메뉴 건너뛰기




Volumn 111, Issue 2, 2008, Pages 509-528

Assembly line balancing: Which model to use when?

Author keywords

Assembly line balancing; Classification; Configuration of assembly lines

Indexed keywords

CLASSIFICATION (OF INFORMATION); MATHEMATICAL MODELS; OPTIMIZATION; PROBLEM SOLVING; STRATEGIC PLANNING;

EID: 37349007853     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.02.026     Document Type: Article
Times cited : (403)

References (175)
  • 1
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labour productivity: an experimental study
    • Aase G.R., Olson J.R., and Schniederjans M.J. U-shaped assembly line layouts and their impact on labour productivity: an experimental study. European Journal of Operational Research 156 (2004) 698-711
    • (2004) European Journal of Operational Research , vol.156 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Schniederjans, M.J.3
  • 4
    • 0028550722 scopus 로고
    • Design for synchronized flow manufacturing
    • Ahmadi R.H., and Wurgaft H. Design for synchronized flow manufacturing. Management Science 40 (1994) 1469-1483
    • (1994) Management Science , vol.40 , pp. 1469-1483
    • Ahmadi, R.H.1    Wurgaft, H.2
  • 5
    • 0031673732 scopus 로고    scopus 로고
    • Ajenblit, D.A., Wainwright, R.L., 1998. Applying genetic algorithms to the U-shaped assembly line balancing problem. In: Proceedings of the 1998 IEEE International Conference on Evolutionary Computation, Anchorage, AK, pp. 96-101.
  • 6
    • 0020816054 scopus 로고
    • A method for assembly line balancing with more than one worker in each station
    • Akagi F., Osaki H., and Kikuchi S. A method for assembly line balancing with more than one worker in each station. International Journal of Production Research 21 (1983) 755-770
    • (1983) International Journal of Production Research , vol.21 , pp. 755-770
    • Akagi, F.1    Osaki, H.2    Kikuchi, S.3
  • 7
    • 0006030850 scopus 로고    scopus 로고
    • Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung
    • Zimmermann U., et al. (Ed), Springer, Berlin
    • Amen M. Ein exaktes Verfahren zur kostenorientierten Fließbandabstimmung. In: Zimmermann U., et al. (Ed). Operations Research Proceedings 1996 (1997), Springer, Berlin 224-229
    • (1997) Operations Research Proceedings 1996 , pp. 224-229
    • Amen, M.1
  • 8
    • 0033881924 scopus 로고    scopus 로고
    • An exact method for cost-oriented assembly line balancing
    • Amen M. An exact method for cost-oriented assembly line balancing. International Journal of Production Economics 64 (2000) 187-195
    • (2000) International Journal of Production Economics , vol.64 , pp. 187-195
    • Amen, M.1
  • 9
    • 0034294050 scopus 로고    scopus 로고
    • Heuristic methods for cost-oriented assembly line balancing: a survey
    • Amen M. Heuristic methods for cost-oriented assembly line balancing: a survey. International Journal of Production Economics 68 (2000) 1-14
    • (2000) International Journal of Production Economics , vol.68 , pp. 1-14
    • Amen, M.1
  • 10
    • 0035852818 scopus 로고    scopus 로고
    • Heuristic methods for cost-oriented assembly line balancing: a comparison on solution quality and computing time
    • Amen M. Heuristic methods for cost-oriented assembly line balancing: a comparison on solution quality and computing time. International Journal of Production Economics 69 (2001) 255-264
    • (2001) International Journal of Production Economics , vol.69 , pp. 255-264
    • Amen, M.1
  • 11
    • 25144463245 scopus 로고    scopus 로고
    • Cost-oriented assembly line balancing: model formulations, solution difficulty, upper and lower bounds
    • Amen M. Cost-oriented assembly line balancing: model formulations, solution difficulty, upper and lower bounds. European Journal of Operational Research 168 (2006) 747-770
    • (2006) European Journal of Operational Research , vol.168 , pp. 747-770
    • Amen, M.1
  • 12
    • 40849130689 scopus 로고
    • COMSOAL: a computer method of sequencing operations for assembly lines
    • Arcus A.L. COMSOAL: a computer method of sequencing operations for assembly lines. International Journal of Production Research 4 (1966) 259-277
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 13
    • 0031270224 scopus 로고    scopus 로고
    • A parallel station heuristic for the mixed-model production line balancing problem
    • Askin R.G., and Zhou M. A parallel station heuristic for the mixed-model production line balancing problem. International Journal of Production Research 35 (1997) 3095-3105
    • (1997) International Journal of Production Research , vol.35 , pp. 3095-3105
    • Askin, R.G.1    Zhou, M.2
  • 15
    • 0024673749 scopus 로고
    • Assembly line balancing with parallel workstations and dead time
    • Bard J.F. Assembly line balancing with parallel workstations and dead time. International Journal of Production Research 27 (1989) 1005-1018
    • (1989) International Journal of Production Research , vol.27 , pp. 1005-1018
    • Bard, J.F.1
  • 19
    • 33751255097 scopus 로고    scopus 로고
    • Ant algorithms for a time and space constrained assembly line balancing problem
    • Bautista J., and Pereira J. Ant algorithms for a time and space constrained assembly line balancing problem. European Journal of Operational Research 177 (2007) 2016-2032
    • (2007) European Journal of Operational Research , vol.177 , pp. 2016-2032
    • Bautista, J.1    Pereira, J.2
  • 20
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • Baybars I. A survey of exact algorithms for the simple assembly line balancing problem. Management Science 32 (1986) 909-932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 21
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker C., and Scholl A. A survey on problems and methods in generalized assembly line balancing. European Journal of Operational Research 168 (2006) 694-715
    • (2006) European Journal of Operational Research , vol.168 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 22
    • 0035840761 scopus 로고    scopus 로고
    • Flexible fixture design and automation: review, issues and future directions
    • Bi Z.M., and Zhang W.J. Flexible fixture design and automation: review, issues and future directions. International Journal of Production Research 39 (2001) 2867-2894
    • (2001) International Journal of Production Research , vol.39 , pp. 2867-2894
    • Bi, Z.M.1    Zhang, W.J.2
  • 24
    • 25144503076 scopus 로고    scopus 로고
    • Controlling mixed-model assembly lines in real-time by using distributed systems
    • Bock S., Rosenberg O., and van Brackel T. Controlling mixed-model assembly lines in real-time by using distributed systems. European Journal of Operational Research 168 (2006) 880-904
    • (2006) European Journal of Operational Research , vol.168 , pp. 880-904
    • Bock, S.1    Rosenberg, O.2    van Brackel, T.3
  • 26
    • 34548399728 scopus 로고    scopus 로고
    • Boysen, N., Fliedner, M., 2006. A versatile algorithm for assembly line balancing. European Journal of Operational Research, doi:10.1016/j.ejor.2006.11.006.
