Volumn 15, Issue 4, 2009, Pages 337-348

Exploring critical success factors for stakeholder management in construction projects

Author keywords

Construction projects; Critical success factors (CSFs); Hong Kong; Rankings and groupings; Stakeholder management

Indexed keywords

ASSESSMENT TOOL; CONSTRUCTION PROJECTS; CRITICAL SUCCESS FACTOR; FACTOR ANALYSIS; HONG-KONG; LITERATURE REVIEWS; PILOT STUDIES; PROJECT MANAGERS; RELATIVE IMPORTANCE; SOCIAL RESPONSIBILITIES; STAKEHOLDER MANAGEMENT;

EID: 73349127154     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/1392-3730.2009.15.337-348     Document Type: Article
Times cited : (177)

References (83)
  • 2
    • 59649090896 scopus 로고    scopus 로고
    • Response strategies to stakeholder pressures in global projects
    • doi: 10.1016/j.ijproman.2008.09.007
    • Aaltonen, K.; Sivonen, R. 2009. Response strategies to stakeholder pressures in global projects, International Journal of Project Management 27: 131-141. doi: 10.1016/j.ijproman.2008.09.007.
    • (2009) International Journal of Project Management , vol.27 , pp. 131-141
    • Aaltonen, K.1    Sivonen, R.2
  • 3
    • 0030548814 scopus 로고    scopus 로고
    • Development and validation of TQM implementation constructs
    • doi: 10.1111/j.1540-5915.1996.tb00842.x
    • Ahire, S. L.; Golhar, D. Y.; Walker, M. A. 1996. Development and validation of TQM implementation constructs, Decision Sciences 27(1): 23-56. doi: 10.1111/j.1540-5915.1996.tb00842.x.
    • (1996) Decision Sciences , vol.27 , Issue.1 , pp. 23-56
    • Ahire, S.L.1    Golhar, D.Y.2    Walker, M.A.3
  • 4
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factors influencing project cost estimating practice
    • doi: 10.1080/014461900370979
    • Akintoye, A. 2000. Analysis of factors influencing project cost estimating practice, Construction Management and Economics 18: 77-89. doi: 10.1080/014461900370979.
    • (2000) Construction Management and Economics , vol.18 , pp. 77-89
    • Akintoye, A.1
  • 5
    • 42949084772 scopus 로고    scopus 로고
    • Critical success factors influencing safety program performance in Thai construction projects
    • DOI 10.1016/j.ssci.2007.06.006, PII S0925753507001026
    • Aksorn, T.; Hadikusumo, B. H. W. 2008. Critical success factors influencing safety program performance in Thai construction projects, Safety Science 46: 709-727. doi: 10.1016/j.ssci.2007.06.006. (Pubitemid 351609378)
    • (2008) Safety Science , vol.46 , Issue.4 , pp. 709-727
    • Aksorn, T.1    Hadikusumo, B.H.W.2
  • 6
    • 40549140841 scopus 로고    scopus 로고
    • Different stakeholder perceptions of sustainability assessment
    • AlWaer, H.; Sibley, M.; Lewis, J. 2008. Different stakeholder perceptions of sustainability assessment, Architectural Science Review 57(1): 48-59.
    • (2008) Architectural Science Review , vol.57 , Issue.1 , pp. 48-59
    • AlWaer, H.1    Sibley, M.2    Lewis, J.3
  • 7
    • 18844458339 scopus 로고    scopus 로고
    • Critical success factors of TQM implementation in Hong Kong industries
    • doi: 10.1108/02656710210427520
    • Antony, J.; Leung, K.; Knowles, G.; Gosh, S. 2002. Critical success factors of TQM implementation in Hong Kong industries, International Journal of Quality & Reliability Management 19(5): 551-566. doi: 10.1108/ 02656710210427520.
