메뉴 건너뛰기




Volumn 51, Issue 23-24, 2013, Pages 7071-7090

Operations scheduling with multiple resources and transportation considerations

Author keywords

Complexity analysis; Non renewable resource; Operations scheduling; Polynomial time algorithms; Renewable resource; Tardiness penalty

Indexed keywords

COMPLEXITY ANALYSIS; NON-RENEWABLE RESOURCE; OPERATIONS SCHEDULING; POLYNOMIAL-TIME ALGORITHMS; RENEWABLE RESOURCE; TARDINESS PENALTIES;

EID: 84890566327     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.781283     Document Type: Review
Times cited : (32)

References (61)
  • 1
    • 84867232717 scopus 로고    scopus 로고
    • Modeling integrated supply chain logistics in real-time large-scale disaster relief operations
    • Afshar, A., and A. Haghani. 2012. "Modeling Integrated Supply Chain Logistics in Real-time Large-scale Disaster Relief Operations." Socio-Economic Planning Sciences 46 (4): 327-338.
    • (2012) Socio-Economic Planning Sciences , vol.46 , Issue.4 , pp. 327-338
    • Afshar, A.1    Haghani, A.2
  • 4
    • 0031187330 scopus 로고    scopus 로고
    • Job shop scheduling with delay-renewable resources: A comparison of decomposition strategies
    • Alfieri, A., and P. Brandimarte. 1997. "Job Shop Scheduling with Delay-Renewable Resources: A Comparison of Decomposition Strategies." International Journal of Production Research 35 (7): 1807-1823. (Pubitemid 127549697)
    • (1997) International Journal of Production Research , vol.35 , Issue.7 , pp. 1807-1823
    • Alfieri, A.1    Brandimarte, P.2
  • 6
    • 70449585390 scopus 로고    scopus 로고
    • Multi-objective resource assignment problem in a product-driven supply chain using a taguchi-based dna algorithm
    • Bachlaus, M., M. K. Tiwarib, and F. T. S. Chan. 2009. "Multi-objective Resource Assignment Problem in a Product-Driven Supply Chain Using a Taguchi-based DNA Algorithm." International Journal of Production Research 47 (9): 2345-2371.
    • (2009) International Journal of Production Research , vol.47 , Issue.9 , pp. 2345-2371
    • Bachlaus, M.1    Tiwarib, M.K.2    Chan, F.T.S.3
  • 10
    • 53349118245 scopus 로고    scopus 로고
    • An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
    • Ballestin, F., and N. Trautmann. 2008. "An Iterated-local-search Heuristic for the Resource-constrained Weighted Earliness-Tardiness Project Scheduling Problem." International Journal of Production Research 46 (22): 6231-6249.
    • (2008) International Journal of Production Research , vol.46 , Issue.22 , pp. 6231-6249
    • Ballestin, F.1    Trautmann, N.2
  • 11
    • 18144452822 scopus 로고    scopus 로고
    • Project scheduling under partially renewable resource constraints
    • Bottcher, J., A. Drexl, R. Kolisch, and F. Salewski. 1999. "Project Scheduling under Partially Renewable Resource Constraints." Management Science 45 (4): 543-559.
    • (1999) Management Science , vol.45 , Issue.4 , pp. 543-559
    • Bottcher, J.1    Drexl, A.2    Kolisch, R.3    Salewski, F.4
  • 12
    • 46449101715 scopus 로고    scopus 로고
    • A faster polynomial algorithm for the unbalanced hitchcock transportation problem
    • Brenner, U. 2008. "A Faster Polynomial Algorithm for the Unbalanced Hitchcock Transportation Problem." Operations Research Letters 36 (4): 408-413.
    • (2008) Operations Research Letters , vol.36 , Issue.4 , pp. 408-413
    • Brenner, U.1
  • 13
    • 0030125537 scopus 로고    scopus 로고
    • Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
    • Brucker, P., and A. Kramer. 1996. "Polynomial Algorithms for Resource-constrained and Multiprocessor Task Scheduling Problems." European Journal of Operational Research 90 (2): 214-226. (Pubitemid 126652210)
    • (1996) European Journal of Operational Research , vol.90 , Issue.2 , pp. 214-226
    • Brucker, P.1    Kramer, A.2
  • 17
    • 84155169077 scopus 로고    scopus 로고
    • Optimization models in emergency logistics: A literature review
    • Caunhye, A., X. Nie, and S. Pokharel. 2012. "Optimization Models in Emergency Logistics: A Literature Review." Socio-Economic Planning Sciences 46 (1): 4-13.
