2
-
-
59649090896
-
Response strategies to stakeholder pressures in global projects
-
doi: 10.1016/j.ijproman.2008.09.007
-
Aaltonen, K.; Sivonen, R. 2009. Response strategies to stakeholder pressures in global projects, International Journal of Project Management 27: 131-141. doi: 10.1016/j.ijproman.2008.09.007.
-
(2009)
International Journal of Project Management
, vol.27
, pp. 131-141
-
-
Aaltonen, K.1
Sivonen, R.2
-
3
-
-
0030548814
-
Development and validation of TQM implementation constructs
-
doi: 10.1111/j.1540-5915.1996.tb00842.x
-
Ahire, S. L.; Golhar, D. Y.; Walker, M. A. 1996. Development and validation of TQM implementation constructs, Decision Sciences 27(1): 23-56. doi: 10.1111/j.1540-5915.1996.tb00842.x.
-
(1996)
Decision Sciences
, vol.27
, Issue.1
, pp. 23-56
-
-
Ahire, S.L.1
Golhar, D.Y.2
Walker, M.A.3
-
4
-
-
2242459831
-
Analysis of factors influencing project cost estimating practice
-
doi: 10.1080/014461900370979
-
Akintoye, A. 2000. Analysis of factors influencing project cost estimating practice, Construction Management and Economics 18: 77-89. doi: 10.1080/014461900370979.
-
(2000)
Construction Management and Economics
, vol.18
, pp. 77-89
-
-
Akintoye, A.1
-
5
-
-
42949084772
-
Critical success factors influencing safety program performance in Thai construction projects
-
DOI 10.1016/j.ssci.2007.06.006, PII S0925753507001026
-
Aksorn, T.; Hadikusumo, B. H. W. 2008. Critical success factors influencing safety program performance in Thai construction projects, Safety Science 46: 709-727. doi: 10.1016/j.ssci.2007.06.006. (Pubitemid 351609378)
-
(2008)
Safety Science
, vol.46
, Issue.4
, pp. 709-727
-
-
Aksorn, T.1
Hadikusumo, B.H.W.2
-
6
-
-
40549140841
-
Different stakeholder perceptions of sustainability assessment
-
AlWaer, H.; Sibley, M.; Lewis, J. 2008. Different stakeholder perceptions of sustainability assessment, Architectural Science Review 57(1): 48-59.
-
(2008)
Architectural Science Review
, vol.57
, Issue.1
, pp. 48-59
-
-
AlWaer, H.1
Sibley, M.2
Lewis, J.3
-
7
-
-
18844458339
-
Critical success factors of TQM implementation in Hong Kong industries
-
doi: 10.1108/02656710210427520
-
Antony, J.; Leung, K.; Knowles, G.; Gosh, S. 2002. Critical success factors of TQM implementation in Hong Kong industries, International Journal of Quality & Reliability Management 19(5): 551-566. doi: 10.1108/ 02656710210427520.
-
(2002)
International Journal of Quality & Reliability Management
, vol.19
, Issue.5
, pp. 551-566
-
-
Antony, J.1
Leung, K.2
Knowles, G.3
Gosh, S.4
-
8
-
-
0035314094
-
Conflict dissolution in the public sector: A case-study
-
DOI 10.1016/S0377-2217(00)00037-0
-
Bana e Costa, C. A.; Nunes da Silva, F.; Vansnick, J. C. 2001. Conflict dissolution in the public sector: A case-study, European Journal of Operational Research 130: 388-401. doi: 10.1016/S0377-2217(00)00037-0. (Pubitemid 32195798)
-
(2001)
European Journal of Operational Research
, vol.130
, Issue.2
, pp. 388-401
-
-
Bana E Costa, C.A.1
Nunes Da Silva, F.2
Vansnick, J.-C.3
-
9
-
-
0000697225
-
A note on the multiplying factors for various chi square approximations
-
Bartlett, M. S. 1954. A note on the multiplying factors for various chi square approximations, Journal of the Royal Statistical Society 16(Series B): 396-398.
