingsman, B.G., and Worthington, D., 2004. Performance analysis of make-to-order manufacturing systems under different workload control regimes. International Journal of Production Economics, 90 (2), 169-186.
-
(2004)
International Journal of Production Economics
, vol.90
, Issue.2
, pp. 169-186
-
-
Haskose, A.1
Kingsman, B.G.2
Worthington, D.3
-
8
-
-
33847247900
-
Semi-interchangeable machines: Implications for workload control
-
Henrich, P., Land, M., and Gaalman, G., 2007. Semi-interchangeable machines: implications for workload control. Production Planning and Control, 18 (2), 91-104.
-
(2007)
Production Planning and Control
, vol.18
, Issue.2
, pp. 91-104
-
-
Henrich, P.1
Land, M.2
Gaalman, G.3
-
10
-
-
77952615049
-
Scheduling a dynamic flexible flow line with sequence-dependent setup times: A simulation analysis
-
DOI: 10.1080/00207540902922869. [In press]
-
Kia, H.R., Davoudpour H., and Zandieh M., 2009. Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis. International Journal of Production Research, DOI: 10.1080/00207540902922869. [In press].
-
(2009)
International Journal of Production Research
-
-
Kia, H.R.1
Davoudpour, H.2
Zandieh, M.3
-
11
-
-
0028462998
-
Impact of sequence-dependent set-up time on job shop scheduling performance
-
Kim, S.C. and Bobrowski, P.M., 1994. Impact of sequence-dependent set-up time on job shop scheduling performance. International Journal of Production Research, 32 (7), 1503-1520.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.7
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
12
-
-
0038486864
-
Comparing scheduling rules for flexible flow lines
-
Kurz, M.E. and Askin, R.G., 2003. Comparing scheduling rules for flexible flow lines. International Journal of Production Economics, 85 (3), 371-388.
-
(2003)
International Journal of Production Economics
, vol.85
, Issue.3
, pp. 371-388
-
-
Kurz, M.E.1
Askin, R.G.2
-
13
-
-
0032156960
-
The performance of workload control concepts in job shops: Improving the release method
-
Land, M. and Gaalman, G., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56-57, 347-364.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 347-364
-
-
Land, M.1
Gaalman, G.2
-
14
-
-
33748746131
-
Parameters and sensitivity in workload control
-
Land, M., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.2
, pp. 625-638
-
-
Land, M.1
-
15
-
-
0034248849
-
Scheduling flexible flow shops with sequence-dependent setup effects
-
Liu, C. and Chang, S., 2000. Scheduling flexible flow shops with sequence-dependent setup effects. IEEE Transactions on Robotics and Automation, 16 (4), 408-419.
-
(2000)
IEEE Transactions on Robotics and Automation
, vol.16
, Issue.4
, pp. 408-419
-
-
Liu, C.1
Chang, S.2
-
16
-
-
0031121479
-
Order release and sequence-dependent setup times
-
Missbauer, H., 1997. Order release and sequence-dependent setup times. International Journal of Production Economics, 49 (2), 131-143.
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.2
, pp. 131-143
-
-
Missbauer, H.1
-
17
-
-
63149103431
-
Models of the transient behaviour of production units to optimize the aggregate material flow
-
Missbauer, H., 2009. Models of the transient behaviour of production units to optimize the aggregate material flow. International Journal of Production Economics, 118 (2), 387-397.
-
(2009)
International Journal of Production Economics
, vol.118
, Issue.2
, pp. 387-397
-
-
Missbauer, H.1
-
18
-
-
0032683531
-
Scheduling flowshops with finite buffers and sequence-dependent setup times
-
Norman, B., 1999. Scheduling flowshops with finite buffers and sequence-dependent setup times. Computers and Industrial Engineering, 36 (1), 163-177.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.1
, pp. 163-177
-
-
Norman, B.1
-
19
-
-
0034295978
-
The influence of shop characteristics on workload control
-
Oosterman, B., Land, M., and Gaalman, G., 2000. The influence of shop characteristics on workload control. International Journal of Production Economics, 68 (1), 107-119.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 107-119
-
-
Oosterman, B.1
Land, M.2
Gaalman, G.3
-
20
-
-
0012239648
-
Capacity planning and control
-
Plossl, G.W. and Wight, O.W., 1973. Capacity planning and control. Production and Inventory Management, 14 (3), 31-67.
-
(1973)
Production and Inventory Management
, vol.14
, Issue.3
, pp. 31-67
-
-
Plossl, G.W.1
Wight, O.W.2
-
21
-
-
56749170897
-
An efficient new job release control methodology
-
Qi, C., Sivakumar, A.I., and Gershwin, S.B., 2009. An efficient new job release control methodology. International Journal of Production Research, 47 (3), 703-731.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.3
, pp. 703-731
-
-
Qi, C.1
Sivakumar, A.I.2
Gershwin, S.B.3
-
22
-
-
77951100029
-
Workload control release mechanisms: From practice back to theory
-
DOI: 10.1080/00207540902922810. [In press]
-
Thürer, M., Silva, C., and Stevenson, M., 2009. Workload control release mechanisms: from practice back to theory. International Journal of Production Research, DOI: 10.1080/00207540902922810. [In press].
-
(2009)
International Journal of Production Research
-
-
Thürer, M.1
Silva, C.2
Stevenson, M.3
-
23
-
-
57049118551
-
Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent set-up times
-
Vinod, V. and Sridharan, R., 2009. Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent set-up times. International Journal of Production Research, 47 (6), 1425-1447.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.6
, pp. 1425-1447
-
-
Vinod, V.1
Sridharan, R.2
-
24
-
-
33749556446
-
Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent set-ups
-
Yu, X. and Ram, B., 2006. Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent set-ups. International Journal of Production Research, 44 (22), 4793-4813.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.22
, pp. 4793-4813
-
-
Yu, X.1
Ram, B.2
|