메뉴 건너뛰기




Volumn 20, Issue 1-4, 2010, Pages 25-45

An empirical comparison of improvement heuristics for the mixed-model U-line balancing problem

Author keywords

GDA; Great deluge algorithm; Mixed model; Record to record travel; RTR; Tabu search; TS; U line

Indexed keywords

INDUSTRIAL ENGINEERING; MANUFACTURE;

EID: 77953853611     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/ijmtm.2010.032890     Document Type: Article
Times cited : (3)

References (51)
  • 2
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labour productivity: An experimental study
    • Aase, G., Olson, J. and Schniederjans, M. (2004) 'U-shaped assembly line layouts and their impact on labour productivity: An experimental study', European Journal of Operational Research, Vol.156, No.3, pp.698-711.
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 698-711
    • Aase, G.1    Olson, J.2    Schniederjans, M.3
  • 5
    • 0026745702 scopus 로고
    • An analytic framework for sequencing mixed-model assembly lines
    • Bard, J., Dar-El, E. and Shtub, A. (1992) 'An analytic framework for sequencing mixed-model assembly lines', International Journal of Production Research, Vol.30, No.1, pp.35-48.
    • (1992) International Journal of Production Research , vol.30 , Issue.1 , pp. 35-48
    • Bard, J.1    Dar-El, E.2    Shtub, A.3
  • 6
    • 0000363908 scopus 로고
    • Sequencing mixed-model assembly lines to level parts usage and minimize line length
    • Bard, J., Shtub, A. and Joshi, S. (1994) 'Sequencing mixed-model assembly lines to level parts usage and minimize line length', International Journal of Production Research, Vol.32, No.10, pp.2431-2454.
    • (1994) International Journal of Production Research , vol.32 , Issue.10 , pp. 2431-2454
    • Bard, J.1    Shtub, A.2    Joshi, S.3
  • 7
    • 33645509107 scopus 로고    scopus 로고
    • Multi-rule multi-objective simulated annealing algorithm for straight and u-type assembly line balancing problems
    • Baykasoǧlu, A. (2006) 'Multi-rule multi-objective simulated annealing algorithm for straight and u-type assembly line balancing problems', Journal of Intelligent Manufacturing, Vol.17, No.2, pp.217-232.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.2 , pp. 217-232
    • Baykasoǧlu, A.1
  • 8
    • 0032187351 scopus 로고    scopus 로고
    • A comparative study of performance measures for throughput of mixed-model assembly line balancing in JIT environment
    • Bukchin, J. (1998) 'A comparative study of performance measures for throughput of mixed-model assembly line balancing in JIT environment', International Journal of Production Research, Vol.36, No.10, pp.2669-2685.
    • (1998) International Journal of Production Research , vol.36 , Issue.10 , pp. 2669-2685
    • Bukchin, J.1
  • 9
    • 0141976792 scopus 로고    scopus 로고
    • Human factor policy testing in the sequencing of manual mixed model assembly lines
    • Celano, G., Costa, A., Fichera, S. and Perrone, G. (2004) 'Human factor policy testing in the sequencing of manual mixed model assembly lines', Computers and Operations Research, Vol.31, No.1, pp.39-59.
    • (2004) Computers and Operations Research , vol.31 , Issue.1 , pp. 39-59
    • Celano, G.1    Costa, A.2    Fichera, S.3    Perrone, G.4
  • 10
    • 0347711882 scopus 로고    scopus 로고
    • A comparison of u-line and straight-line performances under stochastic task times
    • Chand, S. and Zeng, T. (2001) 'A comparison of u-line and straight-line performances under stochastic task times', Manufacturing & Service Operations Management, Vol.3, No.2, pp.138-150.
    • (2001) Manufacturing & Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 12
    • 34250839414 scopus 로고    scopus 로고
    • Line balancing in a just-in-time production environment: Balancing multiple u-lines