-
(1954)
Journal of the Royal Statistical Society
, vol.16
, Issue.SERIES B
, pp. 396-398
-
-
Bartlett, M.S.1
-
10
-
-
0040834517
-
Identification of the critical factors of TQM
-
doi: 10.1111/j.1540-5915.1996.tb00841.x
-
Black, S. A.; Porter, L. J. 1996. Identification of the Critical Factors of TQM, Decision Sciences 27(1): 1-21. doi: 10.1111/j.1540-5915.1996.tb00841.x.
-
(1996)
Decision Sciences
, vol.27
, Issue.1
, pp. 1-21
-
-
Black, S.A.1
Porter, L.J.2
-
12
-
-
20444441536
-
Visualising and mapping stakeholder influence
-
DOI 10.1108/00251740510597680
-
Bourne, L.; Walker, D. H. T. 2005. Visualising and mapping stakeholder influence, Management Decision 43(5): 649-660. doi: 10.1108/00251740510597680. (Pubitemid 40815173)
-
(2005)
Management Decision
, vol.43
, Issue.5
, pp. 649-660
-
-
Bourne, L.1
Walker, D.H.T.2
-
13
-
-
46049104799
-
Visualizing stakeholder influence - Two Australian examples
-
Bourne, L.; Walker, D. H. T. 2006. Visualizing stakeholder influence - two Australian examples, Project Management Journal 37(1): 5-22.
-
(2006)
Project Management Journal
, vol.37
, Issue.1
, pp. 5-22
-
-
Bourne, L.1
Walker, D.H.T.2
-
15
-
-
0000758307
-
A three-dimensional conceptual model of corporate social performance
-
doi: 10.2307/257850
-
Carroll, A. B. 1979. A three-dimensional conceptual model of corporate social performance, Academy of Management Review 4(4): 497-506. doi: 10.2307/257850.
-
(1979)
Academy of Management Review
, vol.4
, Issue.4
, pp. 497-506
-
-
Carroll, A.B.1
-
16
-
-
44949275678
-
The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders
-
doi: 10.1016/0007-6813(91)90005-G
-
Carroll, A. B. 1991. The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders, Business Horizons 7: 39-48. doi: 10.1016/0007-6813(91)90005-G.
-
(1991)
Business Horizons
, vol.7
, pp. 39-48
-
-
Carroll, A.B.1
-
17
-
-
0042155411
-
An empirical study of the benefits of construction partnering in Hong Kong
-
DOI 10.1080/0144619032000056162
-
Chan, P. C.; Chan, W. M.; Ho, S. K. 2003. An empirical study of the benefits of construction parting in Hong Kong, Construction Management and Economics 21: 523-533. doi: 10.1080/0144619032000056162. (Pubitemid 36971546)
-
(2003)
Construction Management and Economics
, vol.21
, Issue.5
, pp. 523-533
-
-
Chan, A.P.C.1
Chan, D.W.M.2
Ho, K.S.K.3
-
18
-
-
13944264358
-
Exploring critical success factors for partnering in construction projects
-
March/April: . doi: 10.1061/(ASCE)0733-9364(2004)130: 2(188)
-
Chan, P. C. A.; Chan, W. M. D.; Chiang, Y. H.; Tang, B. S.; Chan, H. W. E.; Ho, S. K. K. 2004. Exploring critical success factors for partnering in construction projects, Journal of Construction Engineering and Management March/April: 188-198. doi: 10.1061/(ASCE)0733-9364(2004)130: 2(188).
-
(2004)
Journal of Construction Engineering and Management
, pp. 188-198
-
-
Chan, P.C.A.1
Chan, W.M.D.2
Chiang, Y.H.3
Tang, B.S.4
Chan, H.W.E.5
Ho, S.K.K.6
-
19
-
-
0035280018
-
Design and build project success factors: Multivariate analysis
-
March/April:, doi: 10.1061/(ASCE)0733-9364(2001)127: 2(93)
-
Chan, P. C. A.; Ho, C. K. D.; Tam, C. M. 2001. Design and build project success factors: multivariate analysis, Journal of Construction Engineering and Management March/April: 93-100. doi: 10.1061/(ASCE)0733-9364(2001)127: 2(93).
