Development of a 4D object-based system for visualizing the risk information of construction projects

Author keywords

3D CAD; Information; Keywords; Risk management; Simulation; Visualization

Indexed keywords

ANALYTIC HIERARCHY; CAD SYSTEM; CONSTRUCTION PROJECTS; CONSTRUCTION RISKS; CONSTRUCTION SITES; DEGREE OF RISKS; INFORMATION; KEYWORDS; OBJECT-BASED SYSTEMS; OPTIMIZATION METHOD; POTENTIAL RISKS; RISK INFORMATION; SIMULATION; SIMULATION SYSTEMS; VISUALIZATION SYSTEM; WORK SPACE;

EID: 84872257736     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2012.11.038     Document Type: Article
Times cited : (34)

References (12)
  • 1
    • 0035476791 scopus 로고    scopus 로고
    • A fuzzy approach to construction project risk assessment and analysis: Construction project risk management system
    • DOI 10.1016/S0965-9978(01)00036-9, PII S0965997801000369
    • V. Carr, and J.H. Tah A fuzzy approach to construction project risk assessment and analysis: construction project risk management system Advances in Engineering Software 32 10 2001 847 857 (Pubitemid 32935156)
    • (2001) Advances in Engineering Software , vol.32 , Issue.10-11 , pp. 847-857
    • Carr, V.1    Tah, J.H.M.2
  • 2
    • 39349114541 scopus 로고    scopus 로고
    • RFID+4D CAD for progress management of structural steel works in high-rise buildings
    • S.Y. Chin, S.W. Yoon, C.H. Choi, and C.Y. Cho RFID+4D CAD for progress management of structural steel works in high-rise buildings Journal of Computing in Civil Engineering 22 2 2008 74 89
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.Y.1    Yoon, S.W.2    Choi, C.H.3    Cho, C.Y.4
  • 3
    • 13944275955 scopus 로고    scopus 로고
    • Evaluating Risk in Construction - Schedule Model (ERIC-S): Construction Schedule Risk Model
    • N. Daud, M. Brenda, and H. Loesie Evaluating Risk in Construction - Schedule Model (ERIC-S): Construction Schedule Risk Model Journal of Construction Engineering and Management 129 5 2003 518 527
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 518-527
    • Daud, N.1    Brenda, M.2    Loesie, H.3
  • 5
    • 67651208854 scopus 로고    scopus 로고
    • Managing construction projects using the advanced programmatic risk analysis and management model
    • W. Imbeah, and S. Guikema Managing construction projects using the advanced programmatic risk analysis and management model Journal of Construction Engineering and Management 135 8 2009 772 781
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.8 , pp. 772-781
    • Imbeah, W.1    Guikema, S.2
  • 6
    • 78049472053 scopus 로고    scopus 로고
    • Improved 4D CAD system for visualizing construction work by using WBS as interface code
    • L.S. Kang, H.S. Moon, S.Y. Park, C.H. Kim, and T.S. Lee Improved 4D CAD system for visualizing construction work by using WBS as interface code KSCE Journal of Civil Engineering 14 6 2010 803 814
    • (2010) KSCE Journal of Civil Engineering , vol.14 , Issue.6 , pp. 803-814
    • Kang, L.S.1    Moon, H.S.2    Park, S.Y.3    Kim, C.H.4    Lee, T.S.5
  • 7
    • 78149283314 scopus 로고    scopus 로고
    • Development of methodology and virtual system for optimized simulation of road design data
    • L.S. Kang, H.S. Moon, N. Dawood, and M.S. Kang Development of methodology and virtual system for optimized simulation of road design data Automation in Construction 19 8 2010 1000 1015
    • (2010) Automation in Construction , vol.19 , Issue.8 , pp. 1000-1015
    • Kang, L.S.1    Moon, H.S.2    Dawood, N.3    Kang, M.S.4
  • 8
    • 76549114928 scopus 로고    scopus 로고
    • An evaluation of the applicability of 4D CAD on construction projects
    • A. Mahalingam, R. Kashyap, and C. Mahajan An evaluation of the applicability of 4D CAD on construction projects Automation in Construction 19 2 2010 148 159
    • (2010) Automation in Construction , vol.19 , Issue.2 , pp. 148-159
    • Mahalingam, A.1    Kashyap, R.2    Mahajan, C.3
  • 10
    • 57649149304 scopus 로고    scopus 로고
    • Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    • A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2 2009 219 236
    • (2009) Automation in Construction , vol.18 , Issue.2 , pp. 219-236
    • Russell, A.1    Staub-French, S.2    Tran, N.3    Wong, W.4
  • 11
    • 68049123109 scopus 로고    scopus 로고
    • A study of ontology-based risk management framework of construction projects through project life cycle
    • H.P. Tserng, S. Yin, R.J. Dzeng, B. Wou, M.D. Tsai, and W.Y. Chen A study of ontology-based risk management framework of construction projects through project life cycle Automation in Construction 18 7 2009 994 1008
    • (2009) Automation in Construction , vol.18 , Issue.7 , pp. 994-1008
    • Tserng, H.P.1    Yin, S.2    Dzeng, R.J.3    Wou, B.4    Tsai, M.D.5    Chen, W.Y.6
  • 12
    • 34447565099 scopus 로고    scopus 로고
    • Application of a fuzzy based decision making methodology to construction project risk assessment
    • DOI 10.1016/j.ijproman.2007.02.006, PII S026378630700049X
    • J. Zeng, M. An, and N. Smith Application of a fuzzy based decision making methodology to construction project risk assessment International Journal of Project Management 25 6 2007 589 600 (Pubitemid 47079918)
    • (2007) International Journal of Project Management , vol.25 , Issue.6 , pp. 589-600
    • Zeng, J.1    An, M.2    Smith, N.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.