1
-
-
45849153882
-
-
Alarcón, L.F. and Ashley, D.B., 1999. Playing games: Evaluating the impact of lean production strategies on project cost and schedule. In: Proceedings 7th annual conference of international group for lean construction, 26-28 July, University of Berkeley, California, USA. Available from http://www.iglc.net/conferences
-
Alarcón, L.F. and Ashley, D.B., 1999. Playing games: Evaluating the impact of lean production strategies on project cost and schedule. In: Proceedings 7th annual conference of international group for lean construction, 26-28 July, University of Berkeley, California, USA. Available from http://www.iglc.net/conferences
-
-
-
-
2
-
-
45849141266
-
The impact of planning strategies on project performance: Learning from real and model projects
-
A. Serpell, ed, Pontificia Universidad Católica de Chile
-
Alarcón, L.F., Ashley, D.B., and Cruz, J., 2000. The impact of planning strategies on project performance: Learning from real and model projects. In: A. Serpell, ed. Information and communication in construction procurement - CIB procurement system symposium, Pontificia Universidad Católica de Chile. 329-343.
-
(2000)
Information and communication in construction procurement - CIB procurement system symposium
, pp. 329-343
-
-
Alarcón, L.F.1
Ashley, D.B.2
Cruz, J.3
-
3
-
-
45849108001
-
-
Assessing the Impacts of implementing lean construction, 19-21 July, Sydney, Australia. Available from
-
Alarcón, L.F., et al., 2005, Assessing the Impacts of implementing lean construction. In: Proceedings 13th annual conference of international group for lean construction, 19-21 July, Sydney, Australia. Available from http://www.iglc.net/conferences.
-
(2005)
Proceedings 13th annual conference of international group for lean construction
-
-
Alarcón, L.F.1
-
4
-
-
84856681520
-
Last planner as a site operations tool
-
13-15 August, Guarujá, Brazil. Available from
-
Auda Jr, J., Scola, A. and Itri Conte, A.S., 1998. Last planner as a site operations tool. Proceedings 6th annual conference of international group for lean construction, 13-15 August, Guarujá, Brazil. Available from http://www.iglc.net/conference.
-
(1998)
Proceedings 6th annual conference of international group for lean construction
-
-
Auda Jr, J.1
Scola, A.2
Itri Conte, A.S.3
-
5
-
-
8844280773
-
Lean construction and EPC performance improvement
-
L.F. Alarcón, ed, The Netherlands: A.A. Balkema
-
Ballard, G., 1993. Lean construction and EPC performance improvement. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 79-91.
-
(1993)
Lean construction
, pp. 79-91
-
-
Ballard, G.1
-
6
-
-
2342418968
-
Implementing lean construction: Stabilizing work flow
-
L.F. Alarcón, ed, The Netherlands: A.A. Balkema
-
Ballard, G. and Howell, G., 1994. Implementing lean construction: stabilizing work flow. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 101-110.
-
(1994)
Lean construction
, pp. 101-110
-
-
Ballard, G.1
Howell, G.2
-
7
-
-
84858401654
-
Parc: A case study
-
Birmingham, UK. Available from
-
Ballard, G., Casten, M., and Howell, G., 1996. Parc: A case study. In: Proceedings 4th annual conference of international group for lean construction, Birmingham, UK. Available from http://www.iglc.net/ conferences.
-
(1996)
Proceedings 4th annual conference of international group for lean construction
-
-
Ballard, G.1
Casten, M.2
Howell, G.3
-
9
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G. and Howell, G., 1998. Shielding production: Essential step in production control. Journal of Construction and Engineering Management, ASCE, 124 (1), 11-17.
-
(1998)
Journal of Construction and Engineering Management, ASCE
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
10
-
-
0004011301
-
-
Dissertation PhD, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, UK
-
Ballard, G., 2000. The last planner system of production control. Dissertation (PhD). School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, UK.
-
(2000)
The last planner system of production control
-
-
Ballard, G.1
-
11
-
-
84866089286
-
Complexity - construction in a new perspective
-
22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from
-
Bertelsen, S., 2003. Complexity - construction in a new perspective. Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
-
(2003)
Proceedings 11th annual conference of international group for lean construction
-
-
Bertelsen, S.1
-
12
-
-
45849084676
-
-
Calderón, R., 2003. Plan control: Planning and control support system for production in construction industry. Thesis (MSc). School of Civil Engineering, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile.
-
Calderón, R., 2003. Plan control: Planning and control support system for production in construction industry. Thesis (MSc). School of Civil Engineering, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile.