-
(2001)
Journal of Construction Engineering and Management
, pp. 93-100
-
-
Chan, P.C.A.1
Ho, C.K.D.2
Tam, C.M.3
-
20
-
-
0013143897
-
Project stakeholder management
-
Cleland, D. I. 1986. Project stakeholder management, Project Management Journal 17(4): 36-44.
-
(1986)
Project Management Journal
, vol.17
, Issue.4
, pp. 36-44
-
-
Cleland, D.I.1
-
21
-
-
0001832041
-
Leadership and the project management body of knowledge
-
doi: 10.1016/0263-7863(94)00018-8
-
Cleland, D. I. 1995. Leadership and the project management body of knowledge, International Journal of Project Management 13(2): 82-88. doi: 10.1016/0263-7863(94)00018-8.
-
(1995)
International Journal of Project Management
, vol.13
, Issue.2
, pp. 82-88
-
-
Cleland, D.I.1
-
24
-
-
56949101729
-
Stakeholder behavior and legislative influence: A case study of recreational water rights in Colorado
-
Nov.
-
Crow, D. A. 2008. Stakeholder behavior and legislative influence: A case study of recreational water rights in Colorado, The Social Science Journal Nov. (20): 1-13.
-
(2008)
The Social Science Journal
, vol.20
, pp. 1-13
-
-
Crow, D.A.1
-
25
-
-
0033995724
-
Soft systems approaches for analyzing proposed change and stakeholder response - A case study
-
doi: 10.1080/02630259908970271
-
Dias, W. P. S. 1999. Soft systems approaches for analyzing proposed change and stakeholder response - a case study, Civil Engineering and Environmental Systems 17(1): 1-17. doi: 10.1080/02630259908970271.
-
(1999)
Civil Engineering and Environmental Systems
, vol.17
, Issue.1
, pp. 1-17
-
-
Dias, W.P.S.1
-
26
-
-
21844463321
-
The stakeholder theory of the corporation: Concepts, evidence, and implications
-
doi: 10.2307/258887
-
Donaldson, T.; Preston, L. E. 1995. The stakeholder theory of the corporation: concepts, evidence, and implications, The Academy of Management Review 20(1): 65-88. doi: 10.2307/258887.
-
(1995)
The Academy of Management Review
, vol.20
, Issue.1
, pp. 65-88
-
-
Donaldson, T.1
Preston, L.E.2
-
27
-
-
33748475041
-
Stakeholder management for public private partnerships
-
DOI 10.1016/j.ijproman.2006.07.009, PII S0263786306000949
-
El-Gohary, N. M.; Osman, H.; Ei-Diraby, T. E. 2006. Stakeholder management for public private partnerships, International Journal of Project Management 24(7): 595-604. doi: 10.1016/j.ijproman.2006.07.009. (Pubitemid 44350059)
-
(2006)
International Journal of Project Management
, vol.24
, Issue.7
, pp. 595-604
-
-
El-Gohary, N.M.1
Osman, H.2
El-Diraby, T.E.3
-
28
-
-
33750376514
-
Strategies for assessing and managing stakeholders in the egyptian construction industry
-
El-Sawah, H. M. 2006. Strategies for assessing and managing stakeholders in the Egyptian construction industry, Journal of Engineering and Applied Science 53(2): 195-213.
-
(2006)
Journal of Engineering and Applied Science
, vol.53
, Issue.2
, pp. 195-213
-
-
El-Sawah, H.M.1
-
29
-
-
0035994938
-
Stakeholder analysis for R&D project management
-
doi: 10.1111/1467-9310.00262
-
Elias, A. A.; Cavana, R. Y.; Jackson, L. S. 2002. Stakeholder analysis for R&D project management, R&D Management 34 (2): 301-310. doi: 10.1111/1467-9310.00262.
-
(2002)
R&D Management
, vol.34
, Issue.2
, pp. 301-310
-
-
Elias, A.A.1
Cavana, R.Y.2
Jackson, L.S.3
-
31
-
-
84902732816
-
-
Louis Stern Memorial Fund, US
-
Freeman, R. E.; Harrison, J. S.; Wicks, A. C. 2007. Managing for Stakeholders - Survival, Reputation, and Success. Louis Stern Memorial Fund, US.
