메뉴 건너뛰기




Volumn 45, Issue 3, 2014, Pages 74-90

Stakeholders' Attributes, behaviors, and decision-making strategies in construction projects: Importance and correlations in practice

Author keywords

construction projects; decision making strategies; stakeholder attributes; stakeholder behaviors

Indexed keywords


EID: 84901825514     PISSN: 87569728     EISSN: 19389507     Source Type: Journal    
DOI: 10.1002/pmj.21412     Document Type: Article
Times cited : (60)

References (68)
  • 2
    • 78049481198 scopus 로고    scopus 로고
    • A project lifecycle perspective on stakeholder influence strategies in global projects
    • Aaltonen, K., &, Kujala, J., (2010). A project lifecycle perspective on stakeholder influence strategies in global projects. Scandinavian Journal of Management, 26 (4), 381-397.
    • (2010) Scandinavian Journal of Management , vol.26 , Issue.4 , pp. 381-397
    • Aaltonen, K.1    Kujala, J.2
  • 3
    • 59649090896 scopus 로고    scopus 로고
    • Response strategies to stakeholder pressures in global projects
    • Aaltonen, K., &, Sivonen, R., (2009). Response strategies to stakeholder pressures in global projects. International Journal of Project Management, 27, 131-141.
    • (2009) International Journal of Project Management , vol.27 , pp. 131-141
    • Aaltonen, K.1    Sivonen, R.2
  • 4
    • 52749099844 scopus 로고    scopus 로고
    • Investigating the use of the stakeholder notion in project management literature, a meta-analysis
    • Achterkamp, M. C., &, Vos, J. F., (2008). Investigating the use of the stakeholder notion in project management literature, a meta-analysis. International Journal of Project Management, 26 (7), 749-757.
    • (2008) International Journal of Project Management , vol.26 , Issue.7 , pp. 749-757
    • Achterkamp, M.C.1    Vos, J.F.2
  • 5
    • 0033247294 scopus 로고    scopus 로고
    • Who matters to CEOs? An investigation into stakeholder attributes and salience, corporate performance and CEO values
    • Agle, B. R., Mitchell, R. K., &, Sonnenfield, J. A., (1999). Who matters to CEOs? An investigation into stakeholder attributes and salience, corporate performance and CEO values. Academy of Management Journal, 42 (5), 507-525.
    • (1999) Academy of Management Journal , vol.42 , Issue.5 , pp. 507-525
    • Agle, B.R.1    Mitchell, R.K.2    Sonnenfield, J.A.3
  • 6
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factors influencing project cost estimating practice
    • Akintoye, A., (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, 77-89.
    • (2000) Construction Management and Economics , vol.18 , pp. 77-89
    • Akintoye, A.1
  • 7
    • 84871425377 scopus 로고    scopus 로고
    • Establishing project portfolio management: An exploratory analysis of the influence of internal stakeholders' interactions
    • Beringer, C., Jonas, D., &, Georg Gemünden, H., (2012). Establishing project portfolio management: An exploratory analysis of the influence of internal stakeholders' interactions. Project Management Journal, 43 (6), 16-32.
    • (2012) Project Management Journal , vol.43 , Issue.6 , pp. 16-32
    • Beringer, C.1    Jonas, D.2    Georg Gemünden, H.3
  • 8
    • 84878732827 scopus 로고    scopus 로고
    • Behavior of internal stakeholders in project portfolio management and its impact on success
    • Beringer, C., Jonas, D., &, Kock, A., (2013). Behavior of internal stakeholders in project portfolio management and its impact on success. International Journal of Project Management, 31, 830-846.
    • (2013) International Journal of Project Management , vol.31 , pp. 830-846
    • Beringer, C.1    Jonas, D.2    Kock, A.3
  • 10
    • 0347477599 scopus 로고
    • A typology of social power
    • In A. Kakabadre & C. Parker (Eds.), London, England: John Wiley.
    • Cavanaugh, M., (1984). A typology of social power. In, A. Kakabadre, &, C. Parker, (Eds.), Power, politics and organisations. London, England: John Wiley.
    • (1984) Power, Politics and Organisations
    • Cavanaugh, M.1
  • 12
    • 46049118798 scopus 로고    scopus 로고
    • Practical approaches for engaging stakeholders: Findings from the UK
    • DOI 10.1080/01446190802078310, PII 794114813, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Chinyio, E. A., &, Akintoye, A., (2008). Practical approaches for engaging stakeholders: Findings from the UK. Construction Management and Economics, 26 (6), 591-599. (Pubitemid 351895202)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 591-599
    • Chinyio, E.A.1    Akintoye, A.2
  • 14
    • 0040881732 scopus 로고
    • A risk based model of stakeholder theory
    • In. Centre for Corporate Social Performance & Ethics, University of Toronto.
