1
-
-
5444266624
-
-
Soc. of Manufacturing Engineers, Detroit, MI
-
Allen, J., Robinson, C., Stewart, D. (2001). Lean Manufacturing: A Plant Floor Guide. Soc. of Manufacturing Engineers, Detroit, MI, 495 pages.
-
(2001)
Lean Manufacturing: A Plant Floor Guide
, pp. 495
-
-
Allen, J.1
Robinson, C.2
Stewart, D.3
-
2
-
-
11644288742
-
Shielding production: An essential step in production control
-
Ballard, G. and Howell, G. (1998). "Shielding production: An essential step in production control." J. Constr. Engrg. and Mgmt., ASCE, 124 (1), 18-24.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.1
, pp. 18-24
-
-
Ballard, G.1
Howell, G.2
-
3
-
-
0347985526
-
-
BRT. The Business Roundtable, Construction Industry Cost Effectiveness (CICE) Project Report B-3, New York, NY
-
BRT (1982). Construction Technologies Needs and Priorities. The Business Roundtable, Construction Industry Cost Effectiveness (CICE) Project Report B-3, New York, NY.
-
(1982)
Construction Technologies Needs and Priorities
-
-
-
4
-
-
0004283531
-
-
CII. Bureau of Engineering Research Publication 7-2, The University of Texas, Austin, TX
-
CII (1988). "Project Materials Management Primer." Bureau of Engineering Research Publication 7-2, The University of Texas, Austin, TX.
-
(1988)
Project Materials Management Primer
-
-
-
5
-
-
84866089170
-
-
CII. Research Summary 47-1, Constr. Industry Institute, Univ. of Texas, Austin, TX, Dec
-
CII (1996). "Piping: Improving P&IDs, Supplier Data, and Packaged Units." Research Summary 47-1, Constr. Industry Institute, Univ. of Texas, Austin, TX, Dec., 28 pp.
-
(1996)
Piping: Improving P&IDs, Supplier Data, and Packaged Units
, pp. 28
-
-
-
6
-
-
84866093146
-
-
Personal communication, Sydney, Australia
-
Gero, J. (1987). Personal communication, Sydney, Australia.
-
(1987)
-
-
Gero, J.1
-
7
-
-
0012303148
-
-
RR 47-13, Constr. Industry Institute, Univ. of Texas, Austin, TX, September
-
Howell, G.A. and Ballard, H.G. (1996). "Managing Uncertainty in the Piping Process." RR 47-13, Constr. Industry Institute, Univ. of Texas, Austin, TX, September, 103 pp.
-
(1996)
Managing Uncertainty in the Piping Process
, pp. 103
-
-
Howell, G.A.1
Ballard, H.G.2
-
8
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between Subcycles: One Key to Improved Methods." J. Constr. Engrg. and Mgmt., ASCE, 119 (4) 714-728.
-
(1993)
J. Constr. Engrg. and Mgmt., ASCE
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
11
-
-
0004007948
-
-
Ph.D. Diss., Civil & Envir. Engrg., Univ. of Michigan, Ann Arbor, MI
-
Martinez, J.C. (1996). "STROBOSCOPE State and Resource Based Simulation of Construction Processes." Ph.D. Diss., Civil & Envir. Engrg., Univ. of Michigan, Ann Arbor, MI, 518 pp. (available at http://www.strobos.ce.vt.edu/).
-
(1996)
STROBOSCOPE State and Resource Based Simulation of Construction Processes
, pp. 518
-
-
Martinez, J.C.1
-
12
-
-
84954622213
-
An analytical study of the PERT assumptions
-
R. Archibald and R. Villoria, Appendix C, Wiley, New York
-
MacCrimmon, K. and Ryavec, C. (1967). "An Analytical Study of the PERT Assumptions." in R. Archibald and R. Villoria, Network-Based Management Systems (PERT/CPM), Appendix C, Wiley, New York.
-
(1967)
Network-Based Management Systems (PERT/CPM)
-
-
MacCrimmon, K.1
Ryavec, C.2
-
13
-
-
0009115549
-
-
RR 47-12, Constr. Industry Institute, Univ. of Texas, Austin, TX, Aug
-
O'Connor, J.T. and Liao, S.-J. (1996). "Enhancement of the Piping and Instrumentation Diagram, Development Process." RR 47-12, Constr. Industry Institute, Univ. of Texas, Austin, TX, Aug., 136 pp.