-
(2007)
Managing for Stakeholders - Survival, Reputation, and Success
-
-
Freeman, R.E.1
Harrison, J.S.2
Wicks, A.C.3
-
32
-
-
0033241672
-
Stakeholder influence strategies
-
doi: 10.2307/259074
-
Frooman, J. 1999. Stakeholder influence strategies, Academy of Management Review 24(2): 191-205. doi: 10.2307/259074.
-
(1999)
Academy of Management Review
, vol.24
, Issue.2
, pp. 191-205
-
-
Frooman, J.1
-
33
-
-
3843102504
-
An empirical study of the ISO 9000 standards' contribution towards total quality management
-
DOI 10.1108/EUM0000000005972
-
Gotzamani, K. D.; Tsiotras, G. D. 2001. An empirical study of the ISO 9000 standards' contribution towards total quality management, International Journal of Operations & Pro-duction Management 21(10): 1326-1342. doi: 10.1108/EUM0000000005972. (Pubitemid 39046801)
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.10
, pp. 1326-1342
-
-
Gotzamani, K.D.1
Tsiotras, G.D.2
-
34
-
-
67349273629
-
The role of trust in project management
-
D. P. Sle-vin, D. I. Cleland and J. K.Pinto. Newtown Square, Pennsylvania, PMI
-
Hartmann, F. T. 2002. The role of trust in project management, in Frontiers of Project Management Research. D. P. Sle-vin, D. I. Cleland and J. K.Pinto. Newtown Square, Pennsylvania, PMI, 225-235.
-
(2002)
Frontiers of Project Management Research
, pp. 225-235
-
-
Hartmann, F.T.1
-
35
-
-
84993047123
-
Critical success factors of the BOOT procurement system: Reflection from the stadium Australia case study, engineering
-
doi: 10.1046/j.1365-232X.2002.00249.x
-
Jefferies, M.; Gameson, R.; Rowlinson, S. 2002. Critical success factors of the BOOT procurement system: reflection from the Stadium Australia case study, Engineering, Construction and Architectural Management 9(4): 352-361. doi: 10.1046/j.1365-232X.2002.00249.x.
-
(2002)
Construction and Architectural Management
, vol.9
, Issue.4
, pp. 352-361
-
-
Jefferies, M.1
Gameson, R.2
Rowlinson, S.3
-
36
-
-
73349095668
-
Stakeholder analysis in projects: Challenges in using current guidelines in the real world
-
Jepsen, A. L.; Eskerod, P. 2008. Stakeholder analysis in projects: Challenges in using current guidelines in the real world, International Journal of Project Management 4(2): 1-9.
-
(2008)
International Journal of Project Management
, vol.4
, Issue.2
, pp. 1-9
-
-
Jepsen, A.L.1
Eskerod, P.2
-
37
-
-
4243539704
-
Stakeholder management on construction projects
-
Jergeas, G. F.; Williamson, E.; Skulmoski, G. J.; Thomas, J. L. 2000. Stakeholder management on construction projects, AACE International Transactions 12: 1-5.
-
(2000)
AACE International Transactions
, vol.12
, pp. 1-5
-
-
Jergeas, G.F.1
Williamson, E.2
Skulmoski, G.J.3
Thomas, J.L.4
-
38
-
-
34250493668
-
A second generation little jiffy
-
doi: 10.1007/BF02291817
-
Kaiser, H. 1970. A second generation little jiffy, Psychometrika 35: 401-415. doi: 10.1007/BF02291817.
-
(1970)
Psychometrika
, vol.35
, pp. 401-415
-
-
Kaiser, H.1
-
39
-
-
0036983703
-
Project stakeholder management
-
Karlsen, J. T. 2002. Project stakeholder management, Engineering Management Journal 14(4): 19-24.
-
(2002)
Engineering Management Journal
, vol.14
, Issue.4
, pp. 19-24
-
-
Karlsen, J.T.1
-
40
-
-
49249085266
-
Building trust in project-stakeholder relationships
-
doi: 10.1108/17465260810844239
-
Karlsen, J. T.; Græe, K.; Massaoud, M. J. 2008. Building trust in project-stakeholder relationships, Baltic Journal of Management 3(1): 7. doi: 10.1108/17465260810844239.
