메뉴 건너뛰기




Volumn 50, Issue 22, 2012, Pages 6419-6430

Improving the applicability of workload control (WLC): The influence of sequence-dependent set-up times on workload controlled job shops

Author keywords

Job shop control; Order release mechanism; Priority dispatching; Sequence dependent set up times; Workload control

Indexed keywords

JOB SHOP; PRIORITY DISPATCHING; RELEASE MECHANISM; SET-UP TIME; WORKLOAD CONTROL;

EID: 84868224912     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.648275     Document Type: Article
Times cited : (26)

References (39)
  • 2
    • 0033114757 scopus 로고    scopus 로고
    • A review of scheduling research involving setup considerations
    • Allahverdi, A., Gupta, J.N.D., and Aldowaisan, T., 1999. A review of scheduling research involving setup considerations. OMEGA, 27 (2), 219-239.
    • (1999) OMEGA , vol.27 , Issue.2 , pp. 219-239
    • Allahverdi, A.1    Gupta, J.N.D.2    Aldowaisan, T.3
  • 3
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988. Theory and practise of load-oriented manufacturing control. International Journal of Production Research, 26 (3), 375-395. (Pubitemid 18604815)
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte Wolfgang1
  • 4
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning and Control, 5 (3), 292-307.
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 7
    • 0035565786 scopus 로고    scopus 로고
    • Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times
    • DOI 10.1023/A:1014990729837
    • Cheung, W. and Zhou, H., 2001. Using genetic algorithms and heuristics for job shop scheduling with sequence-dependent setup times. Annals of Operations Research, 107 (1-4), 65-81. (Pubitemid 33634450)
    • (2001) Annals of Operations Research , vol.107 , Issue.1-4 , pp. 65-81
    • Cheung, W.1    Zhou, H.2
  • 8
    • 0036533228 scopus 로고    scopus 로고
    • A local search algorithm for job shop scheduling problems with alternative operations and sequence-dependent setups
    • Choi, I.C. and Choi, D.S., 2002. A local search algorithm for job shop scheduling problems with alternative operations and sequence-dependent setups. Computers and Industrial Engineering, 42 (1), 43-58.
    • (2002) Computers and Industrial Engineering , vol.42 , Issue.1 , pp. 43-58
    • Choi, I.C.1    Choi, D.S.2
  • 9
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M., and Portioli, A., 1998. Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36 (11), 2931-2951. (Pubitemid 128568668)
    • (1998) International Journal of Production Research , vol.36 , Issue.11 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 11
    • 79551626056 scopus 로고    scopus 로고
    • Order release in a workload controlled flow-shop with sequence-dependent set-up times
    • Fernandes, N.O. and Carmo-Silva, S., 2011. Order release in a workload controlled flow-shop with sequence-dependent set-up times. International Journal of Production Research, 49 (8), 2443-2454.
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2443-2454
    • Fernandes, N.O.1    Carmo-Silva, S.2
  • 12
    • 38249034192 scopus 로고
    • Repetitive lots: The use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops
    • Flynn, B.B., 1987. Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops. Journal of Operations Management, 7 (1-2), 203-216.
    • (1987) Journal of Operations Management , vol.7 , Issue.1-2 , pp. 203-216
    • Flynn, B.B.1
  • 14
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • Hendry, L.C., et al., 2008. Investigating implementation issues for workload control (WLC): a comparative case study analysis. International Journal of Production Economics, 112 (1), 452-469.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.C.1
  • 15
    • 33747110239 scopus 로고    scopus 로고
    • Grouping machines for effective workload control
    • DOI 10.1016/j.ijpe.2004.11.006, PII S0925527304004335, Strategic Issues and Innovation in Production Economics
    • Henrich, P., Land, M.J., and Gaalman, G., 2006. Grouping machines for effective workload control. International Journal of Production Economics, 104 (1), 125-142. (Pubitemid 44223992)
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 125-142
    • Henrich, P.1    Land, M.2    Gaalman, G.3
  • 16
    • 0031206538 scopus 로고    scopus 로고
    • Scheduling jobs with uncertain setup times and sequence dependency
    • PII S0305048397000133
    • Kim, S.C. and Bobrowski, P.M., 1997. Scheduling jobs with uncertain setup times and sequence dependency. Omega, 25 (4), 437-447. (Pubitemid 127166740)
    • (1997) Omega , vol.25 , Issue.4 , pp. 437-447
    • Kim, S.C.1    Bobrowski, P.M.2
  • 17
    • 0028462998 scopus 로고
    • Impact of sequence dependent set-up times on job shop scheduling performance
    • Kim, S.J. and Bobrowski, P.M., 1994. Impact of sequence dependent set-up times on job shop scheduling performance. International Journal of Production Research, 32 (7), 1503-1520.
    • (1994) International Journal of Production Research , vol.32 , Issue.7 , pp. 1503-1520
