Volumn 2012, Issue , 2012, Pages 15-34

Rethinking lookahead planning to optimize construction workflow

Author keywords

Construction planning; Lean construction; Lookahead planning; Production control; Production planning; The Last Planner System

Indexed keywords

CONSTRUCTION INDUSTRY; PLANNING; SURVEYS;

EID: 85026658491     PISSN: None     EISSN: 15551369     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (86)

References (33)
  • 1
    • 24544443628 scopus 로고    scopus 로고
    • The Impact of Project Planning Performance on Project Outcomes
    • October, Santiago, Chile
    • Alarcón, L. F., and Cruz, J. C. (1997)."The Impact of Project Planning Performance on Project Outcomes", Tenth World Productivity Congress, October, Santiago, Chile, pp.12-15.
    • (1997) Tenth World Productivity Congress , pp. 12-15
    • Alarcón, L.F.1    Cruz, J.C.2
  • 3
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, The University of Birmingham, UK
    • Ballard, G. (2000). The Last Planner System of Production Control. Ph.D. Diss., Faculty of Engineering, School of Civil Engineering, The University of Birmingham, UK.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 6
    • 2342418968 scopus 로고
    • Implementing Lean Construction: Stabilizing Work Flow
    • Balkema (edited by L. Alarcon)
    • Ballard, G., and Howell, G. (1994). “Implementing Lean Construction: Stabilizing Work Flow”, in Lean Construction, Balkema (edited by L. Alarcon).
    • (1994) Lean Construction
    • Ballard, G.1    Howell, G.2
  • 12
    • 33746263596 scopus 로고    scopus 로고
    • Prentice Hall Professional Technical Reference, NJ
    • Cohn, M. (2006). Agile Estimating and Planning. Prentice Hall Professional Technical Reference, NJ, pp. 330.
    • (2006) Agile Estimating and Planning , pp. 330
    • Cohn, M.1
  • 14
    • 45849086928 scopus 로고    scopus 로고
    • Investigating the relationship between planning reliability and project performance
    • Gonzalez, V., Alarcon, L.F., and Mundaca, F. (2008). “Investigating the relationship between planning reliability and project performance”, Production Planning & Control, Vol. 19, No.5, July, pp. 461-474.
    • (2008) Production Planning & Control , vol.19 , Issue.5 , pp. 461-474
    • Gonzalez, V.1    Alarcon, L.F.2    Mundaca, F.3
  • 24
    • 0032119946 scopus 로고    scopus 로고
    • Building Operations Management Theory through Case and Field Research
    • Meredith, J. (1998) “Building Operations Management Theory through Case and Field Research.” Journal of Operations Management, 16, pp. 441-454.
    • (1998) Journal of Operations Management , vol.16 , pp. 441-454
    • Meredith, J.1
  • 31
    • 13944264416 scopus 로고    scopus 로고
    • Look-ahead Planning: Screening and Pulling
    • Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA
    • Tommelein, I.D. and Ballard, G. (1997). “Look-ahead Planning: Screening and Pulling.” Technical Report No. 97-9, Construction Engineering and Management Program, Civil and Environmental Engineering Department, University of California, Berkeley, CA, USA.
    • (1997) Technical Report No. 97-9
    • Tommelein, I.D.1    Ballard, G.2
  • 33
    • 0003673547 scopus 로고    scopus 로고
    • Third edition, Sage Publications, Thousand Oaks, CA
    • Yin, R.K. (2003). Case Study Research- Design and Methods. Third edition, Sage Publications, Thousand Oaks, CA, 181 pp.
    • (2003) Case Study Research- Design and Methods , pp. 181
    • Yin, R.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.