메뉴 건너뛰기




Volumn 50, Issue 18, 2012, Pages 5048-5062

The application of workload control in assembly job shops: An assessment by simulation

Author keywords

Assembly job shop; Customer enquiry management; Job shop control; Order release method; Workload control

Indexed keywords

ASSEMBLY JOB SHOP; CUSTOMER ENQUIRIES; JOB SHOP; RELEASE METHODS; WORKLOAD CONTROL;

EID: 84867085910     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.631600     Document Type: Article
Times cited : (22)

References (32)
  • 1
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly job shops
    • Adam, N.R., Bertrand, J.W.M., and Surkis, J., 1987. Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 19 (3), 317-328.
    • (1987) IIE Transactions , vol.19 , Issue.3 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.W.M.2    Surkis, J.3
  • 2
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
    • Adam, N.R., et al., 1993. Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68 (1), 212-227.
    • (1993) European Journal of Operational Research , vol.68 , Issue.1 , pp. 212-227
    • Adam, N.R.1
  • 3
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning and Control, 5 (3), 292-307.
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 4
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • Bergamaschi, D., et al., 1997. Order review and release strategies in a job shop environment: A review and a classification. International Journal of Production Research, 35 (2), 399-420.
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.1
  • 5
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3 (2), 79-92.
    • (1983) Journal of Operations Management , vol.3 , Issue.2 , pp. 79-92
    • Bertrand, J.W.M.1
  • 6
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job-shop performance
    • Bertrand, J.W.M., 1983b. The effect of workload dependent due-dates on job-shop performance. Management Science, 29 (7), 799-816.
    • (1983) Management Science , vol.29 , Issue.7 , pp. 799-816
    • Bertrand, J.W.M.1
  • 7
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly shops
    • Bertrand, J.W.M. and Van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly shops. Production Planning and Control, 13 (7), 639-648.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 639-648
    • Bertrand, J.W.M.1    Van De Wakker, A.M.2
  • 10
    • 0027147723 scopus 로고
    • Customer Enquiry Management: Part of a hierarchical system to control lead times in make-to-order companies
    • Hendry, L.C. and Kingsman, B.G., 1993. Customer Enquiry Management: Part of a hierarchical system to control lead times in make-to-order companies. Journal of the Operational Research Society, 44 (1), 61-70.
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.1 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 11
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • Hendry, L.C., et al., 2008. Investigating implementation issues for workload control (WLC): A comparative case study analysis. International Journal of Production Economics, 112, 452-469.
    • (2008) International Journal of Production Economics , vol.112 , pp. 452-469
    • Hendry, L.C.1
  • 12
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68 (1), 73-93.
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 13
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B.G., Tatsiopoulos, I.P., and an Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40, 196-209.
    • (1989) European Journal of Operational Research , vol.40 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 14
    • 33748746131 scopus 로고    scopus 로고
    • Parameters and sensitivity in workload control
    • Land, M.J., 2006. Parameters and sensitivity in workload control. International Journal of Production Economics, 104 (2), 625-638.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 625-638
    • Land, M.J.1
  • 17
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics, 56-57, 347-364.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 18
    • 78649822911 scopus 로고    scopus 로고
    • Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
    • Lu, H.L, Huang, G.Q., and Yang, H.D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49 (3), 647-669.
    • (2011) International Journal of Production Research , vol.49 , Issue.3 , pp. 647-669
    • Lu, H.L.1    Huang, G.Q.2    Yang, H.D.3
  • 19
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 22
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoom, P., Russell, R., and Fry, T., 1991. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29 (4), 739-753.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 739-753
    • Philipoom, P.1    Russell, R.2    Fry, T.3
  • 23
    • 0011727186 scopus 로고
    • Priority dispatching rules in job shops with assembly operations and random delays
    • Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8 (2), 227-234.
    • (1980) Omega , vol.8 , Issue.2 , pp. 227-234
    • Sculli, D.1
  • 24
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • Silva, C., Roque, L., and Almeida, A., 2006. MAPP - A web-based decision support system for the mould industry. Decision Support Systems, 42 (2), 999-1014.
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 25
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33 (9), 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 26
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidence from two case studies
    • Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: Evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131.
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 27
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make to order industry
    • Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: The applicability of key concepts to the make to order industry. International Journal of Production Research, 43 (5), 869-898.
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 28
    • 79954418061 scopus 로고    scopus 로고
    • The theory and practice of workload control: A research agenda and implementation strategy
    • Stevenson, M., et al., 2011. The theory and practice of workload control: A research agenda and implementation strategy. International Journal of Production Economics, 131 (2), 689-700.
    • (2011) International Journal of Production Economics , vol.131 , Issue.2 , pp. 689-700
    • Stevenson, M.1
  • 30
    • 77951100029 scopus 로고    scopus 로고
    • Workload control release mechanisms: From practice back to theory building
    • Thürer, M., Silva, C., and Stevenson, M., 2010. Workload control release mechanisms: From practice back to theory building. International Journal of Production Research, 48 (12), 3593-3613.
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3593-3613
    • Thürer, M.1    Silva, C.2    Stevenson, M.3
  • 31
    • 84855789582 scopus 로고    scopus 로고
    • Three decades of workload control research: A systematic review of the literature
    • Thürer, M., Stevenson, M., and Silva, C., 2011. Three decades of workload control research: A systematic review of the literature. International Journal of Production Research, 49 (23), 6905-6935.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 6905-6935
    • Thürer, M.1    Stevenson, M.2    Silva, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.