Work flow variation and labor productivity: Case study

Author keywords

Construction management; Labor productivity; Last planner system; Work flow; Work flow variation

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION PRACTICE; CONSTRUCTION PROJECTS; FLOW VARIATIONS; LABOR PRODUCTIVITY; LAST PLANNER SYSTEM; PRODUCTION DATA; PRODUCTIVITY LOSS; PROJECT MANAGERS; WORK HOURS; WORK OUTPUT; WORK-FLOWS;

EID: 81855224797     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000056     Document Type: Article
Times cited : (108)

References (30)
  • 1
    • 0000928359 scopus 로고    scopus 로고
    • Getting the most out of your product development process
    • Adler, P. S., Mandelbaum, A., Nguyen, V., and Schwerer, E. (1996). Getting the most out of your product development process. Harv. Bus. Rev., 74 (2), 134-152.
    • (1996) Harv. Bus. Rev. , vol.74 , Issue.2 , pp. 134-152
    • Adler, P.S.1    Mandelbaum, A.2    Nguyen, V.3    Schwerer, E.4
  • 2
    • 8844280773 scopus 로고
    • Lean construction and EPC performance improvement
    • Lean Construction Institute, La Jolla, CA
    • Ballard, G. (1993). Lean construction and EPC performance improvement. Proc. 1st Annual Meeting of the Int. Group for Lean Construction, Lean Construction Institute, La Jolla, CA, 79-92.
    • (1993) Proc. 1st Annual Meeting of the Int. Group for Lean Construction , pp. 79-92
    • Ballard, G.1
  • 5
    • 13944266838 scopus 로고    scopus 로고
    • Improving work flow reliability
    • University of California, Berkeley, CA
    • Ballard, G. (1999). Improving work flow reliability. Fifth Int. Group for Lean Construction, University of California, Berkeley, CA, 275-286.
    • (1999) Fifth Int. Group for Lean Construction , pp. 275-286
    • Ballard, G.1
  • 7
    • 84993044173 scopus 로고    scopus 로고
    • Managing work flow on design projects: A case study
    • 0969-9988, , 10.1046/j.1365-232X.2002.00251.x
    • Ballard, G. (2002). Managing work flow on design projects: A case study. Eng., Constr., Archit. Manage. 0969-9988, 9 (3), 284-291. 10.1046/j.1365-232X. 2002.00251.x
    • (2002) Eng., Constr., Archit. Manage. , vol.9 , Issue.3 , pp. 284-291
    • Ballard, G.1
  • 8
    • 1642563373 scopus 로고
    • Toward construction JIT
    • Association of Researchers in Construction Management, Sheffield, UK
    • Ballard, G., and Howell, G. (1995). Toward construction JIT. ARCOM Conf., Association of Researchers in Construction Management, Sheffield, UK, 1-11.
    • (1995) ARCOM Conf. , pp. 1-11
    • Ballard, G.1    Howell, G.2
  • 9
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). Shielding production: Essential step in production control. J. Constr. Eng. Manage. 0733-9364, 124 (1), 11-17. 10.1061/(ASCE)0733-9364(1998)124:1(11) (Pubitemid 128586379)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 10
    • 0037362304 scopus 로고    scopus 로고
    • Lean project management
    • (a). . 0961-3218, , 10.1080/09613210301997
    • Ballard, G., and Howell, G. (2003 a). Lean project management. Build. Res. Inf. 0961-3218, 31 (2), 119-133. 10.1080/09613210301997
    • (2003) Build. Res. Inf. , vol.31 , Issue.2 , pp. 119-133
    • Ballard, G.1    Howell, G.2
  • 11
    • 84866093667 scopus 로고    scopus 로고
    • Competing construction management paradigms
    • (b). ., ASCE, Reston, VA
    • Ballard, G., and Howell, G. (2003 b). Competing construction management paradigms. Proc. Construction Research Congress, ASCE, Reston, VA, 1-8.
    • (2003) Proc. Construction Research Congress , pp. 1-8
    • Ballard, G.1    Howell, G.2
  • 12
    • 3242706628 scopus 로고    scopus 로고
    • Learning to see work flow: Application of lean production concepts to precast concrete fabrication
    • 0969-9988, , 10.1108/09699980310466505