    • (2002) International Journal of Quality & Reliability Management , vol.19 , Issue.5 , pp. 551-566
    • Antony, J.1    Leung, K.2    Knowles, G.3    Gosh, S.4
  • 8
    • 0035314094 scopus 로고    scopus 로고
    • Conflict dissolution in the public sector: A case-study
    • DOI 10.1016/S0377-2217(00)00037-0
    • Bana e Costa, C. A.; Nunes da Silva, F.; Vansnick, J. C. 2001. Conflict dissolution in the public sector: A case-study, European Journal of Operational Research 130: 388-401. doi: 10.1016/S0377-2217(00)00037-0. (Pubitemid 32195798)
    • (2001) European Journal of Operational Research , vol.130 , Issue.2 , pp. 388-401
    • Bana E Costa, C.A.1    Nunes Da Silva, F.2    Vansnick, J.-C.3
  • 9
    • 0000697225 scopus 로고
    • A note on the multiplying factors for various chi square approximations
    • Bartlett, M. S. 1954. A note on the multiplying factors for various chi square approximations, Journal of the Royal Statistical Society 16(Series B): 396-398.
    • (1954) Journal of the Royal Statistical Society , vol.16 , Issue.SERIES B , pp. 396-398
    • Bartlett, M.S.1
  • 10
    • 0040834517 scopus 로고    scopus 로고
    • Identification of the critical factors of TQM
    • doi: 10.1111/j.1540-5915.1996.tb00841.x
    • Black, S. A.; Porter, L. J. 1996. Identification of the Critical Factors of TQM, Decision Sciences 27(1): 1-21. doi: 10.1111/j.1540-5915.1996.tb00841.x.
    • (1996) Decision Sciences , vol.27 , Issue.1 , pp. 1-21
    • Black, S.A.1    Porter, L.J.2
  • 12
    • 20444441536 scopus 로고    scopus 로고
    • Visualising and mapping stakeholder influence
    • DOI 10.1108/00251740510597680
    • Bourne, L.; Walker, D. H. T. 2005. Visualising and mapping stakeholder influence, Management Decision 43(5): 649-660. doi: 10.1108/00251740510597680. (Pubitemid 40815173)
    • (2005) Management Decision , vol.43 , Issue.5 , pp. 649-660
    • Bourne, L.1    Walker, D.H.T.2
  • 13
    • 46049104799 scopus 로고    scopus 로고
    • Visualizing stakeholder influence - Two Australian examples
    • Bourne, L.; Walker, D. H. T. 2006. Visualizing stakeholder influence - two Australian examples, Project Management Journal 37(1): 5-22.
    • (2006) Project Management Journal , vol.37 , Issue.1 , pp. 5-22
    • Bourne, L.1    Walker, D.H.T.2
  • 15
    • 0000758307 scopus 로고
    • A three-dimensional conceptual model of corporate social performance
    • doi: 10.2307/257850
    • Carroll, A. B. 1979. A three-dimensional conceptual model of corporate social performance, Academy of Management Review 4(4): 497-506. doi: 10.2307/257850.
    • (1979) Academy of Management Review , vol.4 , Issue.4 , pp. 497-506
    • Carroll, A.B.1
  • 16
    • 44949275678 scopus 로고
    • The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders
    • doi: 10.1016/0007-6813(91)90005-G
    • Carroll, A. B. 1991. The pyramid of corporate social responsibility: Toward the moral management of organizational stakeholders, Business Horizons 7: 39-48. doi: 10.1016/0007-6813(91)90005-G.