  • 27
    • 34249995941 scopus 로고    scopus 로고
    • Boysen, N., Fliedner, M., Scholl, A., 2006a. A classification of assembly line balancing problems. European Journal of Operational Research, doi:10.1016/j.ejor.2006.10.010.
  • 28
    • 37349088612 scopus 로고    scopus 로고
    • Boysen, N., Fliedner, M., Scholl, A., 2006b. Produktionsplanung bei Variantenfließfertigung: Planungshierarchie und Hierarchische Planung. Zeitschrift für Betriebswirtschaft, to appear.
  • 29
    • 37349080887 scopus 로고    scopus 로고
    • Boysen, N., Fliedner, M., Scholl, A., 2006c. Assembly line balancing: joint precedence graphs under high product variety. Jenaer Schriften zur Wirtschaftswissenschaft 34/2006, University of Jena.
  • 30
    • 0032187351 scopus 로고    scopus 로고
    • A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment
    • Bukchin J. A comparative study of performance measures for throughput of a mixed model assembly line in a JIT environment. International Journal of Production Research 36 (1998) 2669-2685
    • (1998) International Journal of Production Research , vol.36 , pp. 2669-2685
    • Bukchin, J.1
  • 31
  • 32
    • 0037230929 scopus 로고    scopus 로고
    • A weighted approach for assembly line design with station paralleling and equipment selection
    • Bukchin J., and Rubinovitz J. A weighted approach for assembly line design with station paralleling and equipment selection. IIE Transactions 35 (2003) 73-85
    • (2003) IIE Transactions , vol.35 , pp. 73-85
    • Bukchin, J.1    Rubinovitz, J.2
  • 33
    • 0033750053 scopus 로고    scopus 로고
    • Design of flexible assembly line to minimize equipment cost
    • Bukchin J., and Tzur M. Design of flexible assembly line to minimize equipment cost. IIE Transactions 32 (2000) 585-598
    • (2000) IIE Transactions , vol.32 , pp. 585-598
    • Bukchin, J.1    Tzur, M.2
  • 36
    • 33845260328 scopus 로고    scopus 로고
    • A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs
    • Bukchin Y., and Rabinowitch I. A branch-and-bound based solution approach for the mixed-model assembly line-balancing problem for minimizing stations and task duplication costs. European Journal of Operational Research 174 (2006) 492-508
    • (2006) European Journal of Operational Research , vol.174 , pp. 492-508
    • Bukchin, Y.1    Rabinowitch, I.2
  • 38
    • 0016027179 scopus 로고
    • Assembly line balancing with multiple stations
    • Buxey G.M. Assembly line balancing with multiple stations. Management Science 20 (1974) 1010-1021
    • (1974) Management Science , vol.20 , pp. 1010-1021
    • Buxey, G.M.1
  • 39
    • 0015603944 scopus 로고
    • Production flow line system design - a review
    • Buxey G.M., Slack N.D., and Wild R. Production flow line system design - a review. AIIE Transactions 5 (1973) 37-48
    • (1973) AIIE Transactions , vol.5 , pp. 37-48
    • Buxey, G.M.1    Slack, N.D.2    Wild, R.3
  • 40
    • 84946975124 scopus 로고
    • Prediction of the efficiency of production systems without internal storage
    • Buzacott J.A. Prediction of the efficiency of production systems without internal storage. International Journal of Production Research 6 (1968) 173-188
    • (1968) International Journal of Production Research , vol.6 , pp. 173-188
    • Buzacott, J.A.1
  • 41
  • 43
    • 37349111004 scopus 로고    scopus 로고
    • Capacho, L., Pastor, R., 2004. ASALBP: the alternative subgraphs assembly line balancing problem. Working Paper, Universitat Politecnica de Catalunya, Spain.