    • Clarkson, M., (1994). A risk based model of stakeholder theory. In Proceedings of the second Toronto conference on stakeholder theory (pp. 18-19). Centre for Corporate Social Performance & Ethics, University of Toronto.
    • (1994) Proceedings of the Second Toronto Conference on Stakeholder Theory , pp. 18-19
    • Clarkson, M.1
  • 15
    • 84890221721 scopus 로고    scopus 로고
    • Different stakeholder groups and their perceptions of project success
    • Davis, K., (2013). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32 (2), 189-201.
    • (2013) International Journal of Project Management , vol.32 , Issue.2 , pp. 189-201
    • Davis, K.1
  • 16
    • 0009183107 scopus 로고
    • The concept of power
    • Dahl, R. A., (1957). The concept of power. Behavioural Science, 2, 201-215.
    • (1957) Behavioural Science , vol.2 , pp. 201-215
    • Dahl, R.A.1
  • 17
    • 0034972602 scopus 로고    scopus 로고
    • Stakeholder management for conservation projects: A case study of Ream National Park, Cambodia
    • DOI 10.1007/s002670010206
    • De Lopez, T. T., (2001). Stakeholder management for conservation projects: A case study of Ream National Park, Cambodia. Environmental Management, 28 (1), 47-60. (Pubitemid 32565561)
    • (2001) Environmental Management , vol.28 , Issue.1 , pp. 47-60
    • De Lopez, T.T.1
  • 18
  • 19
    • 84881076235 scopus 로고    scopus 로고
    • Synthesizing and extending resource dependence theory: A meta-analysis
    • Drees, J. M., &, Heugens, P. P., (2013). Synthesizing and extending resource dependence theory: A meta-analysis. Journal of Management, 39 (6), 1666-1698.
    • (2013) Journal of Management , vol.39 , Issue.6 , pp. 1666-1698
    • Drees, J.M.1    Heugens, P.P.2
  • 20
    • 4043141452 scopus 로고    scopus 로고
    • The primordial stakeholder: Advancing the conceptual consideration of stakeholder status for the natural environment
    • DOI 10.1023/B:BUSI.0000013852.62017.0e
    • Driscoll, C., &, Starik, M., (2004). The primordial stakeholder: Advancing the conceptual consideration of stakeholder status for the natural environment. Journal of Business Ethics, 49, 55-73. (Pubitemid 39063757)
    • (2004) Journal of Business Ethics , vol.49 , Issue.1 , pp. 55-73
    • Driscoll, C.1    Starik, M.2
  • 21
    • 0035994938 scopus 로고    scopus 로고
    • Stakeholder analysis for R&D project management
    • Elias, A. A., Cavana, R. Y., &, Jackson, L. S., (2002). Stakeholder analysis for R&D project management. R&D Management, 34 (2), 301-310.
    • (2002) R&D Management , vol.34 , Issue.2 , pp. 301-310
    • Elias, A.A.1    Cavana, R.Y.2    Jackson, L.S.3
  • 22
    • 84921311701 scopus 로고
    • Englewood Cliffs, NJ: Prentice-Hall.
    • Etzioni, A., (1964). Modern organizations, Englewood Cliffs, NJ: Prentice-Hall.
    • (1964) Modern Organizations
    • Etzioni, A.1
  • 25
    • 0000605608 scopus 로고
    • Corporate governance: A stakeholder interpretation
    • Freeman, R. E., &, Evan, W. M., (1990). Corporate governance: A stakeholder interpretation. Journal of Behavioral Economics, 19 (4), 337-359.
    • (1990) Journal of Behavioral Economics , vol.19 , Issue.4 , pp. 337-359
    • Freeman, R.E.1    Evan, W.M.2
  • 26
    • 84968259983 scopus 로고
    • Stockholders and stakeholders: A new perspective on corporate governance
    • Freeman, R. E., &, Reed, D. L., (1983). Stockholders and stakeholders: A new perspective on corporate governance. California Management Review, 25 (3), 93-94.
    • (1983) California Management Review , vol.25 , Issue.3 , pp. 93-94
    • Freeman, R.E.1    Reed, D.L.2
  • 27
    • 0033241672 scopus 로고    scopus 로고
    • Stakeholder influence strategies
    • Frooman, J., (1999). Stakeholder influence strategies. The Academy of Management Review, 24 (2), 191-205.