    • Chiang, W., Kouvelis, P. and Urban, T. (2007) 'Line balancing in a just-in-time production environment: balancing multiple u-lines', IIE Transactions, Vol.39, No.4, pp.347-359.
    • (2007) IIE Transactions , vol.39 , Issue.4 , pp. 347-359
    • Chiang, W.1    Kouvelis, P.2    Urban, T.3
  • 14
    • 0002535331 scopus 로고
    • New optimization heuristics: The great deluge algorithm and the record-to-record travel
    • Dueck, G. (1993) 'New optimization heuristics: the great deluge algorithm and the record-to-record travel', Journal of Computational Physics, Vol.104, No.1, pp.86-92.
    • (1993) Journal of Computational Physics , vol.104 , Issue.1 , pp. 86-92
    • Dueck, G.1
  • 15
    • 25144482720 scopus 로고
    • Threshold accepting: A general purpose optimization algorithm appearing superior to simulated annealing
    • Dueck, G. and Scheuer, T. (1990) 'Threshold accepting: a general purpose optimization algorithm appearing superior to simulated annealing', Journal of Computational Physics, Vol.90, No.1, pp.161-175.
    • (1990) Journal of Computational Physics , vol.90 , Issue.1 , pp. 161-175
    • Dueck, G.1    Scheuer, T.2
  • 16
    • 0035840757 scopus 로고    scopus 로고
    • Balancing of u-type assembly systems using simulated annealing
    • Erel, E., Sabuncuoglu, I. and Aksu, B. (2001) 'Balancing of u-type assembly systems using simulated annealing', International Journal of Production Research, Vol.39, No.13, pp.3003-3015.
    • (2001) International Journal of Production Research , vol.39 , Issue.13 , pp. 3003-3015
    • Erel, E.1    Sabuncuoglu, I.2    Aksu, B.3
  • 17
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, R. (1989) 'A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems', International Journal of Production Research, Vol.27, No.4, pp.637-670.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.2
  • 18
    • 84989487658 scopus 로고
    • Heuristic for integer programming using surrogate constraints
    • Glover, F. (1977) 'Heuristic for integer programming using surrogate constraints', Decision Sciences, Vol.8, No.1, pp.156-166.
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 156-166
    • Glover, F.1
  • 19
    • 0004215426 scopus 로고    scopus 로고
    • Kluwer Academic Publishers, Boston
    • Glover, F. and Laguna, M. (1997) Tabu Search, Kluwer Academic Publishers, Boston.
    • (1997) Tabu Search
    • Glover, F.1    Laguna, M.2
  • 20
    • 28244475042 scopus 로고    scopus 로고
    • A goal programming approach to simple u-line balancing problem
    • Gökcen, H. and Aǧpak, K. (2006) 'A goal programming approach to simple u-line balancing problem', European Journal of Operational Research, Vol.171, No.2, pp.577-585.
    • (2006) European Journal of Operational Research , vol.171 , Issue.2 , pp. 577-585
    • Gökcen, H.1    Aǧpak, K.2
  • 21
    • 13444306204 scopus 로고    scopus 로고
    • A shortest route formulation of simple u-type assembly line balancing problem
    • Gökcen, H., Aǧpak, K. Gencer, C. and Kizilkaya, E. (2005) 'A shortest route formulation of simple u-type assembly line balancing problem', Applied Mathematical Modelling, Vol.29, No.4, pp.373-380.
    • (2005) Applied Mathematical Modelling , vol.29 , Issue.4 , pp. 373-380
    • Gökcen, H.1    Aǧpak, K.2    Gencer, C.3    Kizilkaya, E.4
  • 22
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood, IL
    • Hall, R. (1983) Zero Inventories, Dow Jones-Irwin, Homewood, IL.
    • (1983) Zero Inventories
    • Hall, R.1
  • 24
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model u-lines with a co-evolutionary algorithm
    • Kim, Y., Kim, S. and Kim, J. (2000) 'Balancing and sequencing mixed-model u-lines with a co-evolutionary algorithm', Production Planning and Control, Vol.11, No.8, pp.754-764.