    • (1991) Business Horizons , vol.7 , pp. 39-48
    • Carroll, A.B.1
  • 17
    • 0042155411 scopus 로고    scopus 로고
    • An empirical study of the benefits of construction partnering in Hong Kong
    • DOI 10.1080/0144619032000056162
    • Chan, P. C.; Chan, W. M.; Ho, S. K. 2003. An empirical study of the benefits of construction parting in Hong Kong, Construction Management and Economics 21: 523-533. doi: 10.1080/0144619032000056162. (Pubitemid 36971546)
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 523-533
    • Chan, A.P.C.1    Chan, D.W.M.2    Ho, K.S.K.3
  • 19
    • 0035280018 scopus 로고    scopus 로고
    • Design and build project success factors: Multivariate analysis
    • March/April:, doi: 10.1061/(ASCE)0733-9364(2001)127: 2(93)
    • Chan, P. C. A.; Ho, C. K. D.; Tam, C. M. 2001. Design and build project success factors: multivariate analysis, Journal of Construction Engineering and Management March/April: 93-100. doi: 10.1061/(ASCE)0733-9364(2001)127: 2(93).
    • (2001) Journal of Construction Engineering and Management , pp. 93-100
    • Chan, P.C.A.1    Ho, C.K.D.2    Tam, C.M.3
  • 20
    • 0013143897 scopus 로고
    • Project stakeholder management
    • Cleland, D. I. 1986. Project stakeholder management, Project Management Journal 17(4): 36-44.
    • (1986) Project Management Journal , vol.17 , Issue.4 , pp. 36-44
    • Cleland, D.I.1
  • 21
    • 0001832041 scopus 로고
    • Leadership and the project management body of knowledge
    • doi: 10.1016/0263-7863(94)00018-8
    • Cleland, D. I. 1995. Leadership and the project management body of knowledge, International Journal of Project Management 13(2): 82-88. doi: 10.1016/0263-7863(94)00018-8.
    • (1995) International Journal of Project Management , vol.13 , Issue.2 , pp. 82-88
    • Cleland, D.I.1
  • 24
    • 56949101729 scopus 로고    scopus 로고
    • Stakeholder behavior and legislative influence: A case study of recreational water rights in Colorado
    • Nov.
    • Crow, D. A. 2008. Stakeholder behavior and legislative influence: A case study of recreational water rights in Colorado, The Social Science Journal Nov. (20): 1-13.
    • (2008) The Social Science Journal , vol.20 , pp. 1-13
    • Crow, D.A.1
  • 25
    • 0033995724 scopus 로고    scopus 로고
    • Soft systems approaches for analyzing proposed change and stakeholder response - A case study
    • doi: 10.1080/02630259908970271
    • Dias, W. P. S. 1999. Soft systems approaches for analyzing proposed change and stakeholder response - a case study, Civil Engineering and Environmental Systems 17(1): 1-17. doi: 10.1080/02630259908970271.
    • (1999) Civil Engineering and Environmental Systems , vol.17 , Issue.1 , pp. 1-17
    • Dias, W.P.S.1
  • 26
    • 21844463321 scopus 로고
    • The stakeholder theory of the corporation: Concepts, evidence, and implications
    • doi: 10.2307/258887
    • Donaldson, T.; Preston, L. E. 1995. The stakeholder theory of the corporation: concepts, evidence, and implications, The Academy of Management Review 20(1): 65-88. doi: 10.2307/258887.
    • (1995) The Academy of Management Review , vol.20 , Issue.1 , pp. 65-88
    • Donaldson, T.1    Preston, L.E.2
  • 27
    • 33748475041 scopus 로고    scopus 로고
    • Stakeholder management for public private partnerships
    • DOI 10.1016/j.ijproman.2006.07.009, PII S0263786306000949
    • El-Gohary, N. M.; Osman, H.; Ei-Diraby, T. E. 2006. Stakeholder management for public private partnerships, International Journal of Project Management 24(7): 595-604. doi: 10.1016/j.ijproman.2006.07.009. (Pubitemid 44350059)
    • (2006) International Journal of Project Management , vol.24 , Issue.7 , pp. 595-604
    • El-Gohary, N.M.1    Osman, H.2    El-Diraby, T.E.3
  • 28
    • 33750376514 scopus 로고    scopus 로고
    • Strategies for assessing and managing stakeholders in the egyptian construction industry
    • El-Sawah, H. M. 2006. Strategies for assessing and managing stakeholders in the Egyptian construction industry, Journal of Engineering and Applied Science 53(2): 195-213.