-
(1996)
Enhancement of the Piping and Instrumentation Diagram, Development Process
, pp. 136
-
-
O'Connor, J.T.1
Liao, S.-J.2
-
14
-
-
0009256541
-
-
RR 47-11, Constr. Industry Institute, Univ. of Texas, Austin, TX, May
-
O'Connor, J.T. and Goucha, H.Y (1996). "Improving Industrial Piping Through Vendor Data and Packaged Units Processes." RR 47-11, Constr. Industry Institute, Univ. of Texas, Austin, TX, May, 164 pp.
-
(1996)
Improving Industrial Piping Through Vendor Data and Packaged Units Processes
, pp. 164
-
-
O'Connor, J.T.1
Goucha, H.Y.2
-
15
-
-
0000446325
-
Estimating the mean and variance of subjective distributions in pert and decision analysis
-
Perry, C. and Greig, I.D. (1975). "Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis." Mgmt. Science, 21 (12) 1477-1480.
-
(1975)
Mgmt. Science
, vol.21
, Issue.12
, pp. 1477-1480
-
-
Perry, C.1
Greig, I.D.2
-
16
-
-
0043276264
-
-
Tech. Report 97-2, CE&M Prog., Civil & Envir. Engrg. Dept., Univ. of Calif., Berkeley, CA
-
Tommelein, I.D. (1997a). "Discrete-Event Simulation of a Pull-Driven Materials-Handling Process that Requires Resource Matching: Example of Pipe-Spool Installation." Tech. Report 97-2, CE&M Prog., Civil & Envir. Engrg. Dept., Univ. of Calif., Berkeley, CA.
-
(1997)
Discrete-Event Simulation of A Pull-Driven Materials-Handling Process That Requires Resource Matching: Example of Pipe-Spool Installation
-
-
Tommelein, I.D.1
-
17
-
-
13944265382
-
Discrete-event simulation of lean construction processes
-
Group for Lean Construction (IGLC-5), 16-17 July, Griffith Univ.-Gold Coast Campus, Gold Coast, Queensland, Australia
-
Tommelein, I.D. (1997b). "Discrete-event Simulation of Lean Construction Processes." Proc. 5th Ann. Conf. of the Intl. Group for Lean Construction (IGLC-5), 16-17 July, Griffith Univ.-Gold Coast Campus, Gold Coast, Queensland, Australia, 121-135.
-
(1997)
Proc. 5th Ann. Conf. of the Intl
, pp. 121-135
-
-
Tommelein, I.D.1
-
18
-
-
0031332622
-
Models of lean construction processes: Example of pipe-spool materials management
-
Oct. 5-7 in Minneapolis, MN, ASCE
-
Tommelein, I.D. (1997c). "Models of Lean Construction Processes: Example of Pipe-Spool Materials Management." Proc. Construction Congress V, Oct. 5-7 in Minneapolis, MN, ASCE, 156-164.
-
(1997)
Proc. Construction Congress v
, pp. 156-164
-
-
Tommelein, I.D.1
-
19
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I.D. (1998). "Pull-driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique." J. Constr. Engrg. Mgmt., ASCE, 124 (4) 279-288.
-
(1998)
J. Constr. Engrg. Mgmt., ASCE
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
20
-
-
47249157955
-
Lean construction experiments using discrete-event simulation: Techniques and tools for process re-engineering?
-
Tommelein, I.D. (1999). "Lean Construction Experiments using Discrete-event Simulation: Techniques and Tools for Process Re-engineering? " Intl. J. of Computer-Integrated Design and Construction, CIDAC, Special Issue on Construction Process Re-engineering, 1 (2) 53-63.
-
(1999)
Intl. J. of Computer-Integrated Design and Construction, CIDAC, Special Issue on Construction Process Re-engineering
, vol.1
, Issue.2
, pp. 53-63
-
-
Tommelein, I.D.1
-
21
-
-
27144450471
-
-
Research Report PT 172-11, CII, Austin, TX
-
Tommelein, I.D., Walsh, K.D., and Hershauer, J.C. (2003). "Improving Capital Projects Supply Chain Performance." Research Report PT 172-11, CII, Austin, TX, 241 pp.
-
(2003)
Improving Capital Projects Supply Chain Performance
, pp. 241
-
-
Tommelein, I.D.1
Walsh, K.D.2
Hershauer, J.C.3
|