    • (1999) The Academy of Management Review , vol.24 , Issue.2 , pp. 191-205
    • Frooman, J.1
  • 28
  • 29
    • 0036983703 scopus 로고    scopus 로고
    • Project stakeholder management
    • Karlsen, J. T., (2002). Project stakeholder management. Engineering Management Journal, 14 (4), 19-24.
    • (2002) Engineering Management Journal , vol.14 , Issue.4 , pp. 19-24
    • Karlsen, J.T.1
  • 30
    • 0030509373 scopus 로고    scopus 로고
    • Economic 'short-termism:' the debate, the unresolved issues, and the implications for management practice
    • Lavetty, K. J., (1996). Economic 'short-termism:' The debate, the unresolved issues, and the implications for management practice. The Academy of Management Review, 21 (3), 825-860.
    • (1996) The Academy of Management Review , vol.21 , Issue.3 , pp. 825-860
    • Lavetty, K.J.1
  • 31
    • 17844410941 scopus 로고    scopus 로고
    • Formulating strategies for stakeholder management: A case-based reasoning approach
    • DOI 10.1016/j.eswa.2004.12.038, PII S0957417404001861
    • Lim, G., Ahn, H., &, Lee, H., (2005). Formulating strategies for stakeholder management: A case-based reasoning approach. Expert Systems with Applications, 28, 831-840. (Pubitemid 40583860)
    • (2005) Expert Systems with Applications , vol.28 , Issue.4 , pp. 831-840
    • Lim, G.1    Ahn, H.2    Lee, H.3
  • 32
    • 78650207645 scopus 로고    scopus 로고
    • Twenty-five years of stakeholder theory in project management literature (1984-2009)
    • Littau, P., Jujagiri, N. J., &, Adlbrecht, G., (2010). Twenty-five years of stakeholder theory in project management literature (1984-2009). Project Management Journal, 41 (4), 17-29.
    • (2010) Project Management Journal , vol.41 , Issue.4 , pp. 17-29
    • Littau, P.1    Jujagiri, N.J.2    Adlbrecht, G.3
  • 34
    • 0031529953 scopus 로고    scopus 로고
    • Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts
    • Mitchell, R. K., Agle, B. R., &, Wood, D. J., (1997). Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Academy of Management Review, 22 (4), 853-887.
    • (1997) Academy of Management Review , vol.22 , Issue.4 , pp. 853-887
    • Mitchell, R.K.1    Agle, B.R.2    Wood, D.J.3
  • 35
    • 84901824405 scopus 로고    scopus 로고
    • Project management and stakeholder analysis: An ethical approach for infrastructure development projects
    • Munteanu, V., Gligor, D., &, Bizoi, G., (2007). Project management and stakeholder analysis: An ethical approach for infrastructure development projects. Review of International Comparative Management, 8 (4), 119-139.
    • (2007) Review of International Comparative Management , vol.8 , Issue.4 , pp. 119-139
    • Munteanu, V.1    Gligor, D.2    Bizoi, G.3
  • 37
    • 73349130385 scopus 로고    scopus 로고
    • From client to project stakeholders: A stakeholder mapping approach
    • Newcombe, R., (2003). From client to project stakeholders: A stakeholder mapping approach. Construction Management and Economics, 22 (9/10), 762-784.
    • (2003) Construction Management and Economics , vol.22 , Issue.910 , pp. 762-784
    • Newcombe, R.1
  • 38
    • 77449108025 scopus 로고    scopus 로고
    • Stakeholder impact analysis of infrastructure project management in developing countries: A study of perception of project managers in state owned engineering firms in Vietnam
    • Nguyen, N. H., Skitmore, M., &, Wong, J. K. W., (2009). Stakeholder impact analysis of infrastructure project management in developing countries: A study of perception of project managers in state owned engineering firms in Vietnam. Construction Management and Economics, 27 (11), 1129-1140.
    • (2009) Construction Management and Economics , vol.27 , Issue.11 , pp. 1129-1140
    • Nguyen, N.H.1    Skitmore, M.2    Wong, J.K.W.3
  • 39
    • 34047161918 scopus 로고    scopus 로고
    • Stakeholder impact analysis in construction project management
    • DOI 10.1080/01446190600879125, PII 775676045
    • Olander, S., (2007). Stakeholder impact analysis in construction project management. Construction Management and Economics, 25 (3), 277-287. (Pubitemid 46510936)
    • (2007) Construction Management and Economics , vol.25 , Issue.3 , pp. 277-287
    • Olander, S.1
  • 41
    • 34548203791 scopus 로고    scopus 로고
    • A case study of stakeholder identification and prioritization by managers
    • Parent, M. M., &, Deephouse, D. L., (2007). A case study of stakeholder identification and prioritization by managers. Journal of Business Ethics, 75, 1-23.