  • 44
    • 0035480374 scopus 로고    scopus 로고
    • Incorporating physical demand criteria into assembly line balancing
    • Carnahan B.J., Norman B.A., and Redfern M.S. Incorporating physical demand criteria into assembly line balancing. IIE Transactions 33 (2001) 875-887
    • (2001) IIE Transactions , vol.33 , pp. 875-887
    • Carnahan, B.J.1    Norman, B.A.2    Redfern, M.S.3
  • 45
    • 48749137178 scopus 로고
    • A cost-effective approach to stochastic line balancing with off-line repairs
    • Carter J.C., and Silverman F.N. A cost-effective approach to stochastic line balancing with off-line repairs. Journal of Operations Management 4 (1984) 145-157
    • (1984) Journal of Operations Management , vol.4 , pp. 145-157
    • Carter, J.C.1    Silverman, F.N.2
  • 46
    • 0024033958 scopus 로고
    • Line balancing with task learning effects
    • Chakravarty A.K. Line balancing with task learning effects. IIE Transactions 20 (1988) 186-193
    • (1988) IIE Transactions , vol.20 , pp. 186-193
    • Chakravarty, A.K.1
  • 47
    • 0022129886 scopus 로고
    • Balancing mixed model lines with in-process inventories
    • Chakravarty A.K., and Shtub A. Balancing mixed model lines with in-process inventories. Management Science 31 (1985) 1161-1174
    • (1985) Management Science , vol.31 , pp. 1161-1174
    • Chakravarty, A.K.1    Shtub, A.2
  • 48
    • 0022440844 scopus 로고
    • A cost minimization procedure for mixed model production lines with normally distributed task times
    • Chakravarty A.K., and Shtub A. A cost minimization procedure for mixed model production lines with normally distributed task times. European Journal of Operational Research 23 (1986) 25-36
    • (1986) European Journal of Operational Research , vol.23 , pp. 25-36
    • Chakravarty, A.K.1    Shtub, A.2
  • 49
    • 0016028490 scopus 로고
    • Survey of paced assembly lines
    • Chase R.B. Survey of paced assembly lines. Industrial Engineering 6 2 (1974) 14-18
    • (1974) Industrial Engineering , vol.6 , Issue.2 , pp. 14-18
    • Chase, R.B.1
  • 50
    • 0032040841 scopus 로고    scopus 로고
    • Optimizing the number of stations in assembly lines under learning for limited production
    • Cohen Y., and Dar-El M.E. Optimizing the number of stations in assembly lines under learning for limited production. Production Planning and Control 9 (1998) 230-240
    • (1998) Production Planning and Control , vol.9 , pp. 230-240
    • Cohen, Y.1    Dar-El, M.E.2
  • 51
    • 25144463243 scopus 로고    scopus 로고
    • Optimal allocation of work in assembly lines for lots with homogenous learning
    • Cohen Y., Vitner G., and Sarin S.C. Optimal allocation of work in assembly lines for lots with homogenous learning. European Journal of Operational Research 168 (2006) 922-931
    • (2006) European Journal of Operational Research , vol.168 , pp. 922-931
    • Cohen, Y.1    Vitner, G.2    Sarin, S.C.3
  • 52
    • 0023981046 scopus 로고
    • The role of work-in-process inventory in serial production lines
    • Conway R., Maxwell W., McClain J.O., and Thomas L.J. The role of work-in-process inventory in serial production lines. Operations Research 36 (1988) 229-241
    • (1988) Operations Research , vol.36 , pp. 229-241
    • Conway, R.1    Maxwell, W.2    McClain, J.O.3    Thomas, L.J.4
  • 54
    • 0024683477 scopus 로고
    • Balancing cycle time and workstations
    • Deckro R.F. Balancing cycle time and workstations. IIE Transactions 21 (1989) 106-111
    • (1989) IIE Transactions , vol.21 , pp. 106-111
    • Deckro, R.F.1
  • 55
    • 0028769398 scopus 로고
    • Cyclic scheduling to minimize inventory in a batch flow line
    • Dobson G., and Yano C.A. Cyclic scheduling to minimize inventory in a batch flow line. European Journal of Operational Research 75 (1994) 441-461
    • (1994) European Journal of Operational Research , vol.75 , pp. 441-461
    • Dobson, G.1    Yano, C.A.2
  • 56
    • 37349068823 scopus 로고    scopus 로고
    • Dolgui, A., Ihnatsenka, I., 2004. Branch and bound algorithm for optimal design of transfer lines with multi-spindle stations. Working paper, Ecole Nationale Suoerieure des Mines, Saint-Etienne, France.
  • 57
    • 0033284277 scopus 로고    scopus 로고
    • Dolgui, A., Guschinski, N., Levin, G., 1999. On problem of optimal design of transfer lines with parallel and sequential operations. In: Fuertes, J.M. (Ed.), Proceedings of the Seventh IEEE International Conference on Emerging Technologies and Factory Automation, Barcelona, Spain, vol. 1, 1999, pp. 329-334.
  • 58
    • 37349012859 scopus 로고    scopus 로고
    • Dolgui, A., Guschinsky, N., Levin, G., 2001a. Decomposition methods to optimize transfer line with parallel and sequential machining. In: Binder, Z. (Ed.), Management and Control of Production and Logistics, Proceedings of the Second IFAC Conference, Grenoble, France, 2000, vol. 3. Elsevier, Amsterdam, pp. 983-988.
  • 59
    • 37349116956 scopus 로고    scopus 로고
    • Dolgui, A., Guschinsky, N., Levin, G., 2001b. A mixed integer program for balancing of transfer line with grouped operations. In: Proceedings of the 28th International Conference on Computer and Industrial Engineering, Florida, USA, 2001, pp. 541-547.
