-
1
-
-
0027664114
-
Prebid and preconstruction planning process
-
A. Laufer, A. Shapira, D. Cohenca, and G. Howell Prebid and preconstruction planning process J. Constr. Eng. Manag. ASCE 119 3 1993 426 444
-
(1993)
J. Constr. Eng. Manag. ASCE
, vol.119
, Issue.3
, pp. 426-444
-
-
Laufer, A.1
Shapira, A.2
Cohenca, D.3
Howell, G.4
-
2
-
-
0004011301
-
-
(Ph.D. Dissertation) Faculty of Eng., School of Civil Eng. The University of Birmingham, UK (192 pp.)
-
G. Ballard The last planner system of production control (Ph.D. Dissertation) 2000 Faculty of Eng., School of Civil Eng. The University of Birmingham, UK (192 pp.)
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.1
-
4
-
-
84856653029
-
-
Luis Alarcon, Annual Conference of the International Group for Lean Construction, Gold Coast, Australia
-
G. Ballard Luis Alarcon, Lookahead planning: the missing link in production control Annual Conference of the International Group for Lean Construction, Gold Coast, Australia 5 1997 13 26
-
(1997)
Lookahead Planning: The Missing Link in Production Control
, vol.5
, pp. 13-26
-
-
Ballard, G.1
-
5
-
-
84922578347
-
-
Julio Martinez, Annual Conference of the International Group for Lean Construction, Blacksburg, Virginia, USA (13 pp.)
-
G. Ballard, and G. Howell Julio Martinez, An update on last planner Annual Conference of the International Group for Lean Construction, Blacksburg, Virginia, USA 11 2003 (13 pp.)
-
(2003)
An Update on Last Planner
, vol.11
-
-
Ballard, G.1
Howell, G.2
-
6
-
-
85026658491
-
Rethinking lookahead planning to optimize construction workflow
-
F.R. Hamzeh, G. Ballard, and I.D. Tommelein Rethinking lookahead planning to optimize construction workflow Lean Constr. J. 2012 15 34
-
(2012)
Lean Constr. J.
, pp. 15-34
-
-
Hamzeh, F.R.1
Ballard, G.2
Tommelein, I.D.3
-
7
-
-
84922559585
-
-
Carlos Formoso, Patricia Tzortzopoulos, Annual Conference of the International Group for Lean Construction, Fortaleza, Brazil
-
D. Fauchier, and T. Alves Carlos Formoso, Patricia Tzortzopoulos, Last planner system is the gateway to lean behaviors Annual Conference of the International Group for Lean Construction, Fortaleza, Brazil 21 2013 559 568
-
(2013)
Last Planner System is the Gateway to Lean Behaviors
, vol.21
, pp. 559-568
-
-
Fauchier, D.1
Alves, T.2
-
8
-
-
2342418968
-
Implementing lean construction: Stabilizing work flow
-
L.F. Alarcon, A.A. Balkema The Netherlands
-
G. Ballard, and G. Howell Implementing lean construction: stabilizing work flow L.F. Alarcon, Lean Construction 1994 A.A. Balkema The Netherlands 101 110
-
(1994)
Lean Construction
, pp. 101-110
-
-
Ballard, G.1
Howell, G.2
-
9
-
-
11644288742
-
Shielding production: An essential step in production control
-
G. Ballard, and G. Howell Shielding production: an essential step in production control J. Constr. Eng. Manag. ASCE 124 1 1998 11 17
-
(1998)
J. Constr. Eng. Manag. ASCE
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
10
-
-
77956803468
-
-
Christine Pasquire, Patricia Tzortzopoulos, Annual Conference of the International Group for Lean Construction, Michigan, USA
-
J.W. Jang, and Y.W. Kim Christine Pasquire, Patricia Tzortzopoulos, Use of percent constraint removal to measure the make ready process Annual Conference of the International Group for Lean Construction, Michigan, USA 15 2007 529 538
-
(2007)
Use of Percent Constraint Removal to Measure the Make Ready Process
, vol.15
, pp. 529-538
-
-
Jang, J.W.1
Kim, Y.W.2
-
11
-
-
45849086928
-
Investigating the relationship between planning reliability and project performance: A case study, production planning and control
-