    • (2007) Journal of Business Ethics , vol.75 , pp. 1-23
    • Parent, M.M.1    Deephouse, D.L.2
  • 42
    • 84990342723 scopus 로고    scopus 로고
    • Knowledge management and human resources development: An application in social network analysis methods
    • Parise, S., (2007). Knowledge management and human resources development: An application in social network analysis methods. Advances in Developing Human Resources, 9, 359-383.
    • (2007) Advances in Developing Human Resources , vol.9 , pp. 359-383
    • Parise, S.1
  • 43
    • 0037214743 scopus 로고    scopus 로고
    • Stakeholder legitimacy
    • Phillips, R., (2003). Stakeholder legitimacy. Business Ethics Quarterly, 13 (1), 25-41. (Pubitemid 36289093)
    • (2003) Business Ethics Quarterly , vol.13 , Issue.1 , pp. 25-41
    • Phillips, R.1
  • 45
    • 84855983657 scopus 로고    scopus 로고
    • Project Management Institute. Fourth edition. Newtown Square, PA: Author.
    • ® guide)-Fourth edition. Newtown Square, PA: Author.
    • (2008) ® Guide)
  • 46
    • 25844518711 scopus 로고    scopus 로고
    • An empirical examination of the stakeholder strategy matrix
    • DOI 10.1108/03090560510610806
    • Polonsky, M. J., &, Scott, D., (2005). An empirical examination of the stakeholder strategy matrix. European Journal of Marketing, 39 (9/10), 1199-1215. (Pubitemid 41392761)
    • (2005) European Journal of Marketing , vol.39 , Issue.9-10 , pp. 1199-1215
    • Polonsky, M.J.1    Scott, D.2
  • 47
    • 78049517228 scopus 로고    scopus 로고
    • Projects as networks of relationships
    • In Pryke S. and Smyth, H. (Eds.), Oxford, England: Blackwell
    • Pryke, S. D., (2006). Projects as networks of relationships. In, Pryke S., and, Smyth, H., (Eds.), The management of complex projects: A relationship approach. Oxford, England: Blackwell, pp. 213-235.
    • (2006) The Management of Complex Projects: A Relationship Approach , pp. 213-235
    • Pryke, S.D.1
  • 48
    • 46049110518 scopus 로고    scopus 로고
    • Stakeholder management through empowerment: Modelling project success
    • DOI 10.1080/01446190802071182, PII 794114011, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Rowlinson, S., &, Cheung, Y. K. F., (2008). Stakeholder management through empowerment: Modeling project success. Construction Management and Economics, 26 (6), 611-623. (Pubitemid 351895204)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 611-623
    • Rowlinson, S.1    Cheung, Y.K.F.2
  • 49
    • 0031488230 scopus 로고    scopus 로고
    • Moving beyond dyadic ties: A network theory of stakeholder influences
    • Rowley, T. J., (1997). Moving beyond dyadic ties: A network theory of stakeholder influences. Academy of Management Review, 22 (4), 887-910.
    • (1997) Academy of Management Review , vol.22 , Issue.4 , pp. 887-910
    • Rowley, T.J.1
  • 50
    • 81755187185 scopus 로고    scopus 로고
    • Governmental stakeholder and project owner's views on the regulative framework in nuclear projects
    • Sallinen, L., Ahola, T., &, Ruuska, I., (2011). Governmental stakeholder and project owner's views on the regulative framework in nuclear projects. Project Management Journal, 42 (6), 33-47.
    • (2011) Project Management Journal , vol.42 , Issue.6 , pp. 33-47
    • Sallinen, L.1    Ahola, T.2    Ruuska, I.3
  • 56
    • 33747347789 scopus 로고    scopus 로고
    • Contractor selection criteria: Investigation of opinions of Singapore construction practitioners
    • Singh, D., &, Tiong, R. L. K., (2006). Contractor selection criteria: Investigation of opinions of Singapore construction practitioners. Journal of Construction Engineering and Management, 132 (9), 998-1008.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.9 , pp. 998-1008
    • Singh, D.1    Tiong, R.L.K.2
  • 58
    • 21844442887 scopus 로고
    • Managing legitimacy: Strategic and institutional approaches
    • Suchman, M. C., (1995). Managing legitimacy: Strategic and institutional approaches, Academy of Management Review, 20 (3), 571-610.