    • Ballard, G., Harper, N., and Zabelle, T. (2003). Learning to see work flow: Application of lean production concepts to precast concrete fabrication. Eng., Constr., Archit. Manage. 0969-9988, 10 (1), 6-14. 10.1108/ 09699980310466505
    • (2003) Eng., Constr., Archit. Manage. , vol.10 , Issue.1 , pp. 6-14
    • Ballard, G.1    Harper, N.2    Zabelle, T.3
  • 13
    • 0001660022 scopus 로고    scopus 로고
    • Lean construction tools and techniques
    • , R. Best, and G. de Valence, eds., Butterworth-Heineman, Woburn, MA
    • Ballard, G., Tommelein, I., Koskela, L., and Howell, G. (2002). Lean construction tools and techniques. Design and construction: Building in value, R. Best, and, G. de Valence, eds., Butterworth-Heineman, Woburn, MA, 304-376.
    • (2002) Design and Construction: Building in Value , pp. 304-376
    • Ballard, G.1    Tommelein, I.2    Koskela, L.3    Howell, G.4
  • 14
    • 0032667279 scopus 로고    scopus 로고
    • WorkPlan: Constraint-based database for work package scheduling
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1999)125:3(151)
    • Choo, H. J., Tommelein, I. D., Ballard, G., and Zabelle, T. R. (1999). WorkPlan: Constraint-based database for work package scheduling. J. Constr. Eng. Manage. 0733-9364, 125 (3), 151-160. 10.1061/(ASCE)0733-9364(1999)125:3(151)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 151-160
    • Choo, H.J.1    Tommelein, I.D.2    Ballard, G.3    Zabelle, T.R.4
  • 15
    • 11344286586 scopus 로고    scopus 로고
    • Claims for construction productivity losses
    • 0033-3441
    • Finke, M. R. (1997). Claims for construction productivity losses. Public Contract Law J. 0033-3441, 26 (4), 311-337.
    • (1997) Public Contract Law J. , vol.26 , Issue.4 , pp. 311-337
    • Finke, M.R.1
  • 16
    • 81855200369 scopus 로고    scopus 로고
    • Loss of productivity studies-Current uses and misuses
    • 0162-3176
    • Harmon, K. M., and Cole, B. (2006). Loss of productivity studies-Current uses and misuses. Constr. Briefings, 8 (1), 1-19. 0162-3176
    • (2006) Constr. Briefings , vol.8 , Issue.1 , pp. 1-19
    • Harmon, K.M.1    Cole, B.2
  • 17
    • 37249012222 scopus 로고
    • Lean production theory: Moving beyond Can-Do'
    • (a). ., Pontificia Universidad Catolica de Chile, Santiago, Chile
    • Howell, G., and Ballard, G. (1994 a). Lean production theory: Moving beyond Can-Do'. Proc. 2nd Annual Conf. of the Int. Group for Lean Construction, Pontificia Universidad Catolica de Chile, Santiago, Chile, 1-10.
    • (1994) Proc. 2nd Annual Conf. of the Int. Group for Lean Construction , pp. 1-10
    • Howell, G.1    Ballard, G.2
  • 18
    • 13944266409 scopus 로고
    • Implementing lean construction: Reducing inflow variation
    • (b). ., Pontificia Universidad Catolica de Chile, Santiago, Chile
    • Howell, G., and Ballard, G. (1994 b). Implementing lean construction: Reducing inflow variation. Proc. 2nd Annual Conf. of the Int. Group for Lean Construction, Pontificia Universidad Catolica de Chile, Santiago, Chile, 113-121.
    • (1994) Proc. 2nd Annual Conf. of the Int. Group for Lean Construction , pp. 113-121
    • Howell, G.1    Ballard, G.2
  • 19
    • 13944253291 scopus 로고    scopus 로고
    • Discussion of reducing variability to improve performance as a lean construction principle' by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski
    • 0733-9364 10.1061/(ASCE)0733-9364(2004)130:2(299)
    • Howell, G. A., Ballard, G., Tommelein, I. D., and Koskela, L. J. (2004). Discussion of reducing variability to improve performance as a lean construction principle' by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski. J. Constr. Eng. Manage., 130 (2), 299-300. 0733-9364 10.1061/(ASCE)0733-9364(2004)130:2(299)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 299-300
    • Howell, G.A.1    Ballard, G.2    Tommelein, I.D.3    Koskela, L.J.4
  • 20
    • 29044440796 scopus 로고    scopus 로고
    • Improved measured mile analysis technique
