메뉴 건너뛰기




Volumn 30, Issue 4, 2010, Pages 378-387

An approach to find task sequence for re-balancing of assembly lines

Author keywords

Assembly; Balancing; Production cycle

Indexed keywords

ASSEMBLY LINE; ASSEMBLY LINE BALANCING; ASSEMBLY LINE DESIGN; CHANGE TASKS; CYCLE TIME; PRODUCTION CYCLE; TWO STAGE;

EID: 77957791225     PISSN: 01445154     EISSN: None     Source Type: Journal    
DOI: 10.1108/01445151011075834     Document Type: Article
Times cited : (17)

References (46)
  • 1
    • 1642587683 scopus 로고    scopus 로고
    • U-shaped assembly line layouts and their impact on labor productivity: An experimental study
    • Aase, G.R., Olson, J.R. and Schniederjans, M.J. (2004), "U-shaped assembly line layouts and their impact on labor productivity: an experimental study", European Journal of Operational Research, Vol. 156 No. 3, pp. 698-711.
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 698-711
    • Aase, G.R.1    Olson, J.R.2    Schniederjans, M.J.3
  • 3
    • 40849130689 scopus 로고
    • Comsoal: A computer method of sequencing operations for assembly lines
    • Arcus, A.L. (1966), "Comsoal: a computer method of sequencing operations for assembly lines", International Journal of Production Research, Vol. 4, pp. 259-77.
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 4
    • 0022768294 scopus 로고
    • SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM.
    • Baybars, I. (1986), "A survey of exact algorithms for the simple assembly line balancing problem", Management Science, Vol. 32 No. 8, pp. 909-32. (Pubitemid 16612186)
    • (1986) Management Science , vol.32 , Issue.8 , pp. 909-932
    • Baybars Ilker1
  • 5
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • Becker, C. and Scholl, A. (2006), "A survey on problems and methods in generalized assembly line balancing", European Journal of Operational Research, Vol. 168 No. 3, pp. 694-715.
    • (2006) European Journal of Operational Research , vol.168 , Issue.3 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 6
    • 34548399728 scopus 로고    scopus 로고
    • A versatile algorithm for assembly line balancing
    • Boysen, N. and Fliedner, M. (2008), "A versatile algorithm for assembly line balancing", European Journal of Operational Research, Vol. 184 No. 1, pp. 39-56.
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 39-56
    • Boysen, N.1    Fliedner, M.2
  • 9
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen, N., Fliedner, M. and Scholl, A. (2009), "Sequencing mixed-model assembly lines: survey, classification and model critique", European Journal of Operational Research, Vol. 192 No. 2, pp. 349-73.
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 10
    • 0347711882 scopus 로고    scopus 로고
    • A comparison of U-line and straight line performances under stochastic task times
    • Chand, S. and Zeng, T. (2001), "A comparison of U-line and straight line performances under stochastic task times", Manufacturing and Service Operations Management, Vol.3 No. 2, pp. 138-50.
    • (2001) Manufacturing and Service Operations Management , vol.3 , Issue.2 , pp. 138-150
    • Chand, S.1    Zeng, T.2
  • 12
    • 34250839414 scopus 로고    scopus 로고
    • Line balancing in a just-in-time production environment: Balancing multiple U-lines
    • Chiang, W., Kouvelis, P. and Urban, T.L. (2007), "Line balancing in a just-in-time production environment: balancing multiple U-lines", IIE Transactions, Vol.39, pp.347-59.
    • (2007) IIE Transactions , vol.39 , pp. 347-359
    • Chiang, W.1    Kouvelis, P.2    Urban, T.L.3
  • 13
    • 0032040841 scopus 로고    scopus 로고
    • Optimizing the number of stations in assembly lines under learning for limited production
    • Cohen, Y. and Dar-El, M.E. (1998), "Optimizing the number of stations in assembly lines under learning for limited production", Production Planning & Control, Vol. 9 No. 3, pp. 230-40.
    • (1998) Production Planning & Control , vol.9 , Issue.3 , pp. 230-240
    • Cohen, Y.1    Dar-El, M.E.2