    • (2012) Socio-Economic Planning Sciences , vol.46 , Issue.1 , pp. 4-13
    • Caunhye, A.1    Nie, X.2    Pokharel, S.3
  • 18
    • 36248981989 scopus 로고    scopus 로고
    • Scheduling of unrelated parallel manufacturing cells with limited human resources
    • DOI 10.1080/00207540601138452, PII 777073224, Selected papers from the 2nd Group Technology/Cellular Manufacturing World Symposium
    • Celano, G., A. Costa, and S. Fichera. 2008. "Scheduling of Unrelated Parallel Manufacturing Cells with Limited Human Resources." International Journal of Production Research 46 (2): 405-427. (Pubitemid 350136916)
    • (2008) International Journal of Production Research , vol.46 , Issue.2 , pp. 405-427
    • Celano, G.1    Costa, A.2    Fichera, S.3
  • 20
    • 33745123677 scopus 로고    scopus 로고
    • Research on resources optimisation deployment model and algorithm for collaborative manufacturing process
    • DOI 10.1080/00207540500478520, PII J4802150071653
    • Changfeng, Y., Z. Dinghua, P. Wenli, and B. Kun. 2006. "Research on Resources Optimization Deployment Model and Algorithm for Collaborative Manufacturing Process." International Journal of Production Research 44 (16): 3279-3301. (Pubitemid 43898324)
    • (2006) International Journal of Production Research , vol.44 , Issue.16 , pp. 3279-3301
    • Changfeng, Y.1    Dinghua, Z.2    Wenli, P.3    Kun, B.4
  • 21
    • 38549091692 scopus 로고    scopus 로고
    • A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
    • DOI 10.1287/opre.1060.0358
    • Debels, D., and M. Vanhoucke. 2007. "A Decomposition-based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem." Operations Research 55 (3): 457-469. (Pubitemid 351159503)
    • (2007) Operations Research , vol.55 , Issue.3 , pp. 457-469
    • Debels, D.1    Vanhoucke, M.2
  • 22
    • 34047139878 scopus 로고    scopus 로고
    • Robust resource allocation decisions in resource- constrained projects
    • Deblaere, F., E. Demeulemeester, W. Herroelen, and S. Van de Vonder. 2007. "Robust Resource Allocation Decisions in Resource- Constrained Projects." Decision Sciences 38 (1): 5-37.
    • (2007) Decision Sciences , vol.38 , Issue.1 , pp. 5-37
    • Deblaere, F.1    Demeulemeester, E.2    Herroelen, W.3    Vonder De S.Van4
  • 24
    • 79959723302 scopus 로고    scopus 로고
    • Proactive policies for the stochastic resource-constrained project scheduling problem
    • Deblaere, F., E. Demeulemeester, and W. Herroelen. 2011b. "Proactive Policies for the Stochastic Resource-Constrained Project Scheduling Problem." European Journal of Operational Research 214 (2): 308-316.
    • (2011) European Journal of Operational Research , vol.214 , Issue.2 , pp. 308-316
    • Deblaere, F.1    Demeulemeester, E.2    Herroelen, W.3
  • 25
    • 0035922493 scopus 로고    scopus 로고
    • A simple and effective heuristic for the resource constrained project scheduling problem
    • DOI 10.1080/00207540110060608
    • Depuy, G. W., and G. E. Whitehouse. 2001. "A Simple and Effective Heuristic for the Resource Constrained Project-Scheduling Problem." International Journal of Production Research 39 (14): 3275-3287. (Pubitemid 35165542)
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3275-3287
    • DePuy, G.W.1    Whitehouse, G.E.2
  • 26
    • 0032073129 scopus 로고    scopus 로고
    • Incorporating human resources in group technology/cellular manufacturing
    • Eckstein, A. L. H., and T. R. Rohleder. 1998. "Incorporating Human Resources in Group Technology/Cellular Manufacturing." International Journal of Production Research 36 (5): 1199-1222. (Pubitemid 128553195)
    • (1998) International Journal of Production Research , vol.36 , Issue.5 , pp. 1199-1222
    • Eckstein, A.L.H.1    Rohleder, T.R.2
  • 27
    • 85055302407 scopus 로고    scopus 로고
    • Coordination in the great lakes
    • September, 23-24
    • Fenton, G. 2003. "Coordination in the Great Lakes." Forced Migration Review, September, 23-24.
