메뉴 건너뛰기




Volumn 52, Issue 24, 2014, Pages 7262-7275

A new approach for rebalancing of U-lines with stochastic task times using ant colony optimisation algorithm

Author keywords

ant colony optimisation algorithm; rebalancing; stochastic task times; U lines

Indexed keywords

ANT COLONY OPTIMIZATION; OPERATING COSTS; PRODUCT DESIGN;

EID: 84911990245     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2014.917768     Document Type: Article
Times cited : (33)

References (54)
  • 1
    • 77957791225 scopus 로고    scopus 로고
    • An approach to find task sequence for re-balancing of assembly lines
    • Aʇpak, K. 2010. " An Approach to Find Task Sequence for Re-balancing of Assembly Lines. " Assembly Automation 30 (4): 378-387.
    • (2010) Assembly Automation , vol.30 , Issue.4 , pp. 378-387
    • Aʇpak, K.1
  • 2
    • 33847014539 scopus 로고    scopus 로고
    • A chance-constrained approach to stochastic line balancing problem
    • Aʇpak, K., and H. Gokcen. 2007. " A Chance-constrained Approach to Stochastic Line Balancing Problem. " European Journal of Operational Research 180: 1098-1115.
    • (2007) European Journal of Operational Research , vol.180 , pp. 1098-1115
    • Aʇpak, K.1    Gokcen, H.2
  • 3
    • 2342467327 scopus 로고    scopus 로고
    • A heuristic for single model u-Type stochastic assembly line balancing problems with stochastic task times (in turkish)
    • Aʇpak, K., H. Gokcen, N. N. Saray, and S. Ozel. 2002. " A Heuristic for Single Model U-Type Stochastic Assembly Line Balancing Problems with Stochastic Task Times (in Turkish). " Gazi University Journal of Engineering and Architecture 17 (4): 115-124.
    • (2002) Gazi University Journal of Engineering and Architecture , vol.17 , Issue.4 , pp. 115-124
    • Aʇpak, K.1    Gokcen, H.2    Saray, N.N.3    Ozel, S.4
  • 4
    • 36448976916 scopus 로고    scopus 로고
    • A collaborative ant colony algorithm to stochastic mixed-model u-shaped disassembly line balancing and sequencing problem
    • Agrawal, S., and M. K. Tiwari. 2008. " A Collaborative Ant Colony Algorithm to Stochastic Mixed-model U-shaped Disassembly Line Balancing and Sequencing Problem. " International Journal of Production Research 46 (6): 1405-1429.
    • (2008) International Journal of Production Research , vol.46 , Issue.6 , pp. 1405-1429
    • Agrawal, S.1    Tiwari, M.K.2
  • 5
    • 77956673560 scopus 로고    scopus 로고
    • Reconfiguration of assembly lines under the influence of high product variety in the automotive industry-A decision support system
    • Altemeier, S., M. Helmdach, A. Koberstein, and W. Dangelmaier. 2009. " Reconfiguration of Assembly Lines under the Influence of High Product Variety in the Automotive Industry-A Decision Support System. " International Journal of Production Research 48 (21): 6235-6256.
    • (2009) International Journal of Production Research , vol.48 , Issue.21 , pp. 6235-6256
    • Altemeier, S.1    Helmdach, M.2    Koberstein, A.3    Dangelmaier, W.4
  • 6
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • Arcus, A. L. 1966. " COMSOAL: A Computer Method of Sequencing Operations for Assembly Lines. " International Journal of Production Research 4 (4): 259-277.
    • (1966) International Journal of Production Research , vol.4 , Issue.4 , pp. 259-277
    • Arcus, A.L.1
  • 8
    • 84874540167 scopus 로고    scopus 로고
    • A taxonomy of line balancing problems and their solution approaches
    • Battaïa, O., and A. Dolgui. 2013. " A Taxonomy of Line Balancing Problems and Their Solution Approaches. " International Journal of Production Economics 142 (2): 259-277.
    • (2013) International Journal of Production Economics , vol.142 , Issue.2 , pp. 259-277
    • Battaïa, O.1    Dolgui, A.2
  • 10
    • 33751255097 scopus 로고    scopus 로고