  • 61
    • 84888617978 scopus 로고    scopus 로고
    • A genetic algorithm for allocation of buffer storage capacities in production line with unreliable machines
    • Dolgui A., Ereemev A., Kolokolov A., and Sigaev V. A genetic algorithm for allocation of buffer storage capacities in production line with unreliable machines. Journal of Mathematical Modelling and Algorithms 1 (2002) 89-104
    • (2002) Journal of Mathematical Modelling and Algorithms , vol.1 , pp. 89-104
    • Dolgui, A.1    Ereemev, A.2    Kolokolov, A.3    Sigaev, V.4
  • 62
    • 85088743576 scopus 로고    scopus 로고
    • Optimal design of automated transfer lines with blocks of parallel operations
    • Camacho E.F., Basanez L., and De la Puente J.A. (Eds), Elsevier, Amsterdam (on cd-rom)
    • Dolgui A., Guschinsky N., and Levin G. Optimal design of automated transfer lines with blocks of parallel operations. In: Camacho E.F., Basanez L., and De la Puente J.A. (Eds). Proceedings of the 15th IFAC World Congress, Barcelona, Spain, 2002 (2003), Elsevier, Amsterdam (on cd-rom)
    • (2003) Proceedings of the 15th IFAC World Congress, Barcelona, Spain, 2002
    • Dolgui, A.1    Guschinsky, N.2    Levin, G.3
  • 64
    • 0345815673 scopus 로고    scopus 로고
    • Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung
    • Domschke W., Klein R., and Scholl A. Antizipative Leistungsabstimmung bei moderner Variantenfließfertigung. Zeitschrift für Betriebswirtschaft 66 (1996) 1465-1490
    • (1996) Zeitschrift für Betriebswirtschaft , vol.66 , pp. 1465-1490
    • Domschke, W.1    Klein, R.2    Scholl, A.3
  • 65
    • 0032677007 scopus 로고    scopus 로고
    • Shortest route formulation of mixed-model assembly line balancing problem
    • Erel E., and Gökcen H. Shortest route formulation of mixed-model assembly line balancing problem. European Journal of Operational Research 116 (1999) 194-204
    • (1999) European Journal of Operational Research , vol.116 , pp. 194-204
    • Erel, E.1    Gökcen, H.2
  • 66
    • 37349014793 scopus 로고    scopus 로고
    • Falkenauer, E., 2005. Line balancing in the real world. In: Proceedings of the International Conference on Product Lifecycle Management, PLM 05, Lumiere University of Lyon, France, 2005 (on cd-rom).
  • 67
    • 37349056043 scopus 로고    scopus 로고
    • Gamberini, R., Grassi, A., Gamberi, M., Manzini, R., Regattieri, A., 2004. U-shaped assembly lines with stochastic tasks execution times: heuristic procedures for balancing and re-balancing problems. In: Proceedings of the Business and Industry Symposium, 2004 Advanced Simulation Technologies Conference, Arlington, Virginia, 〈http://www.scs.org/scsarchive/getDoc.cfm?id=1719〉.
  • 68
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini R., Grassi A., and Riminia B. A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem. International Journal of Production Economics 102 (2006) 226-243
    • (2006) International Journal of Production Economics , vol.102 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Riminia, B.3
  • 69
    • 0032761669 scopus 로고    scopus 로고
    • A new line remedial policy for the paced lines with stochastic task times
    • Gökcen H., and Baykoc O.F. A new line remedial policy for the paced lines with stochastic task times. International Journal of Production Economics 58 (1999) 191-197
    • (1999) International Journal of Production Economics , vol.58 , pp. 191-197
    • Gökcen, H.1    Baykoc, O.F.2
  • 70
    • 0032043473 scopus 로고    scopus 로고
    • Binary integer formulation for mixed-model assembly line balancing problem
    • Gökcen H., and Erel E. Binary integer formulation for mixed-model assembly line balancing problem. Computers and Industrial Engineering 34 (1998) 451-461
    • (1998) Computers and Industrial Engineering , vol.34 , pp. 451-461
    • Gökcen, H.1    Erel, E.2
  • 73
    • 0020751825 scopus 로고
    • An integer programming procedure for assembly system design problems
    • Graves S.C., and Lamar B.W. An integer programming procedure for assembly system design problems. Operations Research 31 (1983) 522-545
    • (1983) Operations Research , vol.31 , pp. 522-545
    • Graves, S.C.1    Lamar, B.W.2
  • 74
    • 0032650282 scopus 로고    scopus 로고
    • An algorithm for optimal buffer placement in reliable serial lines
    • Harris J.H., and Powell S.G. An algorithm for optimal buffer placement in reliable serial lines. IIE Transactions 31 (1999) 287-302
    • (1999) IIE Transactions , vol.31 , pp. 287-302
    • Harris, J.H.1    Powell, S.G.2
  • 75
    • 25144466582 scopus 로고
    • Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren
    • Hautsch K., John H., and Schürgers H. Taktabstimmung bei Fließarbeit mit dem Positionswert-Verfahren. REFA-Nachrichten 25 (1972) 451-464
    • (1972) REFA-Nachrichten , vol.25 , pp. 451-464
    • Hautsch, K.1    John, H.2    Schürgers, H.3
  • 76
    • 0022910386 scopus 로고
    • Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
    • Henig M.I. Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems. Computers and Operations Research 13 (1986) 443-449
    • (1986) Computers and Operations Research , vol.13 , pp. 443-449
    • Henig, M.I.1
  • 77
    • 0001754984 scopus 로고
    • The effect of some design factors on the efficiency of production lines with variable operation times
    • Hillier F.S., and Boling R.W. The effect of some design factors on the efficiency of production lines with variable operation times. Journal of Industrial Engineering 17 (1966) 651-658