    • (2003) Forced Migration Review
    • Fenton, G.1
  • 29
    • 0030143384 scopus 로고    scopus 로고
    • Formulation and solution of a multi-commodity, multi-modal network flow model for disaster relief operations
    • DOI 10.1016/0965-8564(95)00020-8
    • Haghani, A., and S. C. Oh. 1996. "Formulation and Solution of a Multi-commodity, Multi-modal Network Flow Model for Disaster Relief Operations." Transportation Research Part A: Policy and Practice 30 (3): 231-250. (Pubitemid 126404265)
    • (1996) Transportation Research Part A: Policy and Practice , vol.30 , Issue.3 , pp. 231-250
    • Haghani, A.1    Oh, S.-C.2
  • 30
    • 77953872383 scopus 로고    scopus 로고
    • A survey of variants and extensions of the resource-constrained project scheduling problem
    • Hartmann, S., and D. Briskorn. 2010. "A Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem." European Journal of Operational Research 207 (1): 1-14.
    • (2010) European Journal of Operational Research , vol.207 , Issue.1 , pp. 1-14
    • Hartmann, S.1    Briskorn, D.2
  • 31
    • 80054121880 scopus 로고    scopus 로고
    • Models for relief routing: Equity, efficiency and efficacy
    • Huang, M., K. Smilowitz, and B. Balcik. 2012. "Models for Relief Routing: Equity, Efficiency and Efficacy." Transportation Research Part E 48 (1): 2-18.
    • (2012) Transportation Research Part e , vol.48 , Issue.1 , pp. 2-18
    • Huang, M.1    Smilowitz, K.2    Balcik, B.3
  • 32
    • 0242364622 scopus 로고    scopus 로고
    • Dynamic approach to human resources planning for major professional companies with a peak-wise demand
    • Hwang, N.-C., and K. Kogan. 2003. "Dynamic Approach to Human Resources Planning for Major Professional Companies with a Peak-Wise Demand." International Journal of Production Research 41 (6): 1255-1271.
    • (2003) International Journal of Production Research , vol.41 , Issue.6 , pp. 1255-1271
    • Hwang, N.-C.1    Kogan, K.2
  • 33
    • 84859963108 scopus 로고    scopus 로고
    • The multi-resource agent bottleneck generalized assignment problem
    • Karsu, O., and M. Azizoglu. 2012. "The Multi-Resource Agent Bottleneck Generalized Assignment Problem." International Journal of Production Research 50 (2): 309-324.
    • (2012) International Journal of Production Research , vol.50 , Issue.2 , pp. 309-324
    • Karsu, O.1    Azizoglu, M.2
  • 34
    • 0034634797 scopus 로고    scopus 로고
    • Project scheduling with time-varying resource constraints
    • DOI 10.1080/00207540050176094
    • Klein, R. 2000. "Project Scheduling with Time-varying Resource Constraints." International Journal of Production Research 38 (16): 3937-3952. (Pubitemid 35401939)
    • (2000) International Journal of Production Research , vol.38 , Issue.16 , pp. 3937-3952
    • Klein, R.1
  • 35
    • 0035637004 scopus 로고    scopus 로고
    • Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases
    • Lee, C.-Y., and L. Lei. 2001. "Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases." Annals of Operations Research 102 (1-4): 287-307.