    • Ant algorithms for a time and space constrained assembly line balancing problem
    • Bautista, J., and J. Pereira. 2007. " Ant Algorithms for a Time and Space Constrained Assembly Line Balancing Problem. " European Journal of Operational Research 177 (3): 2016-2032.
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 13
    • 62149085883 scopus 로고    scopus 로고
    • Simple and u-Type assembly line balancing by using an ant colony based algorithm
    • Baykasoglu, A., and T. Dereli. 2009. " Simple and U-Type Assembly Line Balancing by Using an Ant Colony Based Algorithm. " Mathematical and Computational Applications 14 (1): 1-12.
    • (2009) Mathematical and Computational Applications , vol.14 , Issue.1 , pp. 1-12
    • Baykasoglu, A.1    Dereli, T.2
  • 17
    • 67651205275 scopus 로고    scopus 로고
    • Production planning of mixed model assembly lines: Overview and extensions
    • Boysen, N., M. Fliedner, and A. Scholl. 2009. " Production Planning of Mixed Model Assembly Lines: Overview and Extensions. " Production Planning & Control 20 (5): 455-471.
    • (2009) Production Planning & Control , vol.20 , Issue.5 , pp. 455-471
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 18
    • 0347711882 scopus 로고    scopus 로고
    • A comparison of u-line and straight-line performances under stochastic task times
    • Chand, S., and T. Zeng. 2001. " A Comparison of U-line and Straight-line Performances under Stochastic Task Times. " Manufacturing & Service Operations Management 3 (2): 138-150.
    • (2001) Manufacturing & Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 19
    • 33748934553 scopus 로고    scopus 로고
    • The stochastic u-line balancing problem: A heuristic procedure
    • Chiang, W. C., and T. L. Urban. 2006. " The Stochastic U-line Balancing Problem: A Heuristic Procedure. " European Journal of Operational Research 175 (3): 1767-1781.
    • (2006) European Journal of Operational Research , vol.175 , Issue.3 , pp. 1767-1781
    • Chiang, W.C.1    Urban, T.L.2
  • 20
    • 77956615401 scopus 로고    scopus 로고
    • Including different kinds of preferences in a multi-objective ant algorithm for time and space assembly line balancing on different nissan scenarios
    • Chica, M., O. Cordon, S. Damas, and J. Bautista. 2010. " Including Different Kinds of Preferences in a Multi-objective Ant Algorithm for Time and Space Assembly Line Balancing on Different Nissan Scenarios. " Expert Systems with Applications 38 (1): 709-720.
    • (2010) Expert Systems with Applications , vol.38 , Issue.1 , pp. 709-720
    • Chica, M.1    Cordon, O.2    Damas, S.3    Bautista, J.4
  • 23
    • 27644543634 scopus 로고    scopus 로고
    • Ant colony optimization theory: A survey
    • Dorigo, M., and C. Blum. 2005. " Ant Colony Optimization Theory: A Survey. " Theoretical Computer Science 344: 243-278.
    • (2005) Theoretical Computer Science , vol.344 , pp. 243-278
    • Dorigo, M.1    Blum, C.2
  • 24
    • 0003611331 scopus 로고
    • The ant system: An auto catalytic optimizing process
    • Milan: Dipartimento di Elettronica, Politecnico di Milano
    • Dorigo, M., V. Maniezzo, and A. Colorni. 1991. The Ant System: An Auto Catalytic Optimizing Process. Technical Report 91-016. Milan: Dipartimento di Elettronica, Politecnico di Milano.
    • (1991) Technical Report 91-016
    • Dorigo, M.1    Maniezzo, V.2    Colorni, A.3
  • 27
    • 84866126514 scopus 로고    scopus 로고
    • U-shaped assembly lines with stochastic tasks execution times: Heuristic procedures for balancing and re-balancing problems
    • Virginia, VA: Arlington
    • Gamberini, R., A. Grassi, M. Gamberi, R. Manzini, and A. Regattieri. 2004. " U-shaped Assembly Lines with Stochastic Tasks Execution Times: Heuristic Procedures for Balancing and Re-Balancing Problems. " In Proceedings of the Advanced Simulation Technologies Conference, 137-143. Virginia, VA: Arlington.