    • (2000) Production Planning and Control , vol.11 , Issue.8 , pp. 754-764
    • Kim, Y.1    Kim, S.2    Kim, J.3
  • 25
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model u-lines
    • Kim, Y., Kim, J. and Kim, Y. (2006) 'An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model u-lines', European Journal of Operational Research, Vol.168, No.3, pp.838-852.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 838-852
    • Kim, Y.1    Kim, J.2    Kim, Y.3
  • 26
    • 0024770469 scopus 로고
    • Sequencing in an assembly line with blocking to minimize cycle time
    • McCormick, S., Pinedo, M., Shenker, S. and Wolf, B. (1989) 'Sequencing in an assembly line with blocking to minimize cycle time', Operations Research, Vol.37, No.6, pp.925-935.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 925-935
    • McCormick, S.1    Pinedo, M.2    Shenker, S.3    Wolf, B.4
  • 27
    • 0002134614 scopus 로고    scopus 로고
    • Balancing u-lines in a multiple u-line facility
    • Miltenburg, J. (1998) 'Balancing u-lines in a multiple u-line facility', European Journal of Operational Research, Vol.109, No.1, pp.1-23.
    • (1998) European Journal of Operational Research , vol.109 , Issue.1 , pp. 1-23
    • Miltenburg, J.1
  • 28
    • 0034688394 scopus 로고    scopus 로고
    • The effect of breakdowns on u-shaped production lines
    • Miltenburg, J. (2000) 'The effect of breakdowns on u-shaped production lines', International Journal of Production Research, Vol.38, No.2, pp.353-364.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 353-364
    • Miltenburg, J.1
  • 29
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • DOI 10.1016/S0925-5273(00)00064-5, PII S0925527300000645
    • Miltenburg, J. (2001a) 'U-shaped production lines: a review of theory and practice', International Journal of Production Economics, Vol.70, No.3, pp.201-214. (Pubitemid 32272149)
    • (2001) International Journal of Production Economics , vol.70 , Issue.3 , pp. 201-214
    • Miltenburg, J.1
  • 30
    • 0035311608 scopus 로고    scopus 로고
    • One-piece flow manufacturing on u-shaped production lines: A tutorial
    • Miltenburg, J. (2001b) 'One-piece flow manufacturing on u-shaped production lines: a tutorial', IIE Transactions, Vol.33, No.4, pp.303-321.
    • (2001) IIE Transactions , vol.33 , Issue.4 , pp. 303-321
    • Miltenburg, J.1
  • 31
    • 0028531312 scopus 로고
    • The U-line balancing problem
    • Miltenburg, J and Wijngaard, J. (1994) 'The U-line balancing problem', Management Science, Vol.40, No.10, pp.1378-1388.
    • (1994) Management Science , vol.40 , Issue.10 , pp. 1378-1388
    • Miltenburg J1    Wijngaard, J.2
  • 32
    • 0003449926 scopus 로고
    • 2nd ed., Industrial Engineering & Management Press, Institute of Industrial Engineers, Norcross, Georgia
    • Monden, Y. (1993) Toyota Production System, 2nd ed., Industrial Engineering & Management Press, Institute of Industrial Engineers, Norcross, Georgia.
    • (1993) Toyota Production System
    • Monden, Y.1
  • 33
    • 21844512086 scopus 로고
    • Reversibility and dependence in a u-shaped production line
    • Nakade, K. and Ohno, K. (1995) 'Reversibility and dependence in a u-shaped production line', Queuing Systems, Vol.21, Nos. 1-2, pp.183-197.
    • (1995) Queuing Systems , vol.21 , Issue.1-2 , pp. 183-197
    • Nakade, K.1    Ohno, K.2
  • 34
    • 0031379431 scopus 로고    scopus 로고
    • Stochastic analysis of a U-shaped production line with multiple workers
    • PII S036083529700243X
    • Nakade, K. and Ohno, K. (1997) 'Stochastic analysis of a u-shaped production line with multiple workers', Computers and Industrial Engineering, Vol.33, Nos. 3-4, pp.809-812. (Pubitemid 127406908)