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 287-307
    • Lee, C.-Y.1    Lei, L.2
  • 36
    • 0000482108 scopus 로고    scopus 로고
    • Scheduling jobs on parallel machines with sequence-dependent setup times
    • Lee, Y. H., and M. Pinedo. 1997. "Scheduling Jobs on Parallel Machines with Sequence Dependent Setup Times." European Journal of Operational Research 100 (3): 464-474. (Pubitemid 127392370)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 464-474
    • Lee, Y.H.1    Pinedo, M.2
  • 37
    • 2942687563 scopus 로고    scopus 로고
    • Stability and resource allocation in project planning
    • Leus, R., and W. Herroelen. 2004. "Stability and Resource Allocation in Project Planning." IIE Transactions 36 (7): 667-682.
    • (2004) IIE Transactions , vol.36 , Issue.7 , pp. 667-682
    • Leus, R.1    Herroelen, W.2
  • 38
    • 0022746883 scopus 로고
    • Resource-constrained assignment scheduling
    • Mazzola, J., and A. Neebe. 1986. "Resource-Constrained Assignment Scheduling." Operations Research 34 (4): 560-572.
    • (1986) Operations Research , vol.34 , Issue.4 , pp. 560-572
    • Mazzola, J.1    Neebe, A.2
  • 39
    • 0033324669 scopus 로고    scopus 로고
    • Set partitioning approach to the crew scheduling problem
    • Mingozzi, A., M. A. Boschetti, S. Ricciardelli, and L. Bianco. 1999. "A Set Partitioning Approach to the Crew-Scheduling Problem." Operations Research 47 (6): 873-888. (Pubitemid 30594274)
    • (1999) Operations Research , vol.47 , Issue.6 , pp. 873-888
    • Mingozzi, A.1    Boschetti, M.A.2    Ricciardelli, S.3    Bianco, L.4
  • 40
    • 80051717728 scopus 로고    scopus 로고
    • A multi-objective flow shop scheduling with resource-dependent processing times: Trade-off between makespan and cost of resources
    • Mokhtari, H., I. N. K. Abadia, and A. Cheraghalikhani. 2011. "A Multi-Objective Flow Shop Scheduling with Resource-Dependent Processing Times: Trade-Off between Makespan and Cost of Resources." International Journal of Production Research 49 (19): 5851-5875.
    • (2011) International Journal of Production Research , vol.49 , Issue.19 , pp. 5851-5875
    • Mokhtari, H.1    Abadia, I.N.K.2    Cheraghalikhani, A.3
  • 41
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
    • Moon, C., J. S. Kim, and M. Gen. 2004. "Advanced Planning and Scheduling Based on Precedence and Resource Constraints for E-Plant Chains." International Journal of Production Research 42 (15): 2941-2955.
    • (2004) International Journal of Production Research , vol.42 , Issue.15 , pp. 2941-2955
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 43
    • 79959750242 scopus 로고    scopus 로고
    • Risk approaches for delivering disaster relief supplies
    • Nolz, P. C., F. Semet, and K. F. Doerner. 2011. "Risk Approaches for Delivering Disaster Relief Supplies." OR Spectrum 33 (3): 543-569.
    • (2011) OR Spectrum , vol.33 , Issue.3 , pp. 543-569
    • Nolz, P.C.1    Semet, F.2    Doerner, K.F.3
  • 44
    • 0030830501 scopus 로고    scopus 로고
    • Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
    • Nudtasomboon, N., and S. Randhawa. 1997. "Resource-Constrained Project Scheduling with Renewable and Non-Renewable Resources and Time-Resource Tradeoffs." Computers & Industrial Engineering 32 (1): 227-242. (Pubitemid 127422482)
    • (1997) Computers and Industrial Engineering , vol.32 , Issue.1 , pp. 227-242
    • Nudtasomboon, N.1    Randhawa, S.U.2
  • 45
    • 0035878033 scopus 로고    scopus 로고
    • Optimizing the multiple constrained resources product mix problem using genetic algorithms
    • DOI 10.1080/00207540010001000
    • Onwubolu, G. C., and M. Mutingi. 2001. "Optimizing the Multiple Constrained Resources Product Mix Problem Using Genetic Algorithms." International Journal of Production Research 39 (9): 1897-1910. (Pubitemid 35165598)
    • (2001) International Journal of Production Research , vol.39 , Issue.9 , pp. 1897-1910
    • Onwubolu, G.C.1    Muting, M.2
  • 46
    • 3042795375 scopus 로고    scopus 로고
    • Emergency logistics planning in natural disasters
    • Ozdamar, L., E. Ekinci, and B. Kucukyazici. 2004. "Emergency Logistics Planning in Natural Disasters." Annals of Operations Research 129 (1-4): 217-245. (Pubitemid 38892383)
    • (2004) Annals of Operations Research , vol.129 , Issue.1-4 , pp. 217-245
    • Ozdamar, L.1    Ekinci, E.2    Kucukyazici, B.3
  • 47
    • 79551649325 scopus 로고    scopus 로고
    • A grasp algorithm for flexible job-shop scheduling problem with limited resource constraints
    • Rajkumar, M., P. Asokan, N. Anilkumar, and T. Page. 2011. "A GRASP Algorithm for Flexible Job-Shop Scheduling Problem with Limited Resource Constraints." International Journal of Production Research 49 (8): 2409-2423.