    • (2006) Journal of Engineering and Applied Science , vol.53 , Issue.2 , pp. 195-213
    • El-Sawah, H.M.1
  • 29
    • 0035994938 scopus 로고    scopus 로고
    • Stakeholder analysis for R&D project management
    • doi: 10.1111/1467-9310.00262
    • Elias, A. A.; Cavana, R. Y.; Jackson, L. S. 2002. Stakeholder analysis for R&D project management, R&D Management 34 (2): 301-310. doi: 10.1111/1467-9310.00262.
    • (2002) R&D Management , vol.34 , Issue.2 , pp. 301-310
    • Elias, A.A.1    Cavana, R.Y.2    Jackson, L.S.3
  • 32
    • 0033241672 scopus 로고    scopus 로고
    • Stakeholder influence strategies
    • doi: 10.2307/259074
    • Frooman, J. 1999. Stakeholder influence strategies, Academy of Management Review 24(2): 191-205. doi: 10.2307/259074.
    • (1999) Academy of Management Review , vol.24 , Issue.2 , pp. 191-205
    • Frooman, J.1
  • 33
    • 3843102504 scopus 로고    scopus 로고
    • An empirical study of the ISO 9000 standards' contribution towards total quality management
    • DOI 10.1108/EUM0000000005972
    • Gotzamani, K. D.; Tsiotras, G. D. 2001. An empirical study of the ISO 9000 standards' contribution towards total quality management, International Journal of Operations & Pro-duction Management 21(10): 1326-1342. doi: 10.1108/EUM0000000005972. (Pubitemid 39046801)
    • (2001) International Journal of Operations and Production Management , vol.21 , Issue.10 , pp. 1326-1342
    • Gotzamani, K.D.1    Tsiotras, G.D.2
  • 34
    • 67349273629 scopus 로고    scopus 로고
    • The role of trust in project management
    • D. P. Sle-vin, D. I. Cleland and J. K.Pinto. Newtown Square, Pennsylvania, PMI
    • Hartmann, F. T. 2002. The role of trust in project management, in Frontiers of Project Management Research. D. P. Sle-vin, D. I. Cleland and J. K.Pinto. Newtown Square, Pennsylvania, PMI, 225-235.
    • (2002) Frontiers of Project Management Research , pp. 225-235
    • Hartmann, F.T.1
  • 35
    • 84993047123 scopus 로고    scopus 로고
    • Critical success factors of the BOOT procurement system: Reflection from the stadium Australia case study, engineering
    • doi: 10.1046/j.1365-232X.2002.00249.x
    • Jefferies, M.; Gameson, R.; Rowlinson, S. 2002. Critical success factors of the BOOT procurement system: reflection from the Stadium Australia case study, Engineering, Construction and Architectural Management 9(4): 352-361. doi: 10.1046/j.1365-232X.2002.00249.x.
    • (2002) Construction and Architectural Management , vol.9 , Issue.4 , pp. 352-361
    • Jefferies, M.1    Gameson, R.2    Rowlinson, S.3
  • 36
    • 73349095668 scopus 로고    scopus 로고
    • Stakeholder analysis in projects: Challenges in using current guidelines in the real world
    • Jepsen, A. L.; Eskerod, P. 2008. Stakeholder analysis in projects: Challenges in using current guidelines in the real world, International Journal of Project Management 4(2): 1-9.
    • (2008) International Journal of Project Management , vol.4 , Issue.2 , pp. 1-9
    • Jepsen, A.L.1    Eskerod, P.2
  • 38
    • 34250493668 scopus 로고
    • A second generation little jiffy
    • doi: 10.1007/BF02291817
    • Kaiser, H. 1970. A second generation little jiffy, Psychometrika 35: 401-415. doi: 10.1007/BF02291817.