Taylor And Francis Group
-
V. González, F. Alarcón, and F. Mundaca Investigating the relationship between planning reliability and project performance: a case study, production planning and control The Management of Operations 19 (5) 2008 Taylor And Francis Group 461 474
-
(2008)
The Management of Operations
, vol.195
, pp. 461-474
-
-
González, V.1
Alarcón, F.2
Mundaca, F.3
-
12
-
-
81855224797
-
Work flow variation and labor productivity: Case study
-
M. Liu, G. Ballard, and W. Ibbs Work flow variation and labor productivity: case study J. Constr. Eng. Manag. ASCE 27 4 2011 236 242
-
(2011)
J. Constr. Eng. Manag. ASCE
, vol.27
, Issue.4
, pp. 236-242
-
-
Liu, M.1
Ballard, G.2
Ibbs, W.3
-
13
-
-
0013362276
-
Simulation research methods
-
Joel Baum, Blackwell London
-
K. Dooley Simulation research methods Joel Baum, Companion to Organizations 2002 Blackwell London 829 848
-
(2002)
Companion to Organizations
, pp. 829-848
-
-
Dooley, K.1
-
17
-
-
0032677122
-
General-purpose systems for effective construction simulation
-
J.C. Martinez, and P.G. Ioannou General-purpose systems for effective construction simulation J. Constr. Eng. Manag. ASCE 125 4 1999 265 276
-
(1999)
J. Constr. Eng. Manag. ASCE
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
18
-
-
77956838319
-
Role of simulation in construction engineering and management
-
S. AbouRizk Role of simulation in construction engineering and management J. Constr. Eng. Manag. ASCE 136 2010 1140 1153
-
(2010)
J. Constr. Eng. Manag. ASCE
, vol.136
, pp. 1140-1153
-
-
Abourizk, S.1
-
19
-
-
0027610292
-
Simulation technologies for planning heavy construction processes
-
J.A. Vanegas, E.B. Bravo, and D.W. Halpin Simulation technologies for planning heavy construction processes J. Constr. Eng. Manag. ASCE 119 2 1993 336 354
-
(1993)
J. Constr. Eng. Manag. ASCE
, vol.119
, Issue.2
, pp. 336-354
-
-
Vanegas, J.A.1
Bravo, E.B.2
Halpin, D.W.3
-
20
-
-
4344700333
-
Planning gang formwork operations for building construction using simulations
-
R.Y. Huang, J.-J. Chen, and K.S. Sun Planning gang formwork operations for building construction using simulations Autom. Constr. 13-6 2004 765 779
-
(2004)
Autom. Constr.
, vol.13
, Issue.6
, pp. 765-779
-
-
Huang, R.Y.1
Chen, J.-J.2
Sun, K.S.3
-
21
-
-
84884503520
-
An optimal algorithm of the multi-lifting operating simulation for super-tall building construction
-
C.Y. Cho, Y. Lee, M.Y. Cho, S. Kwon, Y. Shin, and J. Lee An optimal algorithm of the multi-lifting operating simulation for super-tall building construction Autom. Constr. 35 2013 595 607
-
(2013)
Autom. Constr.
, vol.35
, pp. 595-607
-
-
Cho, C.Y.1
Lee, Y.2
Cho, M.Y.3
Kwon, S.4
Shin, Y.5
Lee, J.6
-
22
-
-
79952454313
-
-
Christine Pasquire, Patricia Tzortzopoulos, Annual Conference of the International Group for Lean Construction, East Lansing, Michigan, USA
-
F.R. Hamzeh, I.D. Tommelein, G. Ballard, and P. Kaminsky Christine Pasquire, Patricia Tzortzopoulos, Logistics centers to support project-based production in the construction industry Annual Conference of the International Group for Lean Construction, East Lansing, Michigan, USA 15 2007 181 191
-
(2007)
Logistics Centers to Support Project-based Production in the Construction Industry
, vol.15
, pp. 181-191
-
-
Hamzeh, F.R.1
Tommelein, I.D.2
Ballard, G.3
Kaminsky, P.4
-
23
-
-
41249086680
-
Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis
-
T. Cho, and T.S. Kim Probabilistic risk assessment for the construction phases of a bridge construction based on finite element analysis Finite Elem. Anal. Des. 44 2008 383 400
-
(2008)
Finite Elem. Anal. Des.