    • (2004) Proceedings of the Advanced Simulation Technologies Conference , pp. 137-143
    • Gamberini, R.1    Grassi, A.2    Gamberi, M.3    Manzini, R.4    Regattieri, A.5
  • 28
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., A. Grassi, and B. Rimini. 2006. " A New Multi-objective Heuristic Algorithm for Solving the Stochastic Assembly Line Re-balancing Problem. " International Journal of Production Economics 102: 226-243.
    • (2006) International Journal of Production Economics , vol.102 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 29
    • 66149139732 scopus 로고    scopus 로고
    • A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
    • Gamberini, R., E. Gebennini, A. Grassi, and A. Regattieri. 2009. " A Multiple Single-pass Heuristic Algorithm Solving the Stochastic Assembly Line Rebalancing Problem. " International Journal of Production Research 47 (8): 2141-2164.
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2141-2164
    • Gamberini, R.1    Gebennini, E.2    Grassi, A.3    Regattieri, A.4
  • 30
    • 0037316822 scopus 로고    scopus 로고
    • The stochastic u-line balancing problem
    • Guerriero, F., and J. Miltenburg. 2003. " The Stochastic U-line Balancing Problem. " Naval Research Logistics 50 (1): 31-57.
    • (2003) Naval Research Logistics , vol.50 , Issue.1 , pp. 31-57
    • Guerriero, F.1    Miltenburg, J.2
  • 31
    • 0011744338 scopus 로고
    • Currently practiced formulations for the assembly line balance problem
    • Gunter, R. E., G. D. Johnson, and R. S. Peterson. 1983. " Currently Practiced Formulations for the Assembly Line Balance Problem. " Journal of Operations Research 3 (4): 209-221.
    • (1983) Journal of Operations Research , vol.3 , Issue.4 , pp. 209-221
    • Gunter, R.E.1    Johnson, G.D.2    Peterson, R.S.3
  • 33
    • 80053023922 scopus 로고    scopus 로고
    • Balancing straight and u-shaped assembly lines with resource dependent task times
    • Kara, Y., C. Ozguven, N. Yalcin, and Y. Atasagun. 2011. " Balancing Straight and U-shaped Assembly Lines with Resource Dependent Task Times. " International Journal of Production Research 49 (21): 6387-6405.
    • (2011) International Journal of Production Research , vol.49 , Issue.21 , pp. 6387-6405
    • Kara, Y.1    Ozguven, C.2    Yalcin, N.3    Atasagun, Y.4
  • 35
    • 0015639656 scopus 로고
    • A cost-oriented approach to stochastic line balancing
    • Kottas, J. F., and H. S. Lau. 1973. " A Cost-oriented Approach to Stochastic Line Balancing. " AIIE Transactions 5: 164-171.
    • (1973) AIIE Transactions , vol.5 , pp. 164-171
    • Kottas, J.F.1    Lau, H.S.2
  • 36
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen, P. R., and P. Tarasewich. 2003. " Using Ant Techniques to Solve the Assembly Line Balancing Problem. " IIE Transactions 35: 605-617.
    • (2003) IIE Transactions , vol.35 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 37
    • 29344438441 scopus 로고    scopus 로고
    • Multi-objective assembly line balancing via a modified ant colony optimization technique
    • McMullen, P. R., and P. Tarasewich. 2006. " Multi-objective Assembly Line Balancing via a Modified Ant Colony Optimization Technique. " International Journal of Production Research 44 (1): 27-42.
    • (2006) International Journal of Production Research , vol.44 , Issue.1 , pp. 27-42
    • McMullen, P.R.1    Tarasewich, P.2
  • 39
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • Miltenburg, J. 2001. " U-shaped Production Lines: A Review of Theory and Practice. " International Journal of Production Economics 70 (3): 201-214.
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 40
    • 0031379431 scopus 로고    scopus 로고