    • (2011) International Journal of Production Research , vol.49 , Issue.8 , pp. 2409-2423
    • Rajkumar, M.1    Asokan, P.2    Anilkumar, N.3    Page, T.4
  • 48
    • 52049097838 scopus 로고    scopus 로고
    • A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
    • Ranjbar, M., B. D. Reyck, and F. Kianfar. 2009. "A Hybrid Scatter Search for the Discrete Time/Resource Trade-Off Problem in Project Scheduling." European Journal of Operational Research 193 (1): 35-48.
    • (2009) European Journal of Operational Research , vol.193 , Issue.1 , pp. 35-48
    • Ranjbar, M.1    Reyck, B.D.2    Kianfar, F.3
  • 49
    • 37849186364 scopus 로고    scopus 로고
    • Effect of granularity of resource availability on the accuracy of due date assignment
    • DOI 10.1080/00207540600665810, PII XNM784WG420VVGQG
    • Robinson, K. R., and S. A. Moses. 2006. "Effect of Granularity of Resource Availability on the Accuracy of Due Date Assignment." International Journal of Production Research 44 (24): 5391-5414. (Pubitemid 44826004)
    • (2006) International Journal of Production Research , vol.44 , Issue.24 , pp. 5391-5414
    • Robinson, K.R.1    Moses, S.A.2
  • 50
    • 0035837944 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
    • DOI 10.1080/00207540010022368
    • Schirmer, A. 2001. "Resource-Constrained Project Scheduling: An Evaluation of Adaptive Control Schemes for Parameterized Sampling Heuristics." International Journal of Production Research 39 (7): 1343-1365. (Pubitemid 35165622)
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1343-1365
    • Schirmer, A.1
  • 51
    • 33748966612 scopus 로고    scopus 로고
    • A coordinated reverse logistics system for regional management of multi-source hazardous wastes
    • DOI 10.1016/j.cor.2005.06.009, PII S0305054805001905
    • Sheu, J.-B. 2007. "A Coordinated Reverse Logistics System for Regional Management of Multi-Source Hazardous Wastes." Computers & Operations Research 34 (5): 1442-1462. (Pubitemid 44442597)
    • (2007) Computers and Operations Research , vol.34 , Issue.5 , pp. 1442-1462
    • Sheu, J.-B.1
  • 52
    • 84861413644 scopus 로고    scopus 로고
    • A heuristic for designing manufacturing focus units with resource considerations
    • Sheu, C., L. J. Krajewski, and G. Cai. 2012. "A Heuristic for Designing Manufacturing Focus Units with Resource Considerations." International Journal of Production Research 50 (6): 1608-1623.
    • (2012) International Journal of Production Research , vol.50 , Issue.6 , pp. 1608-1623
    • Sheu, C.1    Krajewski, L.J.2    Cai, G.3
  • 53
    • 0032783798 scopus 로고    scopus 로고
    • Simultaneous versus sequential scheduling of multiple resources which constrain system throughput
    • Simons, J. V., Jr., M. D. Stephens, and W. P. Simpson, III. 1999. "Simultaneous versus Sequential Scheduling of Multiple Resources Which Constrain System Throughput." International Journal of Production Research 37 (1): 21-33.
