메뉴 건너뛰기




Volumn 131, Issue 2, 2011, Pages 689-700

The theory and practice of workload control: A research agenda and implementation strategy

Author keywords

Implementation; Make To Order; Production Planning and Control; Small and Medium sized Enterprise; Workload Control

Indexed keywords

IMPLEMENTATION; MAKE-TO-ORDER; PRODUCTION PLANNING AND CONTROL; SMALL AND MEDIUM SIZED ENTERPRISE; WORKLOAD CONTROL;

EID: 79954418061     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.02.018     Document Type: Article
Times cited : (66)

References (66)
  • 1
    • 0023979312 scopus 로고
    • Theory and practise of load-oriented manufacturing control
    • W. Bechte Theory and practise of load-oriented manufacturing control International Journal of Production Research 26 3 1988 375 395 (Pubitemid 18604815)
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 2
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • W. Bechte Load-oriented manufacturing control just-in-time production for job shops Production Planning and Control 5 3 1994 292 307
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 4
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly shops
    • J.W.M. Bertrand, and A.M. van de Wakker An investigation of order release and flow time allowance policies for assembly shops Production Planning and Control 13 7 2002 639 648
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 639-648
    • Bertrand, J.W.M.1    Van De Wakker, A.M.2
  • 5
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • J.W.M. Bertrand, and H.P.G. van Ooijen Workload based order release and productivity: a missing link Production Planning and Control 13 7 2002 665 678
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 6
    • 56349122508 scopus 로고    scopus 로고
    • Optimal work order release for make-to-order job shops with customer order lead-time costs, tardiness costs and work-in-process costs
    • J.W.M. Bertrand, and H.P.G. van Ooijen Optimal work order release for make-to-order job shops with customer order lead-time costs, tardiness costs and work-in-process costs International Journal of Production Economics 116 2008 233 241
    • (2008) International Journal of Production Economics , vol.116 , pp. 233-241
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 7
    • 38249025236 scopus 로고
    • Work release strategies in a dual resource constrained job shop
    • P.M. Bobrowski, and P.S. Park Work release strategies in a dual resource constrained job shop Omega 17 2 1989 177 188
    • (1989) Omega , vol.17 , Issue.2 , pp. 177-188
    • Bobrowski, P.M.1    Park, P.S.2
  • 8
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • J.W. Breithaupt, M.J. Land, and P. Nyhuis The workload control concept: theory and practical extensions of load oriented order release Production Planning and Control 13 7 2002 625 638
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 625-638
    • Breithaupt, J.W.1    Land, M.J.2    Nyhuis, P.3
  • 9
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • R. Cigolini, and A. Portioli-Staudacher An experimental investigation on workload limiting methods with ORR policies in a job shop environment Production Planning and Control 13 7 2002 602 613
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 602-613
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 10
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • R. Cigolini, M. Perona, and A. Portioli Comparison of order review and release techniques in a dynamic and uncertain job shop environment International Journal of Production Research 36 11 1998 2931 2951 (Pubitemid 128568668)
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 11
    • 33748757057 scopus 로고    scopus 로고
    • A capacity-driven approach to establish reliable due dates in a MTO environment
    • DOI 10.1016/j.ijpe.2005.03.003, PII S092552730500068X
    • D. Corti, A. Pozzetti, and M. Zorzini A capacity-driven approach to establish reliable due dates in a MTO environment International Journal of Production Economics 104 2006 536 554 (Pubitemid 44403070)
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 536-554
    • Corti, D.1    Pozzetti, A.2    Zorzini, M.3
  • 12
    • 0010353627 scopus 로고
    • An integrated system for controlling shop loading and work flows
    • S.T. Enns An integrated system for controlling shop loading and work flows International Journal of Production Research 33 10 1995 2801 2820
    • (1995) International Journal of Production Research , vol.33 , Issue.10 , pp. 2801-2820
    • Enns, S.T.1
  • 13
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck workloads
    • S.T. Enns, and M. Prongue Costa The effectiveness of input control based on aggregate versus bottleneck workloads Production Planning and Control 13 7 2002 614 624
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Prongue Costa, M.2
  • 16
    • 0023544082 scopus 로고
    • A procedure for implementing input/output control: A case study
    • T.D. Fry, and A.E. Smith A procedure for implementing input/output control: a case study Production and Inventory Management Journal 28 4 1987 50 52
    • (1987) Production and Inventory Management Journal , vol.28 , Issue.4 , pp. 50-52
    • Fry, T.D.1    Smith, A.E.2
  • 17
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • DOI 10.1109/66.4371
    • C.R. Glassey, and M.G. Resende Closed-loop job release control for VLSI circuit manufacturing IEEE Transactions on Semiconductor Manufacturing 1 1988 36 46 (Pubitemid 18612167)
    • (1988) IEEE Trans Semicond Manuf , vol.1 , Issue.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.C.2
  • 20