    • (1970) Psychometrika , vol.35 , pp. 401-415
    • Kaiser, H.1
  • 39
    • 0036983703 scopus 로고    scopus 로고
    • Project stakeholder management
    • Karlsen, J. T. 2002. Project stakeholder management, Engineering Management Journal 14(4): 19-24.
    • (2002) Engineering Management Journal , vol.14 , Issue.4 , pp. 19-24
    • Karlsen, J.T.1
  • 40
    • 49249085266 scopus 로고    scopus 로고
    • Building trust in project-stakeholder relationships
    • doi: 10.1108/17465260810844239
    • Karlsen, J. T.; Græe, K.; Massaoud, M. J. 2008. Building trust in project-stakeholder relationships, Baltic Journal of Management 3(1): 7. doi: 10.1108/17465260810844239.
    • (2008) Baltic Journal of Management , vol.3 , Issue.1 , pp. 7
    • Karlsen, J.T.1    Græe, K.2    Massaoud, M.J.3
  • 43
    • 18844379685 scopus 로고    scopus 로고
    • Is there a relationship between construction conflicts and participants' satisfaction?
    • doi: 10.1108/09699980510584494
    • Leung, M. Y.; Liu, A. M. M.; Thomas, N. S. 2005. Is there a relationship between construction conflicts and participants' satisfaction?, Engineering, Construction and Architectural Management 12(2): 149-167. doi: 10.1108/09699980510584494.
    • (2005) Engineering, Construction and Architectural Management , vol.12 , Issue.2 , pp. 149-167
    • Leung, M.Y.1    Liu, A.M.M.2    Thomas, N.S.3
  • 44
    • 22144480927 scopus 로고    scopus 로고
    • Critical success factors for PPP/PFI projects in the UK construction industry
    • DOI 10.1080/01446190500041537
    • Li, B.; Akintoye, A.; Edwards, P. J.; Hardcastle, C. 2005. Critical success factors for PPP/PFI projects in the UK construction industry, Construction Management and Economics 23: 459-471. doi: 10.1080/ 01446190500041537. (Pubitemid 40974445)
    • (2005) Construction Management and Economics , vol.23 , Issue.5 , pp. 459-471
    • Li, B.1    Akintoye, A.2    Edwards, P.J.3    Hardcastle, C.4
  • 46
    • 2642525413 scopus 로고    scopus 로고
    • Industry-centric benchmarking of information technology benefits, costs, risks for small-to-medium sized enterprises in construction
    • doi: 10.1016/j.autcon.2004.02.002
    • Love, P. E. D.; Irani, Z.; Edwards, D. J. 2004. Industry-centric benchmarking of information technology benefits, costs, risks for small-to-medium sized enterprises in construction, Automation in Construction 13(4): 507-524. doi: 10.1016/j.autcon.2004.02.002.
    • (2004) Automation in Construction , vol.13 , Issue.4 , pp. 507-524
    • Love, P.E.D.1    Irani, Z.2    Edwards, D.J.3
  • 47
    • 0031529953 scopus 로고    scopus 로고
    • Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts
    • doi: 10.2307/259247
    • Mitchell, R. K.; Agle, B. R.; Wood, D. J. 1997. Toward a theory of stakeholder identification and salience: defining the principle of who and what really counts, Academy of Management Review 22(4): 853-887. doi: 10.2307/259247.