    • Kim, S.J.1    Bobrowski, P.M.2
  • 18
    • 84986946649 scopus 로고
    • Evaluating order release mechanisms in a job shop with sequence-dependent set-up times
    • Kim, S.J. and Bobrowski, P.M., 1995. Evaluating order release mechanisms in a job shop with sequence-dependent set-up times. Production and Operations Management, 4 (2), 163-180.
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 163-180
    • Kim, S.J.1    Bobrowski, P.M.2
  • 19
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68 (1), 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 20
    • 33748746131 scopus 로고    scopus 로고
    • Parameters and sensitivity in workload control
    • Land, M.J., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 625-638
    • Land, M.J.1
  • 22
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops: A critical assessment
    • Land, M.J. and Gaalman, G., 1996b. Workload control concepts in job shops: a critical assessment. International Journal of Production Economics, 46-47, 535-538.
    • (1996) International Journal of Production Economics , vol.46-47 , pp. 535-538
    • Land, M.J.1    Gaalman, G.2
  • 23
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • PII S0925527398000528
    • Land, M.J. and Gaalman, G., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56-57, 347-364. (Pubitemid 128400955)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 25
    • 0031121479 scopus 로고    scopus 로고
    • Order release and sequence-dependent setup times
    • PII S092552739700008X
    • Missbauer, H., 1997. Order release and sequence-dependent set-up times. International Journal of Production Economics, 49 (2), 131-143. (Pubitemid 127382398)
    • (1997) International Journal of Production Economics , vol.49 , Issue.2 , pp. 131-143
    • Missbauer, H.1
  • 26
    • 0036820605 scopus 로고    scopus 로고
    • Lot sizing in workload control systems
    • Missbauer, H., 2002. Lot sizing in workload control systems. Production Planning and Control, 13 (7), 649-664.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 649-664
    • Missbauer, H.1
  • 28
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P.R., Malhotra, M.K., and Jensen, J.B., 1993. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences, 24 (6), 1109-1133.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 30
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • DOI 10.1016/j.dss.2005.08.001, PII S0167923605001119
    • Silva, C., Roque, L., and Almeida, A., 2006. MAPP - A web-based decision support system for the mould industry. Decision Support Systems, 42 (2), 999-1014. (Pubitemid 44537479)
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 31
    • 30844447199 scopus 로고    scopus 로고
    • Refining a Workload Control (WLC) concept: A case study
    • DOI 10.1080/00207540500338070, PII L0214177X06052
    • Stevenson, M., 2006. Refining a workload control (WLC) concept: a case study. International Journal of Production Research, 44 (4), 767-790. (Pubitemid 43102617)
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 767-790
    • Stevenson, M.1
  • 32
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidence from two case studies
    • DOI 10.1080/00207540601039791, PII 771200955
    • Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131. (Pubitemid 351499535)
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 33
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • DOI 10.1080/0020754042000298520
    • Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: the applicability of key concepts to the make to order industry. International Journal of Production Research, 43 (5), 869-898. (Pubitemid 41633078)
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 35
    • 77951100029 scopus 로고    scopus 로고
    • Workload control release mechanisms: From practice back to theory building
    • Thürer, M., Silva, C., and Stevenson, M., 2010. Workload control release mechanisms: from practice back to theory building. International Journal of Production Research, 48 (12), 3593-3613.
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3593-3613
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 36
    • 78650192487 scopus 로고    scopus 로고
    • Optimizing workload norms: The influence of shop floor characteristics on setting workload norms for the workload control concept
    • Thürer, M., Silva, C., and Stevenson, M., 2011. Optimizing workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. International Journal of Production Research, 49 (4), 1151-1171.
    • (2011) International Journal of Production Research , vol.49 , Issue.4 , pp. 1151-1171
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 38
    • 0345403299 scopus 로고
    • The influence of setup time on job shop performance
    • Wilbrecht, J.K. and Prescott, W.B., 1969. The influence of setup time on job shop performance. Management Science, 18 (4), 274-280.
    • (1969) Management Science , vol.18 , Issue.4 , pp. 274-280
    • Wilbrecht, J.K.1    Prescott, W.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.