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • L.C. Hendry, and S.K. Wong Alternative order release mechanisms: a comparison by simulation International Journal of Production Research 32 12 1994 2827 2842
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 21
    • 0027911614 scopus 로고
    • Production planning for an artists studio - a case study
    • DOI 10.1016/0377-2217(93)90004-7
    • L.C. Hendry, P. Elings, and D. Pegg Production planning for an artist's studio - a case study European Journal of Operational Research 64 1993 12 20 (Pubitemid 23599268)
    • (1993) European Journal of Operational Research , vol.64 , Issue.1 , pp. 12-20
    • Hendry, L.C.1    Elings, P.2    Pegg, D.3
  • 22
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • DOI 10.1016/j.ijpe.2007.05.012, PII S0925527307002319
    • L.C. Hendry, M.J. Land, M. Stevenson, and G. Gaalman Investigating implementation issues for workload control (WLC): a comparative case study analysis International Journal of Production Economics 112 2008 452 469 (Pubitemid 351179617)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.1    Land, M.2    Stevenson, M.3    Gaalman, G.4
  • 25
    • 33747110239 scopus 로고    scopus 로고
    • Grouping machines for effective workload control
    • DOI 10.1016/j.ijpe.2004.11.006, PII S0925527304004335, Strategic Issues and Innovation in Production Economics
    • P. Henrich, M.J. Land, and G. Gaalman Grouping machines for effective workload control International Journal of Production Economics 104 1 2006 125 142 (Pubitemid 44223992)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 125-142
    • Henrich, P.1    Land, M.2    Gaalman, G.3
  • 26
    • 33847247900 scopus 로고    scopus 로고
    • Semi-interchangeable machines: Implications for workload control
    • DOI 10.1080/09537280600909445, PII 771247156
    • P. Henrich, M.J. Land, and G. Gaalman Semi-interchangeable machines: implications for workload control Production Planning and Control 18 2 2007 91 104 (Pubitemid 46326996)
    • (2007) Production Planning and Control , vol.18 , Issue.2 , pp. 91-104
    • Henrich, P.1    Land, M.J.2    Gaalman, G.J.C.3
  • 27
    • 0036778742 scopus 로고    scopus 로고
    • The critical success factors for ERP implementation: An organisational fit perspective
    • K.K. Hong, and Y.G. Kim The critical success factors for ERP implementation: an organisational fit perspective Information and Management 40 2002 25 40
    • (2002) Information and Management , vol.40 , pp. 25-40
    • Hong, K.K.1    Kim, Y.G.2
  • 28
  • 30
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent set-up times
    • S.J. Kim, and P.M. Bobrowski Evaluating order release mechanisms in a job shop with sequence-dependent set-up times Production and Operations Management 4 2 1995 163 180
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.J.1    Bobrowski, P.M.2
  • 31
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • B.G. Kingsman Modelling input-output workload control for dynamic capacity planning in production planning systems International Journal of Production Economics 68 1 2000 73 93
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 32
    • 0343299650 scopus 로고    scopus 로고
    • Strike rat matrices for integrating marketing and production during the tendering process in Make-to-Order subcontractors
    • B.G. Kingsman, and A. Mercer Strike rat matrices for integrating marketing and production during the tendering process in Make-to-Order subcontractors International Transactions in Operational Research 4 1 1997 251 257
    • (1997) International Transactions in Operational Research , vol.4 , Issue.1 , pp. 251-257
    • Kingsman, B.G.1    Mercer, A.2
  • 33
    • 0030410144 scopus 로고    scopus 로고
    • Responding to customer enquiries in make-to-order companies Problems and solutions
    • DOI 10.1016/0925-5273(95)00199-9
    • B.G. Kingsman, L.C. Hendry, A. Mercer, and A. De Souza Responding to customer enquiries in make-to-order companies: problems and solutions International Journal of Production Economics 4647 1996 219 231 (Pubitemid 126366421)
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 219-231
    • Kingsman, B.1    Hendry, L.2    Mercer, A.3    De Souza, A.4
  • 34
  • 36
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • PII S0925527398000528
    • M.J. Land, and G.J.C. Gaalman The performance of workload control concepts in job shops: improving the release method International Journal of Production Economics 5657 1998 347 364 (Pubitemid 128400955)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 37
    • 70349649481 scopus 로고    scopus 로고
    • Production planning and control in SMEs: Time for change
    • M.J. Land, and G.J.C. Gaalman Production planning and control in SMEs: time for change Production Planning and Control 20 7 2009 548 558
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 548-558
    • Land, M.J.1    Gaalman, G.J.C.2
  • 42
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale make to order manufacturing companies: A Korean electric motor company case
    • C. Park, J. Song, J. Kim, and I. Kim Delivery date decision support system for the large scale make to order manufacturing companies: a Korean electric motor company case Production Planning and Control 10 6 1999 585 597
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 585-597
    • Park, C.1    Song, J.2    Kim, J.3    Kim, I.4
  • 43
    • 38249005828 scopus 로고
    • Job release and labour flexibility in a dual resource constraint job shop
    • P.S. Park, and P.M. Bobrowski Job release and labour flexibility in a dual resource constraint job shop Journal of Operations Management 8 3 1989 230 249
    • (1989) Journal of Operations Management , vol.8 , Issue.3 , pp. 230-249
