-
1
-
-
0023418695
-
Priority assignment procedures in multi-level assembly job shops
-
Adam, N.R., Bertrand, J.W.M., and Surkis, J., 1987. Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 19 (3), 317-328.
-
(1987)
IIE Transactions
, vol.19
, Issue.3
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
2
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
-
Adam, N.R., et al., 1993. Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68 (1), 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, Issue.1
, pp. 212-227
-
-
Adam, N.R.1
-
3
-
-
0002479150
-
Load-oriented manufacturing control just-in-time production for job shops
-
Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning and Control, 5 (3), 292-307.
-
(1994)
Production Planning and Control
, vol.5
, Issue.3
, pp. 292-307
-
-
Bechte, W.1
-
4
-
-
0031078124
-
Order review and release strategies in a job shop environment: A review and a classification
-
Bergamaschi, D., et al., 1997. Order review and release strategies in a job shop environment: A review and a classification. International Journal of Production Research, 35 (2), 399-420.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 399-420
-
-
Bergamaschi, D.1
-
5
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J.W.M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3 (2), 79-92.
-
(1983)
Journal of Operations Management
, vol.3
, Issue.2
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
6
-
-
0020783525
-
The effect of workload dependent due-dates on job-shop performance
-
Bertrand, J.W.M., 1983b. The effect of workload dependent due-dates on job-shop performance. Management Science, 29 (7), 799-816.
-
(1983)
Management Science
, vol.29
, Issue.7
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
7
-
-
0036819519
-
An investigation of order release and flow time allowance policies for assembly shops
-
Bertrand, J.W.M. and Van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly shops. Production Planning and Control, 13 (7), 639-648.
-
(2002)
Production Planning and Control
, vol.13
, Issue.7
, pp. 639-648
-
-
Bertrand, J.W.M.1
Van De Wakker, A.M.2
-
8
-
-
70249135320
-
Concerning the theory of workload control
-
Fredendall, L.D., Ojha, D., and Patterson, J.W., 2010. Concerning the theory of workload control. European Journal of Operational Research, 201 (1), 99-111.
-
(2010)
European Journal of Operational Research
, vol.201
, Issue.1
, pp. 99-111
-
-
Fredendall, L.D.1
Ojha, D.2
Patterson, J.W.3
-
10
-
-
0027147723
-
Customer Enquiry Management: Part of a hierarchical system to control lead times in make-to-order companies
-
Hendry, L.C. and Kingsman, B.G., 1993. Customer Enquiry Management: Part of a hierarchical system to control lead times in make-to-order companies. Journal of the Operational Research Society, 44 (1), 61-70.
-
(1993)
Journal of the Operational Research Society
, vol.44
, Issue.1
, pp. 61-70
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
11
-
-
38749152402
-
Investigating implementation issues for workload control (WLC): A comparative case study analysis
-
Hendry, L.C., et al., 2008. Investigating implementation issues for workload control (WLC): A comparative case study analysis. International Journal of Production Economics, 112, 452-469.
-
(2008)
International Journal of Production Economics
, vol.112
, pp. 452-469
-
-
Hendry, L.C.1
-
12
-
-
0034295811
-
Modelling input-output workload control for dynamic capacity planning in production planning systems
-
Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68 (1), 73-93.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 73-93
-
-
Kingsman, B.G.1
-
13
-
-
0024664777
-
A structural methodology for managing manufacturing lead times in make-to-order companies
-
Kingsman, B.G., Tatsiopoulos, I.P., and an Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40, 196-209.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
14
-
-
33748746131
-
Parameters and sensitivity in workload control
-
Land, M.J., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.2
, pp. 625-638
-
-
Land, M.J.1
-
16
-
-
0012239473
-
Towards simple and robust workload norms
-
9-11 September, Mons, Belgium
-
Land, M.J. and Gaalman, G., 1996b. Towards simple and robust workload norms. Proceedings of the workshop on production planning and control, 9-11 September, Mons, Belgium, 66-96.
-
(1996)
Proceedings of the Workshop on Production Planning and Control
, pp. 66-96
-
-
Land, M.J.1
Gaalman, G.2
-
17
-
-
0032156960
-
The performance of workload control concepts in job shops: Improving the release method
-
Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics, 56-57, 347-364.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 347-364
-
-
Land, M.J.1
Gaalman, G.J.C.2
-
18
-
-
78649822911
-
Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
-
Lu, H.L, Huang, G.Q., and Yang, H.D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49 (3), 647-669.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.3
, pp. 647-669
-
-
Lu, H.L.1
Huang, G.Q.2
Yang, H.D.3
-
19
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
20
-
-
0024700372
-
Order review/release: Research issues and perspectives
-
Melnyk, S.A. and Ragatz, G.L., 1989. Order review/release: research issues and perspectives. International Journal of Production Research, 27 (7), 1081-1096.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.7
, pp. 1081-1096
-
-
Melnyk, S.A.1
Ragatz, G.L.2
-
21
-
-
0034295978
-
The influence of shop characteristics on workload control
-
Oosterman, B., Land, M.J., and Gaalman, G., 2000. The influence of shop characteristics on workload control. International Journal of Production Economics, 68 (1), 107-119.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 107-119
-
-
Oosterman, B.1
Land, M.J.2
Gaalman, G.3
-
22
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoom, P., Russell, R., and Fry, T., 1991. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29 (4), 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoom, P.1
Russell, R.2
Fry, T.3
-
23
-
-
0011727186
-
Priority dispatching rules in job shops with assembly operations and random delays
-
Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8 (2), 227-234.
-
(1980)
Omega
, vol.8
, Issue.2
, pp. 227-234
-
-
Sculli, D.1
-
24
-
-
33749578069
-
MAPP - A web-based decision support system for the mould industry
-
Silva, C., Roque, L., and Almeida, A., 2006. MAPP - A web-based decision support system for the mould industry. Decision Support Systems, 42 (2), 999-1014.
-
(2006)
Decision Support Systems
, vol.42
, Issue.2
, pp. 999-1014
-
-
Silva, C.1
Roque, L.2
Almeida, A.3
-
25
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33 (9), 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
26
-
-
41849149287
-
Theoretical development of a workload control methodology: Evidence from two case studies
-
Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: Evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.11
, pp. 3107-3131
-
-
Stevenson, M.1
Silva, C.2
-
27
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts to the make to order industry
-
Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: The applicability of key concepts to the make to order industry. International Journal of Production Research, 43 (5), 869-898.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.5
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
28
-
-
79954418061
-
The theory and practice of workload control: A research agenda and implementation strategy
-
Stevenson, M., et al., 2011. The theory and practice of workload control: A research agenda and implementation strategy. International Journal of Production Economics, 131 (2), 689-700.
-
(2011)
International Journal of Production Economics
, vol.131
, Issue.2
, pp. 689-700
-
-
Stevenson, M.1
-
30
-
-
77951100029
-
Workload control release mechanisms: From practice back to theory building
-
Thürer, M., Silva, C., and Stevenson, M., 2010. Workload control release mechanisms: From practice back to theory building. International Journal of Production Research, 48 (12), 3593-3613.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.12
, pp. 3593-3613
-
-
Thürer, M.1
Silva, C.2
Stevenson, M.3
-
31
-
-
84855789582
-
Three decades of workload control research: A systematic review of the literature
-
Thürer, M., Stevenson, M., and Silva, C., 2011. Three decades of workload control research: A systematic review of the literature. International Journal of Production Research, 49 (23), 6905-6935.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.23
, pp. 6905-6935
-
-
Thürer, M.1
Stevenson, M.2
Silva, C.3
|