Volumn 19, Issue 5, 2008, Pages 461-474

Investigating the relationship between planning reliability and project performance

Author keywords

Construction industry; Last planner system; Lean production; Planning reliability; Project performance

Indexed keywords

CONSTRUCTION INDUSTRY; PROCESS ENGINEERING; PROCESS PLANNING; PRODUCTION CONTROL; RESEARCH; STATISTICS; WELL STIMULATION;

EID: 45849086928     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280802059023     Document Type: Article
Times cited : (81)

References (31)
  • 1
    • 45849153882 scopus 로고    scopus 로고
    • Alarcón, L.F. and Ashley, D.B., 1999. Playing games: Evaluating the impact of lean production strategies on project cost and schedule. In: Proceedings 7th annual conference of international group for lean construction, 26-28 July, University of Berkeley, California, USA. Available from http://www.iglc.net/conferences
    • Alarcón, L.F. and Ashley, D.B., 1999. Playing games: Evaluating the impact of lean production strategies on project cost and schedule. In: Proceedings 7th annual conference of international group for lean construction, 26-28 July, University of Berkeley, California, USA. Available from http://www.iglc.net/conferences
  • 5
    • 8844280773 scopus 로고
    • Lean construction and EPC performance improvement
    • L.F. Alarcón, ed, The Netherlands: A.A. Balkema
    • Ballard, G., 1993. Lean construction and EPC performance improvement. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 79-91.
    • (1993) Lean construction , pp. 79-91
    • Ballard, G.1
  • 6
    • 2342418968 scopus 로고
    • Implementing lean construction: Stabilizing work flow
    • L.F. Alarcón, ed, The Netherlands: A.A. Balkema
    • Ballard, G. and Howell, G., 1994. Implementing lean construction: stabilizing work flow. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 101-110.
    • (1994) Lean construction , pp. 101-110
    • Ballard, G.1    Howell, G.2
  • 10
    • 0004011301 scopus 로고    scopus 로고
    • Dissertation PhD, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, UK
    • Ballard, G., 2000. The last planner system of production control. Dissertation (PhD). School of Civil Engineering, Faculty of Engineering, The University of Birmingham, Birmingham, UK.
    • (2000) The last planner system of production control
    • Ballard, G.1
  • 11
    • 84866089286 scopus 로고    scopus 로고
    • Complexity - construction in a new perspective
    • 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from
    • Bertelsen, S., 2003. Complexity - construction in a new perspective. Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
    • (2003) Proceedings 11th annual conference of international group for lean construction
    • Bertelsen, S.1
  • 12
    • 45849084676 scopus 로고    scopus 로고
    • Calderón, R., 2003. Plan control: Planning and control support system for production in construction industry. Thesis (MSc). School of Civil Engineering, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile.
    • Calderón, R., 2003. Plan control: Planning and control support system for production in construction industry. Thesis (MSc). School of Civil Engineering, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago, Chile.
  • 13
    • 45849088082 scopus 로고    scopus 로고
    • Chitla, V.R. and Abdelhamid, T.S., 2003. Comparing process improvement initiatives based on percent plan complete and labour utilization factors. In: Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
    • Chitla, V.R. and Abdelhamid, T.S., 2003. Comparing process improvement initiatives based on percent plan complete and labour utilization factors. In: Proceedings 11th annual conference of international group for lean construction, 22-24 July, Virginia Tech, Blacksburg, Virginia, US. Available from http://www.iglc.net/conferences
  • 15
    • 45849128350 scopus 로고    scopus 로고
    • Fiallo, M. and Revelo, V.H., 2002. Applying the last planner control system to a construction project: A case study in Quito, Ecuador. In: Proceedings 10th annual conference of international group for lean construction, 6-8 August, Gramado, Brazil. Available from http://www.iglc.net/conferences
    • Fiallo, M. and Revelo, V.H., 2002. Applying the last planner control system to a construction project: A case study in Quito, Ecuador. In: Proceedings 10th annual conference of international group for lean construction, 6-8 August, Gramado, Brazil. Available from http://www.iglc.net/conferences