    • (1997) Academy of Management Review , vol.22 , Issue.4 , pp. 853-887
    • Mitchell, R.K.1    Agle, B.R.2    Wood, D.J.3
  • 48
    • 46049090973 scopus 로고    scopus 로고
    • Stakeholder matrix for ethical relationships in the construction industry
    • DOI 10.1080/01446190801965368, PII 794113094, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Moodley, K.; Smith, N.; Preece, C. N. 2008. Stakeholder matrix for ethical relationships in the construction industry, Construction Management & Economics 26(6): 625-632. doi: 10.1080/01446190801965368. (Pubitemid 351895205)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 625-632
    • Moodley, K.1    Smith, N.2    Preece, C.N.3
  • 49
    • 73349130385 scopus 로고    scopus 로고
    • From client to project stakeholders: A stakeholder mapping approach
    • Newcombe, R. 2003. From client to project stakeholders: a stakeholder mapping approach, Construction Management and Economics 22(9/10): 762-784.
    • (2003) Construction Management and Economics , vol.22 , Issue.9-10 , pp. 762-784
    • Newcombe, R.1
  • 53
    • 34047161918 scopus 로고    scopus 로고
    • Stakeholder impact analysis in construction project management
    • DOI 10.1080/01446190600879125, PII 775676045
    • Olander, S. 2007. Stakeholder impact analysis in construction project management, Construction Management and Economics 25(3): 277-287. doi: 10.1080/01446190600879125. (Pubitemid 46510936)
    • (2007) Construction Management and Economics , vol.25 , Issue.3 , pp. 277-287
    • Olander, S.1
  • 54
    • 18144403769 scopus 로고    scopus 로고
    • Evaluation of stakeholder influence in the implementation of construction projects
    • DOI 10.1016/j.ijproman.2005.02.002, PII S0263786305000232
    • Olander, S.; Landin, A. 2005. Evaluation of stakeholder influence in the implementation of construction projects, International Journal of Project Management 23(4): 321. doi: 10.1016/j.ijproman.2005.02.002. (Pubitemid 40621265)
    • (2005) International Journal of Project Management , vol.23 , Issue.4 , pp. 321-328
    • Olander, S.1    Landin, A.2
  • 55
    • 46049095684 scopus 로고    scopus 로고
    • A comparative study of factors affecting the external stakeholder management process
    • DOI 10.1080/01446190701821810, PII 794112488, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Olander, S., and Landin, A. 2008. A comparative study of factors affecting the external stakeholder management process, Construction Management and Economics 26(6): 553. doi: 10.1080/01446190701821810. (Pubitemid 351895199)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 553-561
    • Olander, S.1    Landin, A.2
  • 56
    • 0003982844 scopus 로고    scopus 로고
    • Open University Press, Buckingham and Philadephia
    • Pallant, J. 2001. SPSS Survival Manual. Open University Press, Buckingham and Philadephia.
    • (2001) SPSS Survival Manual
    • Pallant, J.1
  • 58
    • 1142295369 scopus 로고    scopus 로고
    • The Project Management Institute, Jossey-bass Inc. San Francisco, California, U.S.A.
    • Pinto, J. K. 1998. Project Management Handbook. The Project Management Institute, Jossey-bass Inc., San Francisco, California, U.S.A.
    • (1998) Project Management Handbook
    • Pinto, J.K.1
  • 59
    • 21744446475 scopus 로고    scopus 로고
    • Stakeholder identification in inter-organizational systems: Gaining insights for drug use
    • doi: 10.1057/palgrave.ejis.3000252
    • Pouloudi, A.; Whitley, E. A. 1997. Stakeholder identification in inter-organizational systems: gaining insights for drug use, European Journal of Information System 6(1): 1. doi: 10.1057/palgrave.ejis.3000252.
    • (1997) European Journal of Information System , vol.6 , Issue.1 , pp. 1
    • Pouloudi, A.1    Whitley, E.A.2
  • 60
    • 56249128566 scopus 로고    scopus 로고
    • Stakeholder involvement in agri-environmental policy making - Learning from a local and a state-level approach in Germany
    • doi: 10.1016/j.jenvman.2008.05.005
    • Prager, K.; Freese, J. 2009. Stakeholder involvement in agri-environmental policy making - Learning from a local and a state-level approach in Germany, Journal of Environmental Management 90(2): 1154-1167. doi: 10.1016/j.jenvman.2008.05.005.