  • 15
    • 0035922493 scopus 로고    scopus 로고
    • A simple and effective heuristic for the resource constrained project scheduling problem
    • DePuy, G.W. and Whitehouse, G.E. (2001), "A simple and effective heuristic for the resource constrained project scheduling problem", International Journal of Production Research, Vol. 39 No. 14, pp. 3275-87.
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3275-3287
    • Depuy, G.W.1    Whitehouse, G.E.2
  • 16
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erdal, E. and Sarin, S.C. (1998), "A survey of the assembly line balancing procedures", Production Planning & Control, Vol. 9 No. 5, pp. 414-34.
    • (1998) Production Planning & Control , vol.9 , Issue.5 , pp. 414-434
    • Erdal, E.1    Sarin, S.C.2
  • 19
    • 33646075952 scopus 로고    scopus 로고
    • A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem
    • Gamberini, R., Grassi, A. and Rimini, B. (2006), "A new multi-objective heuristic algorithm for solving the stochastic assembly line re-balancing problem", International Journal of Production Economics, Vol. 102, pp. 226-43.
    • (2006) International Journal of Production Economics , vol.102 , pp. 226-243
    • Gamberini, R.1    Grassi, A.2    Rimini, B.3
  • 20
    • 66149139732 scopus 로고    scopus 로고
    • Amultiple single-pass heuristic algorithm solvingthe stochastic assembly line rebalancing problem
    • Gamberini, R., Gebennini, A., Grassi, A. and Regattieri, A. (2009), "Amultiple single-pass heuristic algorithm solvingthe stochastic assembly line rebalancing problem", International Journal of Production Research, Vol. 47 No. 8, pp. 2141-64.
    • (2009) International Journal of Production Research , vol.47 , Issue.8 , pp. 2141-2164
    • Gamberini, R.1    Gebennini, A.2    Grassi, A.3    Regattieri, A.4
  • 21
    • 77957817841 scopus 로고    scopus 로고
    • U-shaped assembly lines with stochastic tasks execution times: Heuristic procedures for balancing and re-balancing problems
    • Business and Industry Symposium
    • Gamberini, R., Grassi, A., Gamberi, M., Manzini, R. and Regattieri, A. (2004), "U-shaped assembly lines with stochastic tasks execution times: heuristic procedures for balancing and re-balancing problems", paper presented at the Business and Industry Symposium, available at: www.scs.org/scsarchive/getDoc.cfm?id=1719 (accessed August 6, 2009).
    • (2004) Paper Presented at The, Available At, (Accessed August 6, 2009)
    • Gamberini, R.1    Grassi, A.2    Gamberi, M.3    Manzini, R.4    Regattieri, A.5
  • 22
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, J. (1989), "A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems", International Journal of Production Research, Vol. 27 No. 4, pp. 637-70.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, J.2
  • 23
  • 24
    • 0015639656 scopus 로고
    • A cost oriented approach to stochastic line balancing
    • Kottas, J.F. and Lau, H.S. (1973), "A cost oriented approach to stochastic line balancing", AIIE Transactions, Vol. 5 No. 2, pp. 164-71.
    • (1973) AIIE Transactions , vol.5 , Issue.2 , pp. 164-171
    • Kottas, J.F.1    Lau, H.S.2
  • 27
    • 77957797614 scopus 로고    scopus 로고
    • Bi-criteria process routing based on COMSOAL approach
    • Lee, S. (2005), "Bi-criteria process routing based on COMSOAL approach", International Journal of Management Science, Vol. 11 No. 2, pp. 45-61.
    • (2005) International Journal of Management Science , vol.11 , Issue.2 , pp. 45-61
    • Lee, S.1
  • 28
    • 85151541628 scopus 로고    scopus 로고
    • Changeable and reconfigurable assembly systems
    • ElMaraghy, H.A.(Ed.), Springer, London
    • Lotter, B. and Wiendahl, H.P. (2009), "Changeable and reconfigurable assembly systems", in ElMaraghy, H.A.(Ed.), Changeable and Reconfigurable Manufacturing Systems, Springer, London, pp. 127-42.
    • (2009) Changeable and Reconfigurable Manufacturing Systems , pp. 127-142
    • Lotter, B.1    Wiendahl, H.P.2
  • 29
    • 40449083604 scopus 로고    scopus 로고