-
(2008)
Baltic Journal of Management
, vol.3
, Issue.1
, pp. 7
-
-
Karlsen, J.T.1
Græe, K.2
Massaoud, M.J.3
-
43
-
-
18844379685
-
Is there a relationship between construction conflicts and participants' satisfaction?
-
doi: 10.1108/09699980510584494
-
Leung, M. Y.; Liu, A. M. M.; Thomas, N. S. 2005. Is there a relationship between construction conflicts and participants' satisfaction?, Engineering, Construction and Architectural Management 12(2): 149-167. doi: 10.1108/09699980510584494.
-
(2005)
Engineering, Construction and Architectural Management
, vol.12
, Issue.2
, pp. 149-167
-
-
Leung, M.Y.1
Liu, A.M.M.2
Thomas, N.S.3
-
44
-
-
22144480927
-
Critical success factors for PPP/PFI projects in the UK construction industry
-
DOI 10.1080/01446190500041537
-
Li, B.; Akintoye, A.; Edwards, P. J.; Hardcastle, C. 2005. Critical success factors for PPP/PFI projects in the UK construction industry, Construction Management and Economics 23: 459-471. doi: 10.1080/ 01446190500041537. (Pubitemid 40974445)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.5
, pp. 459-471
-
-
Li, B.1
Akintoye, A.2
Edwards, P.J.3
Hardcastle, C.4
-
45
-
-
41949091753
-
Managing project risks
-
Pry-ke, S. and Smyth, H. Blackwell, UK
-
Loosemore, M. 2006. Managing project risks, in The Management of Complex Projects: A Relationship Approach, Pry-ke, S. and Smyth, H. Blackwell, UK.
-
(2006)
The Management of Complex Projects: A Relationship Approach
-
-
Loosemore, M.1
-
46
-
-
2642525413
-
Industry-centric benchmarking of information technology benefits, costs, risks for small-to-medium sized enterprises in construction
-
doi: 10.1016/j.autcon.2004.02.002
-
Love, P. E. D.; Irani, Z.; Edwards, D. J. 2004. Industry-centric benchmarking of information technology benefits, costs, risks for small-to-medium sized enterprises in construction, Automation in Construction 13(4): 507-524. doi: 10.1016/j.autcon.2004.02.002.
-
(2004)
Automation in Construction
, vol.13
, Issue.4
, pp. 507-524
-
-
Love, P.E.D.1
Irani, Z.2
Edwards, D.J.3
-
47
-
-
0031529953
-
Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts
-
doi: 10.2307/259247
-
Mitchell, R. K.; Agle, B. R.; Wood, D. J. 1997. Toward a theory of stakeholder identification and salience: defining the principle of who and what really counts, Academy of Management Review 22(4): 853-887. doi: 10.2307/259247.
-
(1997)
Academy of Management Review
, vol.22
, Issue.4
, pp. 853-887
-
-
Mitchell, R.K.1
Agle, B.R.2
Wood, D.J.3
-
48
-
-
46049090973
-
Stakeholder matrix for ethical relationships in the construction industry
-
DOI 10.1080/01446190801965368, PII 794113094, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
-
Moodley, K.; Smith, N.; Preece, C. N. 2008. Stakeholder matrix for ethical relationships in the construction industry, Construction Management & Economics 26(6): 625-632. doi: 10.1080/01446190801965368. (Pubitemid 351895205)
-
(2008)
Construction Management and Economics
, vol.26
, Issue.6
, pp. 625-632
-
-
Moodley, K.1
Smith, N.2
Preece, C.N.3
-
49
-
-
73349130385
-
From client to project stakeholders: A stakeholder mapping approach
-
Newcombe, R. 2003. From client to project stakeholders: a stakeholder mapping approach, Construction Management and Economics 22(9/10): 762-784.
