메뉴 건너뛰기




Volumn 23, Issue 3, 2014, Pages 463-476

Lean control for make-to-order companies: Integrating customer enquiry management and order release

Author keywords

customer enquiry management; lean; make to order; order review and release; workload control

Indexed keywords


EID: 84896393664     PISSN: 10591478     EISSN: 19375956     Source Type: Journal    
DOI: 10.1111/poms.12058     Document Type: Article
Times cited : (71)

References (27)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release and sequencing interaction in job shop scheduling
    • Ahmed, I., W. W. Fisher,. 1992. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decis. Sci. 23: 633-647.
    • (1992) Decis. Sci. , vol.23 , pp. 633-647
    • Ahmed, I.1    Fisher, W.W.2
  • 2
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Prod. Plann. Control 5 (3): 292-307.
    • (1994) Prod. Plann. Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 3
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J. W. M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. J. Oper. Manag. 3 (2): 79-92.
    • (1983) J. Oper. Manag. , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 4
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job-shop performance
    • Bertrand, J. W. M., 1983b. The effect of workload dependent due-dates on job-shop performance. Manage. Sci. 29 (7): 799-816.
    • (1983) Manage. Sci. , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 6
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flow time prediction and tardiness control
    • Enns, S. T., 1995. A dynamic forecasting model for job shop flow time prediction and tardiness control. Int. J. Prod. Res. 33 (5): 1295-1312.
    • (1995) Int. J. Prod. Res. , vol.33 , Issue.5 , pp. 1295-1312
    • Enns, S.T.1
  • 8
    • 0027147723 scopus 로고
    • Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry, L. C., B. G. Kingsman,. 1993. Customer enquiry management: Part of a hierarchical system to control lead times in make-to-order companies. J. Oper. Res. Soc. 44 (1): 61-70.
    • (1993) J. Oper. Res. Soc. , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 9
    • 8844263039 scopus 로고    scopus 로고
    • Learning to evolve: A review of contemporary lean thinking
    • Hines, P., M. Holweg, N. Rich,. 2004. Learning to evolve: A review of contemporary lean thinking. Inter. J. Oper. Prod. Manag. 24 (10): 994-1011.
    • (2004) Inter. J. Oper. Prod. Manag. , vol.24 , Issue.10 , pp. 994-1011
    • Hines, P.1    Holweg, M.2    Rich, N.3
  • 10
    • 25144508112 scopus 로고    scopus 로고
    • To pull or not to pull: What is the question?
    • Hopp, W. J., M. L. Spearman,. 2004. To pull or not to pull: What is the question? Manuf. Serv. Oper. Manag. 6 (2): 133-148.
    • (2004) Manuf. Serv. Oper. Manag. , vol.6 , Issue.2 , pp. 133-148
    • Hopp, W.J.1    Spearman, M.L.2
  • 11
    • 0034295811 scopus 로고    scopus 로고
    • Modeling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B. G., 2000. Modeling input-output workload control for dynamic capacity planning in production planning systems. Int. J. Prod. Econ. 68 (1): 73-93.
    • (2000) Int. J. Prod. Econ. , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 12
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B. G., I. P. Tatsiopoulos, L. C. Hendry,. 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. Eur. J. Oper. Res. 40: 196-209.
    • (1989) Eur. J. Oper. Res. , vol.40 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 14
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M. J., G. J. C. Gaalman,. 1998. The performance of workload control concepts in job shops: Improving the release method. Int. J. Prod. Econ. 56-57: 347-364.
    • (1998) Int. J. Prod. Econ. , vol.5657 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 18
    • 0024700372 scopus 로고
    • Order review/release: Research issues and perspectives
    • Melnyk, S. A., G. L. Ragatz,. 1989. Order review/release: Research issues and perspectives. Int. J. Prod. Res. 27 (7): 1081-1096.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.A.1    Ragatz, G.L.2
  • 19
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk, S. A., G. L. Ragatz, L. D. Fredendall,. 1991. Load smoothing by the planning and order review/release systems: A simulation experiment. J. Oper. Manag. 10 (4): 512-523.
    • (1991) J. Oper. Manag. , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.A.1    Ragatz, G.L.2    Fredendall, L.D.3
  • 20
    • 0034295978 scopus 로고    scopus 로고
    • The influence of shop characteristics on workload control
    • Oosterman, B., M. J. Land, G. J. C. Gaalman,. 2000. The influence of shop characteristics on workload control. Int. J. Prod. Econ. 68 (1): 107-119.
    • (2000) Int. J. Prod. Econ. , vol.68 , Issue.1 , pp. 107-119
    • Oosterman, B.1    Land, M.J.2    Gaalman, G.J.C.3
  • 21
    • 0001870328 scopus 로고
    • A simulation analysis of due date assignment rules
    • Ragatz, G. L., V. A. Mabert,. 1984. A simulation analysis of due date assignment rules. J. Oper. Manag. 5 (1): 27-39.
    • (1984) J. Oper. Manag. , vol.5 , Issue.1 , pp. 27-39
    • Ragatz, G.L.1    Mabert, V.A.2
  • 22
    • 0033335345 scopus 로고    scopus 로고
    • The effects of low inventory on the development of productivity norms
    • Schultz, K. L., D. C. Juran, J. W. Boudreau,. 1999. The effects of low inventory on the development of productivity norms. Manage. Sci. 45 (12): 1664-1678.
    • (1999) Manage. Sci. , vol.45 , Issue.12 , pp. 1664-1678
    • Schultz, K.L.1    Juran, D.C.2    Boudreau, J.W.3
  • 23
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make to order industry
    • Stevenson, M., L. C. Hendry, B. G. Kingsman,. 2005. A review of production planning and control: The applicability of key concepts to the make to order industry. Int. J. Prod. Res. 43 (5): 869-898.
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 24
    • 84867362906 scopus 로고    scopus 로고
    • The performance of due date setting rules in assembly and multi-stage job shops: An assessment by simulation
    • Thürer, M., G. Huang, M. Stevenson, C. Silva, M. Godinho Filho,. 2012a. The performance of due date setting rules in assembly and multi-stage job shops: An assessment by simulation. Int. J. Prod. Res. 50 (20): 5949-5965.
    • (2012) Int. J. Prod. Res. , vol.50 , Issue.20 , pp. 5949-5965
    • Thürer, M.1    Huang, G.2    Stevenson, M.3    Silva, C.4    Godinho Filho, M.5
  • 25
    • 84882449229 scopus 로고    scopus 로고
    • Towards an integrated Workload Control (WLC) concept: The performance of due date setting rules in job shops with contingent orders
    • Thürer, M., M. Stevenson, C. Silva, M. J. Land,. 2013. Towards an integrated Workload Control (WLC) concept: The performance of due date setting rules in job shops with contingent orders. Int. J. Prod. Res. 51 (15): 4502-4516.
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.15 , pp. 4502-4516
    • Thürer, M.1    Stevenson, M.2    Silva, C.3    Land, M.J.4
  • 26
    • 84866400823 scopus 로고    scopus 로고
    • Workload control (WLC) and order release: A lean solution for make-to-order companies
    • Thürer, M., M. Stevenson, C. Silva, M. J. Land, L. D. Fredendall,. 2012b. Workload control (WLC) and order release: A lean solution for make-to-order companies. Prod. Oper. Manag. 21 (5): 939-953.
    • (2012) Prod. Oper. Manag. , vol.21 , Issue.5 , pp. 939-953
    • Thürer, M.1    Stevenson, M.2    Silva, C.3    Land, M.J.4    Fredendall, L.D.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.