    • (2009) Journal of Environmental Management , vol.90 , Issue.2 , pp. 1154-1167
    • Prager, K.1    Freese, J.2
  • 61
    • 21844445348 scopus 로고    scopus 로고
    • From imagination to realization: A legal foundation for stakeholder theory
    • doi: 10.1016/S1529-2096(02)04004-X
    • Radin, T. J. 2002. From imagination to realization: A legal foundation for stakeholder theory, Research in Ethical Issues in Organizations 4: 31-49. doi: 10.1016/S1529-2096(02)04004-X.
    • (2002) Research in Ethical Issues in Organizations , vol.4 , pp. 31-49
    • Radin, T.J.1
  • 62
    • 52049115626 scopus 로고    scopus 로고
    • Stakeholder participation for environmental management: A literature review
    • doi: 10.1016/j.biocon.2008.07.014
    • Reed, M. S. 2008. Stakeholder participation for environmental management: A literature review, Biological Conservation 141(10): 2417-2431. doi: 10.1016/j.biocon.2008.07.014.
    • (2008) Biological Conservation , vol.141 , Issue.10 , pp. 2417-2431
    • Reed, M.S.1
  • 63
    • 0018451997 scopus 로고
    • Chief executives define their own data needs
    • Rockart, J. F. 1979. Chief executives define their own data needs, Harvard Business Review 57(2): 81-93.
    • (1979) Harvard Business Review , vol.57 , Issue.2 , pp. 81-93
    • Rockart, J.F.1
  • 64
    • 46049110518 scopus 로고    scopus 로고
    • Stakeholder management through empowerment: Modelling project success
    • DOI 10.1080/01446190802071182, PII 794114011, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Rowlinson, S.; Cheung, Y. K. F. 2008. Stakeholder management through empowerment: modeling project success, Construction Management and Economics 26(6): 611. doi: 10.1080/01446190802071182. (Pubitemid 351895204)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 611-623
    • Rowlinson, S.1    Cheung, Y.K.F.2
  • 65
    • 84962968942 scopus 로고
    • An instrument for measuring the critical factors of quality management
    • doi: 10.1111/j.1540-5915.1989.tb01421.x
    • Saraph, J. V.; Benson, P. G.; Schroeder, R. G. 1989. An instrument for measuring the critical factors of quality management, Decision Sciences 20(4): 810-29. doi: 10.1111/j.1540-5915.1989.tb01421.x.
    • (1989) Decision Sciences , vol.20 , Issue.4 , pp. 810-829
    • Saraph, J.V.1    Benson, P.G.2    Schroeder, R.G.3
  • 69
    • 33747347789 scopus 로고    scopus 로고
    • Contractor selection sriteria: Investigation of opinions of Singapore construction practitioners
    • doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998)
    • Singh, D.; Tiong, R. L. K. 2006. Contractor selection sriteria: investigation of opinions of Singapore construction practitioners, Journal of Construction Engineering and Management 132(9): 998-1008. doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.9 , pp. 998-1008
    • Singh, D.1    Tiong, R.L.K.2
  • 70
    • 46049116650 scopus 로고    scopus 로고
    • The credibility gap in stakeholder management: Ethics and evidence of relationship management
    • DOI 10.1080/01446190801905414, PII 794113498, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Smyth, H. 2008. The credibility gap in stakeholder management: ethics and evidence of relationship management, Construction Management and Economics 26(6): 611. doi: 10.1080/01446190801905414. (Pubitemid 351895206)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 633-643
    • Smyth, H.1
  • 71
    • 21844442887 scopus 로고
    • Managing legitimacy: Strategic and institutional approached
    • doi: 10.2307/258788
    • Suchman, M. C. 1995. Managing legitimacy: strategic and institutional approached, Academy of Management Review 20(3): 571-610. doi: 10.2307/258788.