-
(2003)
Construction Management and Economics
, vol.22
, Issue.9-10
, pp. 762-784
-
-
Newcombe, R.1
-
53
-
-
34047161918
-
Stakeholder impact analysis in construction project management
-
DOI 10.1080/01446190600879125, PII 775676045
-
Olander, S. 2007. Stakeholder impact analysis in construction project management, Construction Management and Economics 25(3): 277-287. doi: 10.1080/01446190600879125. (Pubitemid 46510936)
-
(2007)
Construction Management and Economics
, vol.25
, Issue.3
, pp. 277-287
-
-
Olander, S.1
-
54
-
-
18144403769
-
Evaluation of stakeholder influence in the implementation of construction projects
-
DOI 10.1016/j.ijproman.2005.02.002, PII S0263786305000232
-
Olander, S.; Landin, A. 2005. Evaluation of stakeholder influence in the implementation of construction projects, International Journal of Project Management 23(4): 321. doi: 10.1016/j.ijproman.2005.02.002. (Pubitemid 40621265)
-
(2005)
International Journal of Project Management
, vol.23
, Issue.4
, pp. 321-328
-
-
Olander, S.1
Landin, A.2
-
55
-
-
46049095684
-
A comparative study of factors affecting the external stakeholder management process
-
DOI 10.1080/01446190701821810, PII 794112488, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
-
Olander, S., and Landin, A. 2008. A comparative study of factors affecting the external stakeholder management process, Construction Management and Economics 26(6): 553. doi: 10.1080/01446190701821810. (Pubitemid 351895199)
-
(2008)
Construction Management and Economics
, vol.26
, Issue.6
, pp. 553-561
-
-
Olander, S.1
Landin, A.2
-
56
-
-
0003982844
-
-
Open University Press, Buckingham and Philadephia
-
Pallant, J. 2001. SPSS Survival Manual. Open University Press, Buckingham and Philadephia.
-
(2001)
SPSS Survival Manual
-
-
Pallant, J.1
-
58
-
-
1142295369
-
-
The Project Management Institute, Jossey-bass Inc. San Francisco, California, U.S.A.
-
Pinto, J. K. 1998. Project Management Handbook. The Project Management Institute, Jossey-bass Inc., San Francisco, California, U.S.A.
-
(1998)
Project Management Handbook
-
-
Pinto, J.K.1
-
59
-
-
21744446475
-
Stakeholder identification in inter-organizational systems: Gaining insights for drug use
-
doi: 10.1057/palgrave.ejis.3000252
-
Pouloudi, A.; Whitley, E. A. 1997. Stakeholder identification in inter-organizational systems: gaining insights for drug use, European Journal of Information System 6(1): 1. doi: 10.1057/palgrave.ejis.3000252.
-
(1997)
European Journal of Information System
, vol.6
, Issue.1
, pp. 1
-
-
Pouloudi, A.1
Whitley, E.A.2
-
60
-
-
56249128566
-
Stakeholder involvement in agri-environmental policy making - Learning from a local and a state-level approach in Germany
-
doi: 10.1016/j.jenvman.2008.05.005
-
Prager, K.; Freese, J. 2009. Stakeholder involvement in agri-environmental policy making - Learning from a local and a state-level approach in Germany, Journal of Environmental Management 90(2): 1154-1167. doi: 10.1016/j.jenvman.2008.05.005.
-
(2009)
Journal of Environmental Management
, vol.90
, Issue.2
, pp. 1154-1167
-
-
Prager, K.1
Freese, J.2
-
61
-
-
21844445348
-
From imagination to realization: A legal foundation for stakeholder theory
-
doi: 10.1016/S1529-2096(02)04004-X
-
Radin, T. J. 2002. From imagination to realization: A legal foundation for stakeholder theory, Research in Ethical Issues in Organizations 4: 31-49. doi: 10.1016/S1529-2096(02)04004-X.
-
(2002)
Research in Ethical Issues in Organizations
, vol.4
, pp. 31-49
-
-
Radin, T.J.1
-
62
-
-
52049115626
-
Stakeholder participation for environmental management: A literature review
-
doi: 10.1016/j.biocon.2008.07.014
-
Reed, M. S. 2008. Stakeholder participation for environmental management: A literature review, Biological Conservation 141(10): 2417-2431. doi: 10.1016/j.biocon.2008.07.014.