    • (1966) Journal of Industrial Engineering , vol.17 , pp. 651-658
    • Hillier, F.S.1    Boling, R.W.2
  • 78
    • 0018509376 scopus 로고
    • On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
    • Hillier F.S., and Boling R.W. On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times. Management Science 25 (1979) 721-728
    • (1979) Management Science , vol.25 , pp. 721-728
    • Hillier, F.S.1    Boling, R.W.2
  • 79
    • 0026239015 scopus 로고
    • The effect of machine breakdowns and interstage storage on the performance of production line systems
    • Hillier F.S., and So K.C. The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research 29 (1991) 2043-2055
    • (1991) International Journal of Production Research , vol.29 , pp. 2043-2055
    • Hillier, F.S.1    So, K.C.2
  • 80
    • 0027574248 scopus 로고
    • Some data for applying the bowl phenomenon to large production line systems
    • Hillier F.S., and So K.C. Some data for applying the bowl phenomenon to large production line systems. International Journal of Production Research 31 (1993) 811-822
    • (1993) International Journal of Production Research , vol.31 , pp. 811-822
    • Hillier, F.S.1    So, K.C.2
  • 81
    • 0027251210 scopus 로고
    • Towards characterizing the optimal allocation of storage space in production line systems with variable processing times
    • Hillier F.S., So K.C., and Boling R.W. Towards characterizing the optimal allocation of storage space in production line systems with variable processing times. Management Science 39 (1993) 126-133
    • (1993) Management Science , vol.39 , pp. 126-133
    • Hillier, F.S.1    So, K.C.2    Boling, R.W.3
  • 83
    • 0020848902 scopus 로고
    • A branch and bound algorithm for assembly line balancing problems with formulation irregularities
    • Johnson R.V. A branch and bound algorithm for assembly line balancing problems with formulation irregularities. Management Science 29 (1983) 1309-1324
    • (1983) Management Science , vol.29 , pp. 1309-1324
    • Johnson, R.V.1
  • 85
    • 0037508541 scopus 로고    scopus 로고
    • Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
    • Karabati S., and Sayin S. Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. European Journal of Operational Research 149 (2003) 417-429
    • (2003) European Journal of Operational Research , vol.149 , pp. 417-429
    • Karabati, S.1    Sayin, S.2
  • 86
    • 0029358711 scopus 로고
    • A strong cutting plane algorithm for the robotic assembly line balancing problem
    • Kim H., and Park S. A strong cutting plane algorithm for the robotic assembly line balancing problem. International Journal of Production Research 33 (1995) 2311-2323
    • (1995) International Journal of Production Research , vol.33 , pp. 2311-2323
    • Kim, H.1    Park, S.2
  • 87
    • 0033993174 scopus 로고    scopus 로고
    • Two-sided assembly line balancing: a genetic algorithm approach
    • Kim Y.K., Kim Y., and Kim Y.J. Two-sided assembly line balancing: a genetic algorithm approach. Production Planning and Control 11 (2000) 44-53
    • (2000) Production Planning and Control , vol.11 , pp. 44-53
    • Kim, Y.K.1    Kim, Y.2    Kim, Y.J.3
  • 88
    • 0000945761 scopus 로고    scopus 로고
    • A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
    • Kim Y.K., Kim J.Y., and Kim Y. A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence 13 (2000) 247-258
    • (2000) Applied Intelligence , vol.13 , pp. 247-258
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 89
    • 0034588691 scopus 로고    scopus 로고
    • Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
    • Kim Y.K., Kim S.J., and Kim J.Y. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Production Planning and Control 11 (2000) 754-764
    • (2000) Production Planning and Control , vol.11 , pp. 754-764
    • Kim, Y.K.1    Kim, S.J.2    Kim, J.Y.3
  • 90
    • 25144469836 scopus 로고    scopus 로고
    • An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
    • Kim Y.K., Kim J.Y., and Kim Y. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research 168 (2006) 838-852
    • (2006) European Journal of Operational Research , vol.168 , pp. 838-852
    • Kim, Y.K.1    Kim, J.Y.2    Kim, Y.3
  • 91
    • 0034466407 scopus 로고    scopus 로고
    • Minimal investment budgets for flow line configuration
    • Kimms A. Minimal investment budgets for flow line configuration. IIE Transactions 32 (2000) 287-298
    • (2000) IIE Transactions , vol.32 , pp. 287-298
    • Kimms, A.1
  • 94
    • 0033360348 scopus 로고    scopus 로고
    • Cyclic scheduling in synchronous production lines
    • Kouvelis P., and Karabati S. Cyclic scheduling in synchronous production lines. IIE Transactions 31 (1999) 709-719
    • (1999) IIE Transactions , vol.31 , pp. 709-719
    • Kouvelis, P.1    Karabati, S.2
  • 98
    • 0023586184 scopus 로고
    • An exploratory study on stopping a paced line when incompletions occur
    • Lau H.-S., and Shtub A. An exploratory study on stopping a paced line when incompletions occur. IIE Transactions 19 (1987) 463-467
    • (1987) IIE Transactions , vol.19 , pp. 463-467
    • Lau, H.-S.1    Shtub, A.2
  • 99
    • 37349001262 scopus 로고    scopus 로고
    • Lebefromm, U., 1999. Produktionsmanagement - Einführung mit Beispielen aus SAP R/3, fourth ed. Oldenbourg, München.