    • Stochastic analysis of a u-shaped production line with multiple workers
    • Nakade, K., and K. Ohno. 1997. " Stochastic Analysis of a U-shaped Production Line with Multiple Workers. " Computers & Industrial Engineering 33 (3-4): 809-812.
    • (1997) Computers & Industrial Engineering , vol.33 , Issue.3-4 , pp. 809-812
    • Nakade, K.1    Ohno, K.2
  • 43
    • 67651163455 scopus 로고    scopus 로고
    • Ant colony optimization for the single model u-Type assembly line balancing problem
    • Sabuncuoglu, Ihsan, E. Erel, and A. Alp. 2009. " Ant Colony Optimization for the Single Model U-Type Assembly Line Balancing Problem. " International Journal of Production Economics 120 (2): 287-300.
    • (2009) International Journal of Production Economics , vol.120 , Issue.2 , pp. 287-300
    • Sabuncuoglu, I.1    Erel, E.2    Alp, A.3
  • 44
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman, F. N., and J. C. Carter. 1986. " A Cost-based Methodology for Stochastic Line Balancing with Intermittent Line Stoppages. " Management Science 32 (4): 455-463.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 45
    • 59349112769 scopus 로고    scopus 로고
    • 2-ANTBAL: An ant colony optimization algorithm for balancing two-sided assembly lines
    • Simaria, A. S., and P. M. Vilarinho. 2009. " 2-ANTBAL: An Ant Colony Optimization Algorithm for Balancing Two-sided Assembly Lines. " Computers & Industrial Engineering 56: 489-506.
    • (2009) Computers & Industrial Engineering , vol.56 , pp. 489-506
    • Simaria, A.S.1    Vilarinho, P.M.2
  • 46
    • 25144442374 scopus 로고    scopus 로고
    • Stability analysis of an optimal balance for an assembly line with fixed cycle time
    • Sotskov, Y. N., A. Dolgui, and M. C. Portmann. 2006. " Stability Analysis of an Optimal Balance for an Assembly Line with Fixed Cycle Time. " European Journal of Operational Research 168 (3): 783-797.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 783-797
    • Sotskov, Y.N.1    Dolgui, A.2    Portmann, M.C.3
  • 48
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • Talbot, F. B., J. H. Patterson, and W. V. Gehrlein. 1986. " A Comparative Evaluation of Heuristic Line Balancing Techniques. " Management Science 32 (4): 430-454.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 49
    • 25144472327 scopus 로고    scopus 로고
    • An optimal piecewise-linear program for the u-line balancing problem with stochastic task times
    • Urban, T. L., and W. C. Chiang. 2006. " An Optimal Piecewise-linear Program for the U-line Balancing Problem with Stochastic Task Times. " European Journal of Operational Research 168: 771-782.
    • (2006) European Journal of Operational Research , vol.168 , pp. 771-782
    • Urban, T.L.1    Chiang, W.C.2
  • 50
    • 29344441733 scopus 로고    scopus 로고
    • ANTBAL: An ant colony optimization algorithm for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho, P. M., and A. S. Simaria. 2006. " ANTBAL: An Ant Colony Optimization Algorithm for Balancing Mixed-model Assembly Lines with Parallel Workstations. " International Journal of Production Research 44 (2): 291-303.
    • (2006) International Journal of Production Research , vol.44 , Issue.2 , pp. 291-303
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 52
    • 78651433736 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for mixed-model assembly line rebalancing problems
    • Awaji, Japan, July
    • Yang, C., and J. Gao. 2010. " A Multi-objective Genetic Algorithm for Mixed-model Assembly Line Rebalancing Problems. " In 40th International Conference on Computers and Industrial Engineering (CIE). Awaji, Japan, July 25-28.
    • (2010) 40th International Conference on Computers and Industrial Engineering (CIE) , pp. 25-28
    • Yang, C.1    Gao, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.