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.3-4 , pp. 809-812
    • Nakade, K.1    Ohno, K.2
  • 35
    • 0032624742 scopus 로고    scopus 로고
    • An optimal worker allocation problem for a u-shaped production line
    • Nakade, K. and Ohno, K. (1999) 'An optimal worker allocation problem for a u-shaped production line', International Journal of Production Economics, Vol.60-61, pp.353-358.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 353-358
    • Nakade, K.1    Ohno, K.2
  • 36
    • 0037332862 scopus 로고    scopus 로고
    • Separate and carousel type allocations of workers in a u-shaped production line
    • Nakade, K. and Ohno, K. (2003) 'Separate and carousel type allocations of workers in a u-shaped production line', European Journal of Operational Research, Vol.145, No.2, pp.403-424.
    • (2003) European Journal of Operational Research , vol.145 , Issue.2 , pp. 403-424
    • Nakade, K.1    Ohno, K.2
  • 37
    • 0031272027 scopus 로고    scopus 로고
    • Bounds and approximations for cycle times of a u-shaped production line
    • Nakade, K., Ohno, K. and Shanthikumar, J. (1997) 'Bounds and approximations for cycle times of a u-shaped production line', Operations Research Letters, Vol.21, No.4, pp.191-200.
    • (1997) Operations Research Letters , vol.21 , Issue.4 , pp. 191-200
    • Nakade, K.1    Ohno, K.2    Shanthikumar, J.3
  • 40
    • 0033101693 scopus 로고    scopus 로고
    • ULINO: Optimally balancing u-shaped JIT assembly lines
    • Scholl, A. and Klein, R. (1999) 'ULINO: optimally balancing u-shaped JIT assembly lines', International Journal of Production Research, Vol.37, No.4, pp.721-736.
    • (1999) International Journal of Production Research , vol.37 , Issue.4 , pp. 721-736
    • Scholl, A.1    Klein, R.2
  • 41
    • 0031543416 scopus 로고    scopus 로고
    • Simple assembly line balancing heuristic approaches
    • Scholl, A. and Voß, S. (1996) 'Simple assembly line balancing heuristic approaches', Journal of Heuristics, Vol.2 No.3, pp.217-240.
    • (1996) Journal of Heuristics , vol.2 , Issue.3 , pp. 217-240
    • Scholl, A.1    Voß, S.2
  • 45
    • 0027656618 scopus 로고
    • Comparison of the performance of modern heuristics for combinatorial optimization on real data
    • Sinclair, M. (1993) 'Comparison of the performance of modern heuristics for combinatorial optimization on real data', Computers and Operational Research, Vol.20, No.7, pp.687-695.
    • (1993) Computers and Operational Research , vol.20 , Issue.7 , pp. 687-695
    • Sinclair, M.1
  • 46
    • 0032202723 scopus 로고    scopus 로고
    • Balancing just-in-time production units: The N u-line balancing problem
    • Sparling, D. (1998) 'Balancing just-in-time production units: the N u-line balancing problem', INFOR, Vol.36, No.4, pp.215-237.
    • (1998) INFOR , vol.36 , Issue.4 , pp. 215-237
    • Sparling, D.1
  • 48
    • 0002726139 scopus 로고
    • Line balancing sequence for mixed model assembly
    • Thomopoulos, N. (1967) 'Line balancing sequence for mixed model assembly', Management Science, Vol.14, No.2, pp.59-75.
    • (1967) Management Science , vol.14 , Issue.2 , pp. 59-75
    • Thomopoulos, N.1
  • 49
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos, N. (1970) 'Mixed model line balancing with smoothed station assignments', Management Science, Vol.14, No.2, pp.593-603.
    • (1970) Management Science , vol.14 , Issue.2 , pp. 593-603
    • Thomopoulos, N.1
  • 50
    • 0032070937 scopus 로고    scopus 로고
    • Note: Optimal balancing of u-shaped assembly lines
    • Urban, T. (1998) 'Note: optimal balancing of u-shaped assembly lines', Management Science, Vol.44, No.5, pp.738-741.
    • (1998) Management Science , vol.44 , Issue.5 , pp. 738-741
    • Urban, T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.