    • A survey of the literature on the multiple or parallel assembly line balancing problem
    • Lusa, A. (2008), "A survey of the literature on the multiple or parallel assembly line balancing problem", European Journal of Industrial Engineering, Vol. 2 No. 1, pp. 50-72.
    • (2008) European Journal of Industrial Engineering , vol.2 , Issue.1 , pp. 50-72
    • Lusa, A.1
  • 32
    • 0034688394 scopus 로고    scopus 로고
    • The effect of breakdowns on U-shaped production lines
    • Miltenburg, G.J. (2000), "The effect of breakdowns on U-shaped production lines", International Journal of Production Research, Vol. 38 No. 2, pp. 353-64.
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 353-364
    • Miltenburg, G.J.1
  • 33
    • 0035311608 scopus 로고    scopus 로고
    • One-piece flow manufacturing on U-shaped production lines: A tutorial
    • Miltenburg, G.J. (2001a), "One-piece flow manufacturing on U-shaped production lines: a tutorial", IIE Transactions, Vol. 33, pp. 303-21.
    • (2001) IIE Transactions , vol.33 , pp. 303-321
    • Miltenburg, G.J.1
  • 34
    • 0035906303 scopus 로고    scopus 로고
    • U-shaped production lines: A review of theory and practice
    • Miltenburg, G.J. (2001b), "U-shaped production lines: a review of theory and practice", International Journal of Production Economics, Vol. 70, pp. 201-14.
    • (2001) International Journal of Production Economics , vol.70 , pp. 201-214
    • Miltenburg, G.J.1
  • 36
  • 37
    • 35148859460 scopus 로고    scopus 로고
    • Performance of serial assembly line designs under unequal operator speeds and learning
    • Montano, A., Villalobos, R., Gutierrez, M.A. and Mar, L. (2007), "Performance of serial assembly line designs under unequal operator speeds and learning", International Journal of Production Research, Vol. 22 No. 15, pp. 5355-81.
    • (2007) International Journal of Production Research , vol.22 , Issue.15 , pp. 5355-5381
    • Montano, A.1    Villalobos, R.2    Gutierrez, M.A.3    Mar, L.4
  • 38
  • 39
    • 21544434350 scopus 로고    scopus 로고
    • Development of a knowledge-based system for balancing complex mixed model assembly lines
    • Roy, R. and Allchurch, M.J. (1996), "Development of a knowledge-based system for balancing complex mixed model assembly lines", International Journal of Computer Integrated Manufacturing, Vol. 9 No. 3, pp. 205-16.
    • (1996) International Journal of Computer Integrated Manufacturing , vol.9 , Issue.3 , pp. 205-216
    • Roy, R.1    Allchurch, M.J.2
  • 40
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • Scholl, A. and Becker, C. (2006), "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing", European Journal of Operational Research, Vol. 168, pp. 666-93.
    • (2006) European Journal of Operational Research , vol.168 , pp. 666-693
    • Scholl, A.1    Becker, C.2
  • 41
    • 0001193704 scopus 로고    scopus 로고
    • SALOME: A bidrectional branch and bound procedure for assembly line balancing
    • Scholl, A. and Klein, R. (1997), "SALOME: a bidrectional branch and bound procedure for assembly line balancing", INFORMS Journal of Computing, Vol. 9 No. 4, pp. 319-34.
    • (1997) INFORMS Journal of Computing , vol.9 , Issue.4 , pp. 319-334
    • Scholl, A.1    Klein, R.2
  • 42
    • 0033101693 scopus 로고    scopus 로고
    • ULINO: Optimally balancing U-shaped JIT assembly lines
    • Scholl, A. and Klein, R. (1999), "ULINO: optimally balancing U-shaped JIT assembly lines", International Journal of Production Research, Vol. 37 No. 4, pp. 721-36.
    • (1999) International Journal of Production Research , vol.37 , Issue.4 , pp. 721-736
    • Scholl, A.1    Klein, R.2
  • 43
    • 0032070937 scopus 로고    scopus 로고
    • Note: Optimal balancing of U-shaped assembly lines
    • Urban, T.L. (1998), "Note: optimal balancing of U-shaped assembly lines", Management Science, Vol. 44, pp. 738-41.
    • (1998) Management Science , vol.44 , pp. 738-741
    • Urban, T.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.