  • 100
    • 0035399914 scopus 로고    scopus 로고
    • Two-sided assembly line balancing to maximize work relatedness and slackness
    • Lee T.O., Kim Y., and Kim Y.K. Two-sided assembly line balancing to maximize work relatedness and slackness. Computers and Industrial Engineering 40 (2001) 273-292
    • (2001) Computers and Industrial Engineering , vol.40 , pp. 273-292
    • Lee, T.O.1    Kim, Y.2    Kim, Y.K.3
  • 102
    • 0013055270 scopus 로고    scopus 로고
    • A single-run optimization algorithm for stochastic assembly line balancing problems
    • Lyu J. A single-run optimization algorithm for stochastic assembly line balancing problems. Journal of Manufacturing Systems 16 (1997) 204-210
    • (1997) Journal of Manufacturing Systems , vol.16 , pp. 204-210
    • Lyu, J.1
  • 103
    • 0015483845 scopus 로고
    • Production-line balances for mixed-model lines
    • Macaskill J.L.C. Production-line balances for mixed-model lines. Management Science 19 (1972) 423-434
    • (1972) Management Science , vol.19 , pp. 423-434
    • Macaskill, J.L.C.1
  • 104
    • 0026238769 scopus 로고
    • A multiple criteria decision making approach for the assembly line balancing problem
    • Malakooti B. A multiple criteria decision making approach for the assembly line balancing problem. International Journal of Production Research 29 (1991) 1979-2001
    • (1991) International Journal of Production Research , vol.29 , pp. 1979-2001
    • Malakooti, B.1
  • 105
    • 0001340484 scopus 로고
    • Assembly line balancing with buffers by multiple criteria optimization
    • Malakooti B. Assembly line balancing with buffers by multiple criteria optimization. International Journal of Production Research 32 (1994) 2159-2178
    • (1994) International Journal of Production Research , vol.32 , pp. 2159-2178
    • Malakooti, B.1
  • 107
    • 0035130068 scopus 로고    scopus 로고
    • Balancing mixed-model assembly lines to reduce work overload
    • Matanachai S., and Yano C.A. Balancing mixed-model assembly lines to reduce work overload. IIE Transactions 33 (2001) 29-42
    • (2001) IIE Transactions , vol.33 , pp. 29-42
    • Matanachai, S.1    Yano, C.A.2
  • 109
    • 0031232825 scopus 로고    scopus 로고
    • A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations
    • McMullen P.R., and Frazier G.V. A heuristic for solving mixed-model line balancing problems with stochastic task durations and parallel stations. International Journal of Production Economics 51 (1997) 177-190
    • (1997) International Journal of Production Economics , vol.51 , pp. 177-190
    • McMullen, P.R.1    Frazier, G.V.2
  • 110
    • 0033469223 scopus 로고    scopus 로고
    • Using simulation and data envelopment analysis to compare assembly line balancing solutions
    • McMullen P.R., and Frazier G.V. Using simulation and data envelopment analysis to compare assembly line balancing solutions. Journal of Productivity Analysis 11 (1998) 149-168
    • (1998) Journal of Productivity Analysis , vol.11 , pp. 149-168
    • McMullen, P.R.1    Frazier, G.V.2
  • 111
    • 0032188659 scopus 로고    scopus 로고
    • Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
    • McMullen P.R., and Frazier G.V. Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations. International Journal of Production Research 36 (1998) 2717-2741
    • (1998) International Journal of Production Research , vol.36 , pp. 2717-2741
    • McMullen, P.R.1    Frazier, G.V.2
  • 112
    • 0038480082 scopus 로고    scopus 로고
    • Using ant techniques to solve the assembly line balancing problem
    • McMullen P.R., and Tarasewich P. Using ant techniques to solve the assembly line balancing problem. IIE Transactions 35 (2003) 605-617
    • (2003) IIE Transactions , vol.35 , pp. 605-617
    • McMullen, P.R.1    Tarasewich, P.2
  • 114
    • 17444400924 scopus 로고    scopus 로고
    • Supply chain planning in the German automotive industry
    • Meyr H. Supply chain planning in the German automotive industry. OR Spectrum 26 (2004) 447-470
    • (2004) OR Spectrum , vol.26 , pp. 447-470
    • Meyr, H.1
  • 117
  • 119
    • 0031272027 scopus 로고    scopus 로고
    • Bounds and approximations for cycle times of a U-shaped production line
    • Nakade N., Ohno J.G., and Shanthikumar J.G. Bounds and approximations for cycle times of a U-shaped production line. Operations Research Letters 21 (1997) 191-200
    • (1997) Operations Research Letters , vol.21 , pp. 191-200
    • Nakade, N.1    Ohno, J.G.2    Shanthikumar, J.G.3
  • 121
    • 0031122267 scopus 로고    scopus 로고
    • A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints
    • Park K., Park S., and Kim W. A heuristic for an assembly line balancing problem with incompatibility, range, and partial precedence constraints. Computers and Industrial Engineering 32 (1997) 321-332
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 321-332
    • Park, K.1    Park, S.2    Kim, W.3
  • 122
    • 25144441275 scopus 로고    scopus 로고
    • Assembly line balancing with incompatibilities and bounded workstation loads
    • Pastor R., and Corominas A. Assembly line balancing with incompatibilities and bounded workstation loads. Ricerca Operativa 30 (2000) 23-45
    • (2000) Ricerca Operativa , vol.30 , pp. 23-45
    • Pastor, R.1    Corominas, A.2
  • 123
    • 0036902263 scopus 로고    scopus 로고
    • Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion
    • Pastor R., Andres C., Duran A., and Perez M. Tabu search algorithms for an industrial multi-product and multi-objective assembly line balancing problem, with reduction of the task dispersion. Journal of the Operational Research Society 53 (2002) 1317-1323
    • (2002) Journal of the Operational Research Society , vol.53 , pp. 1317-1323
    • Pastor, R.1    Andres, C.2    Duran, A.3    Perez, M.4
  • 126
    • 0011717224 scopus 로고    scopus 로고
    • A branch and cut approach for workload smoothing on assembly lines