    • (1995) Academy of Management Review , vol.20 , Issue.3 , pp. 571-610
    • Suchman, M.C.1
  • 73
    • 12444289650 scopus 로고    scopus 로고
    • Choosing an appropriate research methodology
    • doi: 10.1080/01446199700000003
    • Walker, D. H. T. 1997. Choosing an appropriate research methodology, Construction Management and Economics 15(2): 149-159. doi: 10.1080/ 01446199700000003.
    • (1997) Construction Management and Economics , vol.15 , Issue.2 , pp. 149-159
    • Walker, D.H.T.1
  • 76
    • 46049098782 scopus 로고    scopus 로고
    • Stakeholders and uncertainty management in projects
    • DOI 10.1080/01446190801998708, PII 794113703, STAKEHOLDER MANAGEMENT IN CONSTRUCTION
    • Ward, S.; Chapman, C. 2008. Stakeholders and uncertainty management in projects, Construction Management and Economics 26(6): 563-577. doi: 10.1080/01446190801998708. (Pubitemid 351895200)
    • (2008) Construction Management and Economics , vol.26 , Issue.6 , pp. 563-577
    • Ward, S.1    Chapman, C.2
  • 78
    • 0002909102 scopus 로고    scopus 로고
    • Construction business systems in the European union
    • Winch, G. 2000. Construction business systems in the European Union, Building Research and Information 28(2): 88.
    • (2000) Building Research and Information , vol.28 , Issue.2 , pp. 88
    • Winch, G.1
  • 79
    • 20344383220 scopus 로고    scopus 로고
    • An empirical study of the important factors for knowledge-management adoption in the SME sector
    • DOI 10.1108/13673270510602773
    • Wong, K. Y.; Aspinwall, E. 2005. An empirical study of the important factors for knowledge-management adoption in the SME sector, Journal of Knowledge Management 9(3): 64-82. doi: 10.1108/13673270510602773. (Pubitemid 40792187)
    • (2005) Journal of Knowledge Management , vol.9 , Issue.3 , pp. 64-82
    • Wong, K.Y.1    Aspinwall, E.2
  • 80
    • 84965509487 scopus 로고
    • Toward a comprehensive theory of collaboration
    • doi: 10.1177/0021886391272001
    • Wood, D. J.; Gray, B. 1991. Toward a comprehensive theory of collaboration, Journal of Applied Behavioral Science 27(2): 139-162. doi: 10.1177/0021886391272001.
    • (1991) Journal of Applied Behavioral Science , vol.27 , Issue.2 , pp. 139-162
    • Wood, D.J.1    Gray, B.2
  • 82
    • 37549072204 scopus 로고    scopus 로고
    • Developing of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study
    • doi: 10.1080/01446190701598673
    • Yeung, F. Y.; Chan, P. C.; Chan, W. M.; Li, L. K. 2007. Developing of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study, Construction Management and Economics 25: 1219-1237. doi: 10.1080/01446190701598673.
    • (2007) Construction Management and Economics , vol.25 , pp. 1219-1237
    • Yeung, F.Y.1    Chan, P.C.2    Chan, W.M.3    Li, L.K.4
  • 83
    • 33750118745 scopus 로고    scopus 로고
    • Investigation of critical success factors in construction project briefing by way of content analysis
    • doi: 10.1061/(ASCE)0733-9364(2006)132: 11(1178)
    • Yu, T. W.; Shen, Q. P.; Kelly, J.; Hunter, K. 2006. Investigation of critical success factors in construction project briefing by way of content analysis, Journal of Construction Engineering and Management 132(11): 1178-1186. doi: 10.1061/(ASCE)0733-9364(2006)132: 11(1178).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.11 , pp. 1178-1186
    • Yu, T.W.1    Shen, Q.P.2    Kelly, J.3    Hunter, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.