-
-
-
-
13
-
-
45849088082
-
-
Chitla, V.R. and Abdelhamid, T.S., 2003. Comparing process improvement initiatives based on percent plan complete and labour utilization factors. In: Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
-
Chitla, V.R. and Abdelhamid, T.S., 2003. Comparing process improvement initiatives based on percent plan complete and labour utilization factors. In: Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
-
-
-
-
15
-
-
45849128350
-
-
Fiallo, M. and Revelo, V.H., 2002. Applying the last planner control system to a construction project: A case study in Quito, Ecuador. In: Proceedings 10th annual conference of international group for lean construction, 6-8 August, Gramado, Brazil. Available from http://www.iglc.net/conferences
-
Fiallo, M. and Revelo, V.H., 2002. Applying the last planner control system to a construction project: A case study in Quito, Ecuador. In: Proceedings 10th annual conference of international group for lean construction, 6-8 August, Gramado, Brazil. Available from http://www.iglc.net/conferences
-
-
-
-
16
-
-
57649185563
-
Design of WIP buffers in repetitive projects: A study case
-
25-27 July, Santiago, Chile. Available from
-
González, V., Alarcón, L.F., and Gazmuri, P., 2006. Design of WIP buffers in repetitive projects: A study case. In: Proceedings 14th annual conference of international group for lean construction, 25-27 July, Santiago, Chile. Available from http://www.iglc.net/conferences
-
(2006)
Proceedings 14th annual conference of international group for lean construction
-
-
González, V.1
Alarcón, L.F.2
Gazmuri, P.3
-
17
-
-
84862304759
-
-
González, V., Alarcón, L.F., and Mundaca, F., 2007. Investigating the relationship between planning reliability and project performance: A case study. In: Proceedings 15th annual conference of international group for lean construction, 18-20 July, East Lansing, Michigan, US. Available from http://www.iglc.net/conferences
-
González, V., Alarcón, L.F., and Mundaca, F., 2007. Investigating the relationship between planning reliability and project performance: A case study. In: Proceedings 15th annual conference of international group for lean construction, 18-20 July, East Lansing, Michigan, US. Available from http://www.iglc.net/conferences
-
-
-
-
18
-
-
45849149286
-
-
Horman, M.J., 2000. Process dynamics: Buffer management in building project operations. Dissertation (PhD). Faculty of Architecture, Building and Planning, The University of Melbourne, Melbourne, Australia.
-
Horman, M.J., 2000. Process dynamics: Buffer management in building project operations. Dissertation (PhD). Faculty of Architecture, Building and Planning, The University of Melbourne, Melbourne, Australia.
-
-
-
-
19
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
Howell, G., Laufer, A., and Ballard, G., 1993. Interaction between subcycles: One key to improved methods. Journal of Construction and Engineering Management, ASCE, 119 (2), 323-335.
-
(1993)
Journal of Construction and Engineering Management, ASCE
, vol.119
, Issue.2
, pp. 323-335
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
20
-
-
1642304896
-
Factors affecting project success in the piping function
-
L.F. Alarcón, ed, The Netherlands: A.A. Balkema
-
Howell, G. and Ballard, G., 1995. Factors affecting project success in the piping function. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 161-185.
-
(1995)
Lean construction
, pp. 161-185
-
-
Howell, G.1
Ballard, G.2
-
22
-
-
45849088434
-
Last planner, look ahead, PPC: A driver to the site operations
-
13-15 August, Guarujá, Brazil. Available from
-
Itri Conte, A.S., 1998. Last planner, look ahead, PPC: A driver to the site operations. Proceedings 6th annual conference of international group for lean construction, 13-15 August, Guarujá, Brazil. Available from http://www.iglc.net/conferences
-
(1998)
Proceedings 6th annual conference of international group for lean construction
-
-
Itri Conte, A.S.1
-
23
-
-
3242876277
-
Project management under uncertainty: The impact of heuristics and biases
-
McGray, G.E., Purvis, R.L., and McCray, C.G., 2002. Project management under uncertainty: The impact of heuristics and biases. Project Management Journal, 33 (1), 49-57.
-
(2002)
Project Management Journal
, vol.33
, Issue.1
, pp. 49-57
-
-
McGray, G.E.1
Purvis, R.L.2
McCray, C.G.3
-
24
-
-
45849130187
-
-
Mundaca, F., 2006. Variability analysis and planning reliability improvement in construction projects. Thesis (Bachelor's). Universidad Técnica Federico Santa María, Valparaíso, Chile.
-
Mundaca, F., 2006. Variability analysis and planning reliability improvement in construction projects. Thesis (Bachelor's). Universidad Técnica Federico Santa María, Valparaíso, Chile.
-
-
-
-
25
-
-
17244362051
-
Dynamic planning and control methodology for design/build fast track construction projects
-
Peña-Mora, F. and Li, M., 2001. Dynamic planning and control methodology for design/build fast track construction projects. Journal of Construction and Engineering Management, ASCE, 127 (1), 1-17.
-
(2001)
Journal of Construction and Engineering Management, ASCE
, vol.127
, Issue.1
, pp. 1-17
-
-
Peña-Mora, F.1
Li, M.2
-
26
-
-
84866084504
-
-
Shen, L.J. and K.H. Chua, D., 2005. Impact of variability on construction schedule. Proceedings 13th annual conference of international group for lean construction, July, Sydney, Australia. Available from http://www.iglc.net/ conferences
-
Shen, L.J. and K.H. Chua, D., 2005. Impact of variability on construction schedule. Proceedings 13th annual conference of international group for lean construction, July, Sydney, Australia. Available from http://www.iglc.net/ conferences
-
-
-
-
27
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H.R., et al., 2002. Reducing variability to improve performance as a lean construction principle. Journal of Construction and Engineering Management, ASCE, 128 (2), 144-154.
-
(2002)
Journal of Construction and Engineering Management, ASCE
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
-
28
-
-
12344327099
-
Improving labor flow reliability for better productivity as a lean construction principle
-
Thomas, H.R., et al., 2003. Improving labor flow reliability for better productivity as a lean construction principle. Journal of Construction and Engineering Management, ASCE, 129 (3), 251-261.
-
(2003)
Journal of Construction and Engineering Management, ASCE
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
-
29
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I.D., Riley, D.R., and Howell, G.A., 1999. Parade game: Impact of work flow variability on trade performance. Journal of Construction and Engineering Management, ASCE, 125 (5), 304-310.
-
(1999)
Journal of Construction and Engineering Management, ASCE
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
|