    • (1999) International Journal of Production Research , vol.37 , Issue.1 , pp. 21-33
    • Simons Jr., J.V.1    Stephens, M.D.2    Simpson III, W.P.3
  • 54
    • 0242364615 scopus 로고    scopus 로고
    • An efficient multi-pass heuristic for project scheduling with constrained resources
    • Tormos, P., and A. Lova. 2003. "An Efficient Multi-Pass Heuristic for Project Scheduling with Constrained Resources." International Journal of Production Research 41 (5): 1071-1086.
    • (2003) International Journal of Production Research , vol.41 , Issue.5 , pp. 1071-1086
    • Tormos, P.1    Lova, A.2
  • 55
    • 29344454950 scopus 로고    scopus 로고
    • The trade-off between stability and makespan in resource-constrained project scheduling
    • DOI 10.1080/00207540500140914, PII U733757212136
    • Van de Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2006. "The Trade-Off between Stability and Makespan in Resource-Constrained Project Scheduling." International Journal of Production Research 44 (2): 215-236. (Pubitemid 43000404)
    • (2006) International Journal of Production Research , vol.44 , Issue.2 , pp. 215-236
    • Van De Vonder, S.1    Demeulemeester, E.2    Herroelen, W.3    Leus, R.4
  • 56
    • 0035617606 scopus 로고    scopus 로고
    • An exact procedure for the resource-constrained weighted earliness- tardiness project scheduling problem
    • Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001a. "An Exact Procedure for the Resource-Constrained Weighted Earliness- Tardiness Project Scheduling Problem." Annals of Operations Research 102 (1-4): 179-196.
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 179-196
    • Vanhoucke, M.1    Demeulemeester, E.2    Herroelen, W.3
  • 57
    • 0035435965 scopus 로고    scopus 로고
    • On maximizing the net present value of a project under renewable resource constraints
    • Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001b. "On Maximizing the Net Present Value of a Project under Renewable Resource Constraints." Management Science 47 (8): 1113-1121. (Pubitemid 34192809)
    • (2001) Management Science , vol.47 , Issue.8 , pp. 1113-1121
    • Vanhoucke, M.1    Demeulemeester, E.2    Herroelen, W.3
  • 58
    • 84871252419 scopus 로고    scopus 로고
    • A joint production scheduling approach considering multiple resources and preventive maintenance tasks
    • Wong, C. S., F. T. S. Chan, and S. H. Chung. 2012. "A Joint Production Scheduling Approach Considering Multiple Resources and Preventive Maintenance Tasks." International Journal of Production Research 51 (3): 883-896.
    • (2012) International Journal of Production Research , vol.51 , Issue.3 , pp. 883-896
    • Wong, C.S.1    Chan, F.T.S.2    Chung, S.H.3
  • 59
    • 33845387482 scopus 로고    scopus 로고
    • A survey of operations research models and applications in Homeland Security
    • DOI 10.1287/inte.1060.0253
    • Wright, P., M. Liberatore, and R. Nydick. 2006. "A Survey of Operations Research Models and Applications in Homeland Security." Interfaces 36 (6): 514-529. (Pubitemid 44905061)
    • (2006) Interfaces , vol.36 , Issue.6 , pp. 514-529
    • Wright, P.D.1    Liberatore, M.J.2    Nydick, R.L.3
  • 60
    • 34548513268 scopus 로고    scopus 로고
    • Ant colony optimization for disaster relief operations
    • DOI 10.1016/j.tre.2006.05.004, PII S136655450700021X, Challenges of Emergency Logistics Management
    • Yi, W., and A. Kumar. 2007. "Ant Colony Optimization for Disaster Relief Operations." Transportation Research Part E: Logistics and Transportation Review 43 (6): 660-672. (Pubitemid 47371970)
    • (2007) Transportation Research Part E: Logistics and Transportation Review , vol.43 , Issue.6 , pp. 660-672
    • Yi, W.1    Kumar, A.2
  • 61
    • 60549097204 scopus 로고    scopus 로고
    • Path selection model and algorithm for emergency logistics management
    • Yuan, Y., and D. Wang. 2009. "Path Selection Model and Algorithm for Emergency Logistics Management." Computers & Industrial Engineering 56 (3): 1081-1094.
    • (2009) Computers & Industrial Engineering , vol.56 , Issue.3 , pp. 1081-1094
    • Yuan, Y.1    Wang, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.