, vol.44
, pp. 383-400
-
-
Cho, T.1
Kim, T.S.2
-
24
-
-
84872257736
-
Development of a 4D object-based system for visualizing the risk information of construction projects
-
L.S. Kang, S.K. Kim, H.S. Moon, and H.S. Kim Development of a 4D object-based system for visualizing the risk information of construction projects Autom. Constr. 31 2013 186 203
-
(2013)
Autom. Constr.
, vol.31
, pp. 186-203
-
-
Kang, L.S.1
Kim, S.K.2
Moon, H.S.3
Kim, H.S.4
-
25
-
-
0023440167
-
Expert system for construction planning
-
C. Hendrickson, C. Zozaya-Gorostiza, D. Rehak, E. Baracco-Miller, and P. Lim Expert system for construction planning J. Comput. Civ. Eng. ASCE 1 4 1987 253 269
-
(1987)
J. Comput. Civ. Eng. ASCE
, vol.1
, Issue.4
, pp. 253-269
-
-
Hendrickson, C.1
Zozaya-Gorostiza, C.2
Rehak, D.3
Baracco-Miller, E.4
Lim, P.5
-
26
-
-
0028732526
-
Assembly of simulation networks using designs, plans, and methods
-
I.D. Tommelein, R.I. Carr, and A.M. Odeh Assembly of simulation networks using designs, plans, and methods J. Constr. Eng. Manag. ASCE 120 4 1994 796 815
-
(1994)
J. Constr. Eng. Manag. ASCE
, vol.120
, Issue.4
, pp. 796-815
-
-
Tommelein, I.D.1
Carr, R.I.2
Odeh, A.M.3
-
27
-
-
84887850438
-
Integrating building information models with construction process simulations for project scheduling support
-
W.C. Wang, S.W. Weng, S.H. Wang, and C.Y. Chen Integrating building information models with construction process simulations for project scheduling support Autom. Constr. 37 2014 68 80
-
(2014)
Autom. Constr.
, vol.37
, pp. 68-80
-
-
Wang, W.C.1
Weng, S.W.2
Wang, S.H.3
Chen, C.Y.4
-
28
-
-
84863701904
-
Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
-
L. Song, and N.N. Eldin Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling Autom. Constr. 27 2012 32 39
-
(2012)
Autom. Constr.
, vol.27
, pp. 32-39
-
-
Song, L.1
Eldin, N.N.2
-
29
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique
-
I.D. Tommelein Pull-driven scheduling for pipe-spool installation: simulation of a lean construction technique J. Constr. Eng. Manag. ASCE 124 4 1998 279 288
-
(1998)
J. Constr. Eng. Manag. ASCE
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
31
-
-
69949111240
-
-
Luis Alarcon, Annual Conference of the International Group for Lean Construction, Santiago, Chile
-
T.d.C.L. Alves, I.D. Tommelein, and G. Ballard Luis Alarcon, Simulation as a tool for production system design in construction Annual Conference of the International Group for Lean Construction, Santiago, Chile 14 2006 341 353
-
(2006)
Simulation As A Tool for Production System Design in Construction
, vol.14
, pp. 341-353
-
-
Alves D. T, C.L.1
Tommelein, I.D.2
Ballard, G.3
-
32
-
-
2342441450
-
-
Iris Tommelein, Annual Conference of the International Group for Lean Construction, University of California, Berkeley, CA, USA
-
L.F. Alarcón, and D.B. Ashley Iris Tommelein, Playing games: evaluating the impact of lean production strategies on project cost and schedule Annual Conference of the International Group for Lean Construction, University of California, Berkeley, CA, USA 7 1999 263 274
-
(1999)
Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule
, vol.7
, pp. 263-274
-
-
Alarcón, L.F.1
Ashley, D.B.2
|