메뉴 건너뛰기




Volumn 35, Issue , 2013, Pages 595-607

An optimal algorithm of the multi-lifting operating simulation for super-tall building construction

Author keywords

Construction hoist; Lift simulation; Optimization planning; Super high rise building

Indexed keywords

ACCELERATION/DECELERATION; CONSTRUCTION COMPANIES; CONSTRUCTION HOISTS; OPTIMIZATION PLANNING; QUANTITATIVE INDICATORS; SIMULATION TECHNIQUE; SUPER HIGH-RISE BUILDING; SUPER-TALL BUILDINGS;

EID: 84884503520     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2013.01.003     Document Type: Article
Times cited : (18)

References (13)
  • 1
    • 84863766827 scopus 로고    scopus 로고
    • Basic study of smart robotic construction lift for increasing resource lifting efficient in high-rise building construction
    • C. Cho, S. Kwon, J. Lee, S. You, S. Chin, and Y. Kim Basic study of smart robotic construction lift for increasing resource lifting efficient in high-rise building construction Conference Proceeding of ISARC 26(1) 2009 483 491
    • (2009) Conference Proceeding of ISARC , vol.261 , pp. 483-491
    • Cho, C.1    Kwon, S.2    Lee, J.3    You, S.4    Chin, S.5    Kim, Y.6
  • 2
    • 84884500979 scopus 로고    scopus 로고
    • An algorithm for hoisting time calculation in super-tall building construction
    • C. Cho, Y. Shin, S. Won, J. Kim, and M. Cho An algorithm for hoisting time calculation in super-tall building construction Journal paper of KICEM 12 6 2011 120 129
    • (2011) Journal Paper of KICEM , vol.12 , Issue.6 , pp. 120-129
    • Cho, C.1    Shin, Y.2    Won, S.3    Kim, J.4    Cho, M.5
  • 3
    • 84884501067 scopus 로고    scopus 로고
    • An assessment method of vertical transportation loading using TACT in super-tall building construction
    • C. Cho, M. Cho, K. Lee, J. Park, and Y. Shin An assessment method of vertical transportation loading using TACT in super-tall building construction Conference Proceeding of KICEM 11(1) 2011 133 134
    • (2011) Conference Proceeding of KICEM , vol.111 , pp. 133-134
    • Cho, C.1    Cho, M.2    Lee, K.3    Park, J.4    Shin, Y.5
  • 4
    • 84863751434 scopus 로고    scopus 로고
    • An optimal algorithm of the multi lifting operation for super tall building
    • C. Cho, Y. Shin, M. Cho, and S. Won An optimal algorithm of the multi lifting operation for super tall building Conference Proceeding of ISARC 28(1) 2011 503 507
    • (2011) Conference Proceeding of ISARC , vol.281 , pp. 503-507
    • Cho, C.1    Shin, Y.2    Cho, M.3    Won, S.4
  • 5
    • 84863767659 scopus 로고    scopus 로고
    • Simulation method of construction hoist operating plan for high-rise buildings considering lifting height and loads
    • C. Cho, J. Kim, M. Cho, J. Lee, Y. Kim, and S. Kwon Simulation method of construction hoist operating plan for high-rise buildings considering lifting height and loads Conference Proceeding of ISARC 27 1 2010 22 28
    • (2010) Conference Proceeding of ISARC , vol.27 , Issue.1 , pp. 22-28
    • Cho, C.1    Kim, J.2    Cho, M.3    Lee, J.4    Kim, Y.5    Kwon, S.6
  • 7
    • 84884501136 scopus 로고    scopus 로고
    • A development of library DB for lifting work simulation in super-tall building construction
    • C. Cho, J. Kim, Y. Shin, M. Cho, and S. Won A development of library DB for lifting work simulation in super-tall building construction Conference Proceeding of KICEM 09(1) 2009 107 109
    • (2009) Conference Proceeding of KICEM , vol.91 , pp. 107-109
    • Cho, C.1    Kim, J.2    Shin, Y.3    Cho, M.4    Won, S.5
  • 13
    • 84884502779 scopus 로고    scopus 로고
    • Prediction model for tower crane moving time
    • G. Lee, Y. Jeon, and C. Park Prediction model for tower crane moving time Conference Proceeding of KICEM 05 1 2005 90 92
    • (2005) Conference Proceeding of KICEM , vol.5 , Issue.1 , pp. 90-92
    • Lee, G.1    Jeon, Y.2    Park, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.