    • Pinnoi A., and Wilhelm W.E. A branch and cut approach for workload smoothing on assembly lines. INFORMS Journal on Computing 9 (1997) 335-350
    • (1997) INFORMS Journal on Computing , vol.9 , pp. 335-350
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 127
    • 0031677329 scopus 로고    scopus 로고
    • Assembly system design: a branch and cut approach
    • Pinnoi A., and Wilhelm W.E. Assembly system design: a branch and cut approach. Management Science 44 (1998) 103-118
    • (1998) Management Science , vol.44 , pp. 103-118
    • Pinnoi, A.1    Wilhelm, W.E.2
  • 129
    • 0000396642 scopus 로고
    • Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations
    • Pinto P.A., Dannenbring D.G., and Khumawala B.M. Branch and bound and heuristic procedures for assembly line balancing with paralleling of stations. International Journal of Production Research 19 (1981) 565-576
    • (1981) International Journal of Production Research , vol.19 , pp. 565-576
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 130
    • 0020781916 scopus 로고
    • Assembly line balancing with processing alternatives: an application
    • Pinto P.A., Dannenbring D.G., and Khumawala B.M. Assembly line balancing with processing alternatives: an application. Management Science 29 (1983) 817-830
    • (1983) Management Science , vol.29 , pp. 817-830
    • Pinto, P.A.1    Dannenbring, D.G.2    Khumawala, B.M.3
  • 131
    • 0000816262 scopus 로고
    • Buffer allocation in unbalanced three-station serial lines
    • Powell S.G. Buffer allocation in unbalanced three-station serial lines. International Journal of Production Research 32 (1994) 2201-2217
    • (1994) International Journal of Production Research , vol.32 , pp. 2201-2217
    • Powell, S.G.1
  • 132
    • 0019899326 scopus 로고
    • A new method for assembly line balancing having stochastic work elements
    • Raouf A., and Tsui C. A new method for assembly line balancing having stochastic work elements. Computers and Industrial Engineering 6 (1982) 131-148
    • (1982) Computers and Industrial Engineering , vol.6 , pp. 131-148
    • Raouf, A.1    Tsui, C.2
  • 135
    • 84960656106 scopus 로고
    • On a multiproduct assembly line - balancing problem
    • Roberts S.D., and Villa C.D. On a multiproduct assembly line - balancing problem. AIIE Transactions 2 (1970) 361-364
    • (1970) AIIE Transactions , vol.2 , pp. 361-364
    • Roberts, S.D.1    Villa, C.D.2
  • 137
    • 27144456170 scopus 로고    scopus 로고
    • A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation
    • Röder A., and Tibken B. A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation. European Journal of Operational Research 169 (2006) 1010-1029
    • (2006) European Journal of Operational Research , vol.169 , pp. 1010-1029
    • Röder, A.1    Tibken, B.2
  • 138
    • 0006102920 scopus 로고
    • A comparison of heuristic algorithms for cost-oriented assembly line balancing
    • Rosenberg O., and Ziegler H. A comparison of heuristic algorithms for cost-oriented assembly line balancing. Zeitschrift für Operations Research 36 (1992) 477-495
    • (1992) Zeitschrift für Operations Research , vol.36 , pp. 477-495
    • Rosenberg, O.1    Ziegler, H.2
  • 139
    • 0022075822 scopus 로고
    • Designing a production line to maximize profit
    • Rosenblatt M.J., and Carlson R.C. Designing a production line to maximize profit. IIE Transactions 17 (1985) 117-121
    • (1985) IIE Transactions , vol.17 , pp. 117-121
    • Rosenblatt, M.J.1    Carlson, R.C.2
  • 140
    • 0027148640 scopus 로고
    • RALB - a heuristic algorithm for design and balancing of robotic assembly lines
    • Rubinovitz J., and Bukchin J. RALB - a heuristic algorithm for design and balancing of robotic assembly lines. Annals of the CIRP 42 (1993) 497-500
    • (1993) Annals of the CIRP , vol.42 , pp. 497-500
    • Rubinovitz, J.1    Bukchin, J.2
  • 142
    • 0025462434 scopus 로고
    • Development of cost model for the single-model stochastic assembly line balancing problem
    • Sarin S.C., and Erel E. Development of cost model for the single-model stochastic assembly line balancing problem. International Journal of Production Research 28 (1990) 1305-1316
    • (1990) International Journal of Production Research , vol.28 , pp. 1305-1316
    • Sarin, S.C.1    Erel, E.2
  • 143
    • 0013064892 scopus 로고    scopus 로고
    • A methodology for solving single-model, stochastic assembly line balancing problem
    • Sarin S.C., Erel E., and Dar-El E.M. A methodology for solving single-model, stochastic assembly line balancing problem. Omega 27 (1999) 525-535
    • (1999) Omega , vol.27 , pp. 525-535
    • Sarin, S.C.1    Erel, E.2    Dar-El, E.M.3
  • 144
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik T. Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research 143 (2002) 115-124
    • (2002) European Journal of Operational Research , vol.143 , pp. 115-124
    • Sawik, T.1
  • 145
    • 23544472233 scopus 로고
    • Planung der Montageanlage
    • Schöniger J., and Spingler J. Planung der Montageanlage. Technica 14 (1989) 27-32
    • (1989) Technica , vol.14 , pp. 27-32
    • Schöniger, J.1    Spingler, J.2
  • 147
    • 20344397182 scopus 로고    scopus 로고
    • A note on an exact method for cost-oriented assembly line balancing
    • Scholl A., and Becker C. A note on an exact method for cost-oriented assembly line balancing. International Journal of Production Economics 97 (2005) 343-352
    • (2005) International Journal of Production Economics , vol.97 , pp. 343-352
    • Scholl, A.1    Becker, C.2
  • 148
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl A., and Becker C. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operations Research 168 (2006) 666-693
    • (2006) European Journal of Operations Research , vol.168 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 150
    • 37349070310 scopus 로고    scopus 로고
    • Scholl, A., Boysen, N., Fliedner, M., 2006. The sequence-dependent assembly line balancing problem, OR Spectrum, doi:10.1007/s00291-006-0070-3.