-
(2008)
Biological Conservation
, vol.141
, Issue.10
, pp. 2417-2431
-
-
Reed, M.S.1
-
63
-
-
0018451997
-
Chief executives define their own data needs
-
Rockart, J. F. 1979. Chief executives define their own data needs, Harvard Business Review 57(2): 81-93.
-
(1979)
Harvard Business Review
, vol.57
, Issue.2
, pp. 81-93
-
-
Rockart, J.F.1
-
64
-
-
46049110518
-
Stakeholder management through empowerment: Modelling project success
-
DOI 10.1080/01446190802071182, PII 794114011, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
-
Rowlinson, S.; Cheung, Y. K. F. 2008. Stakeholder management through empowerment: modeling project success, Construction Management and Economics 26(6): 611. doi: 10.1080/01446190802071182. (Pubitemid 351895204)
-
(2008)
Construction Management and Economics
, vol.26
, Issue.6
, pp. 611-623
-
-
Rowlinson, S.1
Cheung, Y.K.F.2
-
65
-
-
84962968942
-
An instrument for measuring the critical factors of quality management
-
doi: 10.1111/j.1540-5915.1989.tb01421.x
-
Saraph, J. V.; Benson, P. G.; Schroeder, R. G. 1989. An instrument for measuring the critical factors of quality management, Decision Sciences 20(4): 810-29. doi: 10.1111/j.1540-5915.1989.tb01421.x.
-
(1989)
Decision Sciences
, vol.20
, Issue.4
, pp. 810-829
-
-
Saraph, J.V.1
Benson, P.G.2
Schroeder, R.G.3
-
66
-
-
0002625867
-
Strategies for assessing and managing organizational stakeholders
-
Savage, G. T.; Nix, T. W.; Whitehead, C. J.; Blair, J. D. 1991. Strategies for assessing and managing organizational stakeholders, Academy of Management Executive 5(2): 61-75.
-
(1991)
Academy of Management Executive
, vol.5
, Issue.2
, pp. 61-75
-
-
Savage, G.T.1
Nix, T.W.2
Whitehead, C.J.3
Blair, J.D.4
-
68
-
-
33750133195
-
-
8th edition. John Wiely & Sons, Inc. USA
-
Schermerhorn, J. R.; Hunt, J. G.; Osborn, R. N. 2003. Organizational Behaviour, 8th edition. John Wiely & Sons, Inc., USA.
-
(2003)
Organizational Behaviour
-
-
Schermerhorn, J.R.1
Hunt, J.G.2
Osborn, R.N.3
-
69
-
-
33747347789
-
Contractor selection sriteria: Investigation of opinions of Singapore construction practitioners
-
doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998)
-
Singh, D.; Tiong, R. L. K. 2006. Contractor selection sriteria: investigation of opinions of Singapore construction practitioners, Journal of Construction Engineering and Management 132(9): 998-1008. doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998).
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.9
, pp. 998-1008
-
-
Singh, D.1
Tiong, R.L.K.2
-
70
-
-
46049116650
-
The credibility gap in stakeholder management: Ethics and evidence of relationship management
-
DOI 10.1080/01446190801905414, PII 794113498, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
-
Smyth, H. 2008. The credibility gap in stakeholder management: ethics and evidence of relationship management, Construction Management and Economics 26(6): 611. doi: 10.1080/01446190801905414. (Pubitemid 351895206)
-
(2008)
Construction Management and Economics
, vol.26
, Issue.6
, pp. 633-643
-
-
Smyth, H.1
-
71
-
-
21844442887
-
Managing legitimacy: Strategic and institutional approached
-
doi: 10.2307/258788
-
Suchman, M. C. 1995. Managing legitimacy: strategic and institutional approached, Academy of Management Review 20(3): 571-610. doi: 10.2307/258788.