    • Park, P.S.1    Bobrowski, P.M.2
  • 45
    • 0032118511 scopus 로고    scopus 로고
    • The impact of parameters setting in load oriented manufacturing control
    • PII S0925527398000500
    • M. Perona, and A. Portioli The impact of parameter setting in load oriented manufacturing control International Journal of Production Economics 55 1998 133 142 (Pubitemid 128401604)
    • (1998) International Journal of Production Economics , vol.55 , Issue.2 , pp. 133-142
    • Perona, M.1    Portioli, A.2
  • 46
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • P.R. Philipoom, M.K. Malhotra, and J.B. Jensen An evaluation of capacity sensitive order review and release procedures in job shops Decision Sciences 24 6 1993 1109 1133
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 49
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • DOI 10.1016/j.dss.2005.08.001, PII S0167923605001119
    • C. Silva, L. Roque, and A. Almeida MAPP - A web-based decision support system for the mould industry Decision Support Systems 42 2 2006 999 1014 (Pubitemid 44537479)
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 50
    • 38749134078 scopus 로고    scopus 로고
    • The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies
    • DOI 10.1016/j.ijpe.2007.06.001, PII S0925527307002344
    • G.D. Soepenberg, M. Land, and G. Gaalman The order progress diagram: a supportive tool for diagnosing delivery reliability performance in make-to-order companies International Journal of Production Economics 112 2008 495 503 (Pubitemid 351179619)
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 495-503
    • Soepenberg, G.D.1    Land, M.2    Gaalman, G.3
  • 51
    • 30844447199 scopus 로고    scopus 로고
    • Refining a Workload Control (WLC) concept: A case study
    • DOI 10.1080/00207540500338070, PII L0214177X06052
    • M. Stevenson Refining a workload control (WLC) concept: a case study International Journal of Production Research 44 4 2006 767 790 (Pubitemid 43102617)
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 767-790
    • Stevenson, M.1
  • 52
    • 33847258721 scopus 로고    scopus 로고
    • Improving supply chain integration using a workload control concept and web-functionality
    • DOI 10.1080/09537280600965785, PII 771246854
    • M. Stevenson, and L.C. Hendry Improving supply chain integration using a workload control concept and web-functionality Production Planning and Control 18 2 2007 142 155 (Pubitemid 46327000)
    • (2007) Production Planning and Control , vol.18 , Issue.2 , pp. 142-155
    • Stevenson, M.1    Hendry, L.C.2
  • 53
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidence from two case studies
    • DOI 10.1080/00207540601039791, PII 771200955
    • M. Stevenson, and C. Silva Theoretical development of a workload control methodology: evidence from two case studies International Journal of Production Research 46 11 2008 3107 3131 (Pubitemid 351499535)
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 54
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • DOI 10.1080/0020754042000298520
    • M. Stevenson, L.C. Hendry, and B.G. Kingsman A review of production planning and control: the applicability of key concepts to the make to order industry International Journal of Production Research 43 5 2005 869 898 (Pubitemid 41633078)
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 55
    • 70349636294 scopus 로고    scopus 로고
    • The development and application of an interactive end-user training tool: Part of an implementation strategy for workload control
    • M. Stevenson, Y. Huang, and L.C. Hendry The development and application of an interactive end-user training tool: part of an implementation strategy for workload control Production Planning and Control 20 7 2009 622 635
    • (2009) Production Planning and Control , vol.20 , Issue.7 , pp. 622-635
    • Stevenson, M.1    Huang, Y.2    Hendry, L.C.3
  • 56
    • 0034340029 scopus 로고    scopus 로고
    • Risk factors in enterprise-wide/ERP projects
    • M. Sumner Risk factors in enterprise-wide/ERP projects Journal of Information Technology 15 2000 317 327
    • (2000) Journal of Information Technology , vol.15 , pp. 317-327
    • Sumner, M.1
  • 58
    • 77951100029 scopus 로고    scopus 로고
    • Workload control release mechanisms: From practice back to theory building
    • M. Thürer, C. Silva, and M. Stevenson Workload control release mechanisms: from practice back to theory building International Journal of Production Research 48 12 2010 3593 3617
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3593-3617
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 59
    • 78650192487 scopus 로고    scopus 로고
    • Optimising workload norms: The influence of shop floor characteristics on setting workload norms for the workload control concept
    • M. Thürer, C. Silva, and M. Stevenson Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept International Journal of Production Research 49 4 2011 1151 1171
    • (2011) International Journal of Production Research , vol.49 , Issue.4 , pp. 1151-1171
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 62
    • 39449089365 scopus 로고    scopus 로고
    • Multi-agent-based workload control for make-to-order manufacturing
    • DOI 10.1080/00207540600969758, PII 790718858
    • M.X. Weng, Z. Wu, G. Qi, and L. Zheng Multi-agent-based workload control for make-to-order manufacturing International Journal of Production Research 46 8 2008 2197 2213 (Pubitemid 351272737)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2197-2213
    • Weng, M.X.1    Wu, Z.2    Qi, G.3    Zheng, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.