    • (1995) Academy of Management Review , vol.20 , Issue.3 , pp. 571-610
    • Suchman, M.C.1
  • 59
    • 46049120022 scopus 로고    scopus 로고
    • Influence, stakeholder mapping and visualization
    • DOI 10.1080/01446190701882390, PII 794114348, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Walker, D. H. T., &, Bourne, L., (2008). Influence, stakeholder mapping and visualization. Construction Management and Economics, 26 (6), 645-658. (Pubitemid 351895207)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 645-658
    • Walker, D.H.T.1    Bourne, L.M.2    Shelley, A.3
  • 60
    • 33645469332 scopus 로고    scopus 로고
    • The relationships between key stakeholders' project performance and project success: Perceptions of Chinese construction supervising engineers
    • Wang, X., &, Huang, J., (2006). The relationships between key stakeholders' project performance and project success: Perceptions of Chinese construction supervising engineers. International Journal of Project Management, 24 (3): 253-260.
    • (2006) International Journal of Project Management , vol.24 , Issue.3 , pp. 253-260
    • Wang, X.1    Huang, J.2
  • 62
    • 0345219936 scopus 로고    scopus 로고
    • How to motivate all stakeholders to work together
    • In D. I. Cleland (Ed.), (2nd ed.,). Hoboken, NJ: Wiley.
    • Wideman, R. M., (2004). How to motivate all stakeholders to work together. In, D. I. Cleland, (Ed.), Field guide to management (2nd ed., pp. 288-304). Hoboken, NJ: Wiley.
    • (2004) Field Guide to Management , pp. 288-304
    • Wideman, R.M.1
  • 63
    • 18144415556 scopus 로고    scopus 로고
    • Project stakeholder mapping: Analysing the interests of project stakeholders, (chapter 23)
    • In, Newtown Square, PA: Project Management Institute
    • Winch, G., &, Bonke, S., (2002). Project stakeholder mapping: Analysing the interests of project stakeholders, (chapter 23). In The frontiers of project management research, Newtown Square, PA: Project Management Institute, pp. 385-402.
    • (2002) The Frontiers of Project Management Research , pp. 385-402
    • Winch, G.1    Bonke, S.2
  • 65
    • 73349127154 scopus 로고    scopus 로고
    • Exploring critical success factors for stakeholder management in construction projects
    • Yang, J., Shen, G. Q., Ho, M., Drew, D. S., &, Chan, A. P., (2009). Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, 15 (4), 337-348.
    • (2009) Journal of Civil Engineering and Management , vol.15 , Issue.4 , pp. 337-348
    • Yang, J.1    Shen, G.Q.2    Ho, M.3    Drew, D.S.4    Chan, A.P.5
  • 66
    • 80051901132 scopus 로고    scopus 로고
    • Stakeholder management in construction: An empirical study to address research gaps in previous studies
    • Yang, J., Shen, G. Q., Ho, M., Drew, D. S., &, Xue, X., (2011). Stakeholder management in construction: An empirical study to address research gaps in previous studies. International Journal of Project Management, 29 (7), 900-910.
    • (2011) International Journal of Project Management , vol.29 , Issue.7 , pp. 900-910
    • Yang, J.1    Shen, G.Q.2    Ho, M.3    Drew, D.S.4    Xue, X.5
  • 67
    • 84877920190 scopus 로고    scopus 로고
    • Understanding the value of project management from a stakeholder's perspective: Case study of mega-project management
    • Zhai, L., Xin, Y., &, Cheng, C., (2009). Understanding the value of project management from a stakeholder's perspective: Case study of mega-project management. Project Management Journal, 40 (1), 99-109.
    • (2009) Project Management Journal , vol.40 , Issue.1 , pp. 99-109
    • Zhai, L.1    Xin, Y.2    Cheng, C.3
  • 68
    • 84874372648 scopus 로고    scopus 로고
    • Improving performance of construction projects: A project manager's emotional intelligence approach
    • Zhang, L., &, Fan, W., (2013). Improving performance of construction projects: A project manager's emotional intelligence approach. Engineering, Construction and Architectural Management, 20 (2), 195-207.
    • (2013) Engineering, Construction and Architectural Management , vol.20 , Issue.2 , pp. 195-207
    • Zhang, L.1    Fan, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.