1
-
-
84856676129
-
-
Ph.D. Diss. Dept. of Civil and Envir. Engrg., Univ. of California, Berkeley
-
Alves, T.C.L. (2005) Buffering Practices in HVAC Ductwork Supply Chains. Ph.D. Diss. Dept. of Civil and Envir. Engrg., Univ. of California, Berkeley, 308 pp.
-
(2005)
Buffering Practices in HVAC Ductwork Supply Chains
, pp. 308
-
-
Alves, T.C.L.1
-
2
-
-
84866109969
-
Simulation of buffering and batching practices
-
3-5 August, held in Helsingor, Denmark
-
Alves, T.C.L. and Tommelein, I.D. (2004) ''Simulation of Buffering and Batching Practices.'' Proc. 12th Annual Conf. Intl Group for Lean Construction (IGLC 12), 3-5 August, held in Helsingor, Denmark. 277-290
-
(2004)
Proc. 12th Annual Conf. Intl Group for Lean Construction (IGLC 12)
, pp. 277-290
-
-
Alves, T.C.L.1
Tommelein, I.D.2
-
3
-
-
0036932457
-
Contributors to lead time in construction supply chains: Case of pipe supports used in power plants
-
San Diego, CA
-
Arbulu, R.J., Tommelein, I.D., Walsh, K.D., and Hershauer, J.C. (2002). "Contributors to Lead Time in Construction Supply Chains: Case of Pipe Supports Used in Power Plants." Proc. Winter Simul. Conf. 2002 (WSC02), San Diego, CA, pp. 1745-1751.
-
(2002)
Proc. Winter Simul. Conf. 2002 (WSC02)
, pp. 1745-1751
-
-
Arbulu, R.J.1
Tommelein, I.D.2
Walsh, K.D.3
Hershauer, J.C.4
-
4
-
-
0004011301
-
-
Ph.D. Thesis. Faculty of Engineering. School of Civil Engineering. The Univ. of Birmingham, UK
-
Ballard, G. H. (2000) The Last Planner System of Production Control. Ph.D. Thesis. Faculty of Engineering. School of Civil Engineering. The Univ. of Birmingham, UK.
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, G.H.1
-
5
-
-
0004253213
-
-
Second Edition. McGraw-Hill International Editions, Boston, (First Edition 1996)
-
Hopp, W.J. and Spearman, M.L. (2000) Factory Physics. Second Edition. McGraw-Hill International Editions, Boston, 698 pp. (First Edition 1996)
-
(2000)
Factory Physics
, pp. 698
-
-
Hopp, W.J.1
Spearman, M.L.2
-
6
-
-
0027805668
-
Interaction between sub-cycles: One key to improved methods
-
Howell, G.A., Laufer, A., and Ballard, G. (1993) "Interaction between Sub-cycles: One Key to Improved Methods." J. of Constr. Engrg and Mgmt, ASCE, 119 (4) 714-728
-
(1993)
J. of Constr. Engrg and Mgmt, ASCE
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.A.1
Laufer, A.2
Ballard, G.3
-
8
-
-
0004007948
-
-
Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI
-
Martinez, J.C. (1996). STROBOSCOPE: State and Resource Based Simulation of Construction Processes. Ph.D. Dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, MI, 518 pp.
-
(1996)
STROBOSCOPE: State and Resource Based Simulation of Construction Processes
, pp. 518
-
-
Martinez, J.C.1
-
12
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique
-
Tommelein, I.D. (1998) "Pull-driven Scheduling for Pipe-spool Installation: Simulation of a Lean Construction Technique." ASCE, J. of Constr. Engrg and Mgmt, 124 (4) 279-288
-
(1998)
ASCE, J. of Constr. Engrg and Mgmt
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
13
-
-
84855810709
-
Process benefits from use of standard products-simulation experiments using the pipe spool model
-
25-27 July, Santiago, Chile
-
Tommelein, I.D. (2006). "Process benefits from use of standard products-simulation experiments using the pipe spool model." Proc. 14th Ann. Conf. of the Intl. Group for Lean Construction (IGLC-14), 25-27 July, Santiago, Chile.
-
(2006)
Proc. 14th Ann. Conf. of the Intl. Group for Lean Construction (IGLC-14)
-
-
Tommelein, I.D.1
|