  • 17
    • 84862304759 scopus 로고    scopus 로고
    • González, V., Alarcón, L.F., and Mundaca, F., 2007. Investigating the relationship between planning reliability and project performance: A case study. In: Proceedings 15th annual conference of international group for lean construction, 18-20 July, East Lansing, Michigan, US. Available from http://www.iglc.net/conferences
    • González, V., Alarcón, L.F., and Mundaca, F., 2007. Investigating the relationship between planning reliability and project performance: A case study. In: Proceedings 15th annual conference of international group for lean construction, 18-20 July, East Lansing, Michigan, US. Available from http://www.iglc.net/conferences
  • 18
    • 45849149286 scopus 로고    scopus 로고
    • Horman, M.J., 2000. Process dynamics: Buffer management in building project operations. Dissertation (PhD). Faculty of Architecture, Building and Planning, The University of Melbourne, Melbourne, Australia.
    • Horman, M.J., 2000. Process dynamics: Buffer management in building project operations. Dissertation (PhD). Faculty of Architecture, Building and Planning, The University of Melbourne, Melbourne, Australia.
  • 20
    • 1642304896 scopus 로고
    • Factors affecting project success in the piping function
    • L.F. Alarcón, ed, The Netherlands: A.A. Balkema
    • Howell, G. and Ballard, G., 1995. Factors affecting project success in the piping function. In: L.F. Alarcón, ed. Lean construction. The Netherlands: A.A. Balkema, 161-185.
    • (1995) Lean construction , pp. 161-185
    • Howell, G.1    Ballard, G.2
  • 23
    • 3242876277 scopus 로고    scopus 로고
    • Project management under uncertainty: The impact of heuristics and biases
    • McGray, G.E., Purvis, R.L., and McCray, C.G., 2002. Project management under uncertainty: The impact of heuristics and biases. Project Management Journal, 33 (1), 49-57.
    • (2002) Project Management Journal , vol.33 , Issue.1 , pp. 49-57
    • McGray, G.E.1    Purvis, R.L.2    McCray, C.G.3
  • 24
    • 45849130187 scopus 로고    scopus 로고
    • Mundaca, F., 2006. Variability analysis and planning reliability improvement in construction projects. Thesis (Bachelor's). Universidad Técnica Federico Santa María, Valparaíso, Chile.
    • Mundaca, F., 2006. Variability analysis and planning reliability improvement in construction projects. Thesis (Bachelor's). Universidad Técnica Federico Santa María, Valparaíso, Chile.
  • 25
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design/build fast track construction projects
    • Peña-Mora, F. and Li, M., 2001. Dynamic planning and control methodology for design/build fast track construction projects. Journal of Construction and Engineering Management, ASCE, 127 (1), 1-17.
    • (2001) Journal of Construction and Engineering Management, ASCE , vol.127 , Issue.1 , pp. 1-17
    • Peña-Mora, F.1    Li, M.2
  • 26
    • 84866084504 scopus 로고    scopus 로고
    • Shen, L.J. and K.H. Chua, D., 2005. Impact of variability on construction schedule. Proceedings 13th annual conference of international group for lean construction, July, Sydney, Australia. Available from http://www.iglc.net/ conferences
    • Shen, L.J. and K.H. Chua, D., 2005. Impact of variability on construction schedule. Proceedings 13th annual conference of international group for lean construction, July, Sydney, Australia. Available from http://www.iglc.net/ conferences
  • 27
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • Thomas, H.R., et al., 2002. Reducing variability to improve performance as a lean construction principle. Journal of Construction and Engineering Management, ASCE, 128 (2), 144-154.
    • (2002) Journal of Construction and Engineering Management, ASCE , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1
  • 28
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as a lean construction principle
    • Thomas, H.R., et al., 2003. Improving labor flow reliability for better productivity as a lean construction principle. Journal of Construction and Engineering Management, ASCE, 129 (3), 251-261.
    • (2003) Journal of Construction and Engineering Management, ASCE , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.