  • 151
    • 0021392913 scopus 로고
    • The effect of incompletion cost on line balancing with multiple manning of work stations
    • Shtub A. The effect of incompletion cost on line balancing with multiple manning of work stations. International Journal of Production Research 22 (1984) 235-245
    • (1984) International Journal of Production Research , vol.22 , pp. 235-245
    • Shtub, A.1
  • 154
    • 0022698734 scopus 로고
    • A cost-based methodology for stochastic line balancing with intermittent line stoppages
    • Silverman F.N., and Carter J.C. A cost-based methodology for stochastic line balancing with intermittent line stoppages. Management Science 32 (1986) 455-463
    • (1986) Management Science , vol.32 , pp. 455-463
    • Silverman, F.N.1    Carter, J.C.2
  • 155
    • 0001562309 scopus 로고
    • Stochastic unpaced line design: review and further experimental results
    • Smunt T.L., and Perkins W.C. Stochastic unpaced line design: review and further experimental results. Journal of Operations Management 5 (1985) 351-373
    • (1985) Journal of Operations Management , vol.5 , pp. 351-373
    • Smunt, T.L.1    Perkins, W.C.2
  • 156
    • 0032202723 scopus 로고    scopus 로고
    • Balancing JIT production units: the N U-line balancing problem
    • Sparling D. Balancing JIT production units: the N U-line balancing problem. Information Systems and Operational Research 36 (1998) 215-237
    • (1998) Information Systems and Operational Research , vol.36 , pp. 215-237
    • Sparling, D.1
  • 158
    • 0016961319 scopus 로고
    • Deterministic equivalents for stochastic assembly line balancing
    • Sphicas G.P., and Silverman F.N. Deterministic equivalents for stochastic assembly line balancing. AIIE Transactions 8 (1976) 280-282
    • (1976) AIIE Transactions , vol.8 , pp. 280-282
    • Sphicas, G.P.1    Silverman, F.N.2
  • 160
    • 0020816110 scopus 로고
    • Reliability and optimization considerations in a conveyor-paced assembly line system
    • Suhail A. Reliability and optimization considerations in a conveyor-paced assembly line system. International Journal of Production Research 21 (1983) 627-640
    • (1983) International Journal of Production Research , vol.21 , pp. 627-640
    • Suhail, A.1
  • 161
    • 30244535639 scopus 로고
    • Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems
    • Sumichrast R.T., and Russell R.S. Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems. Journal of Operations Management 9 (1990) 371-390
    • (1990) Journal of Operations Management , vol.9 , pp. 371-390
    • Sumichrast, R.T.1    Russell, R.S.2
  • 162
    • 0026624344 scopus 로고
    • A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
    • Sumichrast R.T., Russell R.S., and Taylor B.W. A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system. International Journal of Production Research 30 (1992) 199-214
    • (1992) International Journal of Production Research , vol.30 , pp. 199-214
    • Sumichrast, R.T.1    Russell, R.S.2    Taylor, B.W.3
  • 163
    • 0242270555 scopus 로고    scopus 로고
    • Practical considerations in the optimization of flow production systems
    • Tempelmeier H. Practical considerations in the optimization of flow production systems. International Journal of Production Research 41 (2003) 149-170
    • (2003) International Journal of Production Research , vol.41 , pp. 149-170
    • Tempelmeier, H.1
  • 164
    • 33845261239 scopus 로고
    • Line balancing - sequencing for mixed-model assembly
    • Thomopoulos N.T. Line balancing - sequencing for mixed-model assembly. Management Science 14 (1967) B59-B75
    • (1967) Management Science , vol.14
    • Thomopoulos, N.T.1
  • 165
    • 0000566084 scopus 로고
    • Mixed model line balancing with smoothed station assignments
    • Thomopoulos N.T. Mixed model line balancing with smoothed station assignments. Management Science 16 (1970) 593-603
    • (1970) Management Science , vol.16 , pp. 593-603
    • Thomopoulos, N.T.1
  • 166
    • 0029276137 scopus 로고
    • Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage
    • Tsai L.-H. Mixed-model sequencing to minimize utility work and the risk of conveyor stoppage. Management Science 41 (1995) 485-495
    • (1995) Management Science , vol.41 , pp. 485-495
    • Tsai, L.-H.1
  • 167
    • 37349000549 scopus 로고    scopus 로고
    • Urban, T.L., Chiang, W.-C., 2006. Balancing unpaced synchronous production lines. Working Paper, University of Tulsa, Oklahoma, USA.
  • 169
    • 0037091985 scopus 로고    scopus 로고
    • A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations
    • Vilarinho P.M., and Simaria A.S. A two-stage heuristic method for balancing mixed-model assembly lines with parallel workstations. International Journal of Production Research 40 (2002) 1405-1420
    • (2002) International Journal of Production Research , vol.40 , pp. 1405-1420
    • Vilarinho, P.M.1    Simaria, A.S.2
  • 170
    • 1642482577 scopus 로고    scopus 로고
    • Visich, J.K., Diaz-Saiz, J., Khumawala, B.M., 2002. Development of heuristics to reduce model imbalance for the mixed-model, U-shaped assembly line. In: Decision Science Institute 2002 Annual Meeting Proceedings, pp. 1786-1791.
  • 172
    • 0032651420 scopus 로고    scopus 로고
    • A column-generation approach for the assembly system design problem with tool changes
    • Wilhelm W.E. A column-generation approach for the assembly system design problem with tool changes. International Journal of Flexible Manufacturing Systems 11 (1999) 177-205
    • (1999) International Journal of Flexible Manufacturing Systems , vol.11 , pp. 177-205
    • Wilhelm, W.E.1
  • 173
    • 0022441646 scopus 로고
    • Formulation of a problem involving assembly lines with multiple manning of work stations
    • Wilson J.M. Formulation of a problem involving assembly lines with multiple manning of work stations. International Journal of Production Research 24 (1986) 59-63
    • (1986) International Journal of Production Research , vol.24 , pp. 59-63
    • Wilson, J.M.1
  • 174
    • 0000544268 scopus 로고
    • Survey, development, and application of algorithms for sequencing paced assembly lines
    • Yano C.A., and Bolat A. Survey, development, and application of algorithms for sequencing paced assembly lines. Journal of Manufacturing and Operations Management 2 (1989) 172-198
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , pp. 172-198
    • Yano, C.A.1    Bolat, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.