    • DOI 10.1061/(ASCE)0733-9364(2005)131:12(1249)
    • Ibbs, W., and Liu, M. (2005). An improved measured mile analysis technique. J. Constr. Eng. Manage. 0733-9364, 131 (12), 1249-1256. 10.1061/(ASCE)0733-9364(2005)131:12(1249) (Pubitemid 41788462)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.12 , pp. 1249-1256
    • Ibbs, W.1    Liu, M.2
  • 21
    • 0003656231 scopus 로고
    • Technical Re No. 72, Center for Integrated Facilities Engineering, Stanford University, Stanford, CA
    • Koskela, L. J. (1992). Application of the new production theory to construction. Technical Rep. No. 72, Center for Integrated Facilities Engineering, Stanford University, Stanford, CA.
    • (1992) Application of the New Production Theory to Construction
    • Koskela, L.J.1
  • 24
    • 0026382438 scopus 로고
    • Factors affecting masonry-labor productivity
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1991)117:4(626)
    • Sanders, S. R., and Thomas, H. R. (1991). Factors affecting masonry-labor productivity. J. Constr. Eng. Manage. 0733-9364, 117 (4), 626-644. 10.1061/(ASCE)0733-9364(1991)117:4(626)
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.4 , pp. 626-644
    • Sanders, S.R.1    Thomas, H.R.2
  • 25
    • 11344272202 scopus 로고
    • Proving productivity losses in government contracts
    • 0033-3441
    • Thomas, S. E. (1989). Proving productivity losses in government contracts. Public Contract Law J. 0033-3441, 18 (2), 414-431.
    • (1989) Public Contract Law J. , vol.18 , Issue.2 , pp. 414-431
    • Thomas, S.E.1
  • 26
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • 0733-9364, , 10.1061/(ASCE)0733-9364(2000)126:4(261)
    • Thomas, H. R. (2000). Schedule acceleration, work flow, and labor productivity. J. Constr. Eng. Manage. 0733-9364, 126 (4), 261-267. 10.1061/(ASCE)0733-9364(2000)126:4(261)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 27
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery method and weather
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). Loss of labor productivity due to delivery method and weather. J. Constr. Eng. Manage. 0733-9364, 125 (1), 39-46. 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 28
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • DOI 10.1061/(ASCE)0733-9364(2002)128:2(144)
    • Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Azvrski, I. (2002). Reducing variability to improve performance as a lean construction principle. J. Constr. Eng. Manage. 0733-9364, 128 (2), 144-154. 10.1061/(ASCE)0733- 9364(2002)128:2(144) (Pubitemid 40265562)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    De Souza, U.E.L.3    Zavrski, I.4
  • 29
    • 81855222834 scopus 로고    scopus 로고
    • Closure to reducing variability to improve performance as a lean construction principle' by H.Randolph Thomas, Michael, J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski
    • 0733-9364, , 10.1061/(ASCE)0733-9364(2004)130:2(300)
    • Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Azvrski, I. (2004). Closure to reducing variability to improve performance as a lean construction principle' by H.Randolph Thomas, Michael, J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski. J. Constr. Eng. Manage. 0733-9364, 130 (2), 300-301. 10.1061/(ASCE)0733-9364(2004)130:2(300)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 300-301
    • Thomas, H.R.1    Horman, M.J.2    De Souza, U.E.L.3    Azvrski, I.4
  • 30
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • 0733-9364, , 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • Tommelein, I., Riley, D. R., and Howell, G. A. (1999). Parade game: Impact of work flow variability on trade performance. J. Constr. Eng. Manage. 0733-9364, 125 (5), 304-310. 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.1    Riley, D.R.2    Howell, G.A.3