-
(1995)
Academy of Management Review
, vol.20
, Issue.3
, pp. 571-610
-
-
Suchman, M.C.1
-
73
-
-
12444289650
-
Choosing an appropriate research methodology
-
doi: 10.1080/01446199700000003
-
Walker, D. H. T. 1997. Choosing an appropriate research methodology, Construction Management and Economics 15(2): 149-159. doi: 10.1080/ 01446199700000003.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.2
, pp. 149-159
-
-
Walker, D.H.T.1
-
74
-
-
73349102135
-
Stakeholder and the supply chain
-
Walker, D. H. T. Rowlinson, S. Taylor & Francis
-
Walker, D. H. T.; Bourne, L. M.; Rowlinson, S. 2008. Stakeholder and The Supply Chain. Procurement Systems: A Cross-industry Project Management Perspective. Walker, D. H. T.; Rowlinson, S.; Taylor & Francis.
-
(2008)
Procurement Systems: A Cross-industry Project Management Perspective
-
-
Walker, D.H.T.1
Bourne, L.M.2
Rowlinson, S.3
-
75
-
-
0345811812
-
Risk management framework for BOT power projects in China
-
Wang, S. Q.; Tiong, R. L. K.; Ting, S. K.; Ashley, D. 1999. Risk management framework for BOT power projects in China, Journal of Project Finance 4(4): 56-57.
-
(1999)
Journal of Project Finance
, vol.4
, Issue.4
, pp. 56-57
-
-
Wang, S.Q.1
Tiong, R.L.K.2
Ting, S.K.3
Ashley, D.4
-
76
-
-
46049098782
-
Stakeholders and uncertainty management in projects
-
DOI 10.1080/01446190801998708, PII 794113703, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
-
Ward, S.; Chapman, C. 2008. Stakeholders and uncertainty management in projects, Construction Management and Economics 26(6): 563-577. doi: 10.1080/01446190801998708. (Pubitemid 351895200)
-
(2008)
Construction Management and Economics
, vol.26
, Issue.6
, pp. 563-577
-
-
Ward, S.1
Chapman, C.2
-
78
-
-
0002909102
-
Construction business systems in the European union
-
Winch, G. 2000. Construction business systems in the European Union, Building Research and Information 28(2): 88.
-
(2000)
Building Research and Information
, vol.28
, Issue.2
, pp. 88
-
-
Winch, G.1
-
79
-
-
20344383220
-
An empirical study of the important factors for knowledge-management adoption in the SME sector
-
DOI 10.1108/13673270510602773
-
Wong, K. Y.; Aspinwall, E. 2005. An empirical study of the important factors for knowledge-management adoption in the SME sector, Journal of Knowledge Management 9(3): 64-82. doi: 10.1108/13673270510602773. (Pubitemid 40792187)
-
(2005)
Journal of Knowledge Management
, vol.9
, Issue.3
, pp. 64-82
-
-
Wong, K.Y.1
Aspinwall, E.2
-
80
-
-
84965509487
-
Toward a comprehensive theory of collaboration
-
doi: 10.1177/0021886391272001
-
Wood, D. J.; Gray, B. 1991. Toward a comprehensive theory of collaboration, Journal of Applied Behavioral Science 27(2): 139-162. doi: 10.1177/0021886391272001.
-
(1991)
Journal of Applied Behavioral Science
, vol.27
, Issue.2
, pp. 139-162
-
-
Wood, D.J.1
Gray, B.2
-
82
-
-
37549072204
-
Developing of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study
-
doi: 10.1080/01446190701598673
-
Yeung, F. Y.; Chan, P. C.; Chan, W. M.; Li, L. K. 2007. Developing of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study, Construction Management and Economics 25: 1219-1237. doi: 10.1080/01446190701598673.
-
(2007)
Construction Management and Economics
, vol.25
, pp. 1219-1237
-
-
Yeung, F.Y.1
Chan, P.C.2
Chan, W.M.3
Li, L.K.4
-
83
-
-
33750118745
-
Investigation of critical success factors in construction project briefing by way of content analysis
-
doi: 10.1061/(ASCE)0733-9364(2006)132: 11(1178)
-
Yu, T. W.; Shen, Q. P.; Kelly, J.; Hunter, K. 2006. Investigation of critical success factors in construction project briefing by way of content analysis, Journal of Construction Engineering and Management 132(11): 1178-1186. doi: 10.1061/(ASCE)0733-9364(2006)132: 11(1178).
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.11
, pp. 1178-1186
-
-
Yu, T.W.1
Shen, Q.P.2
Kelly, J.3
Hunter, K.4
|