Modeling integrated supply chain logistics in real-time large-scale disaster relief operations
-
Afshar, A., and A. Haghani. 2012. "Modeling Integrated Supply Chain Logistics in Real-time Large-scale Disaster Relief Operations." Socio-Economic Planning Sciences 46 (4): 327-338.
-
(2012)
Socio-Economic Planning Sciences
, vol.46
, Issue.4
, pp. 327-338
-
-
Afshar, A.1
Haghani, A.2
-
2
-
-
0025417561
-
Faster algorithms for the shortest path problem
-
DOI 10.1145/77600.77615
-
Ahuja, R. K., K. Mehlhorn, J. Orlin, and R. E. Tarjan. 1990. "Faster Algorithms for the Shortest Path Problem." Journal of the ACM 37 (2): 213-223. (Pubitemid 20696133)
-
(1990)
Journal of the ACM
, vol.37
, Issue.2
, pp. 213-223
-
-
Ahuja Ravindra, K.1
Mehlhorn Kurt2
Orlin James, B.3
Tarjan Robert, E.4
-
4
-
-
0031187330
-
Job shop scheduling with delay-renewable resources: A comparison of decomposition strategies
-
Alfieri, A., and P. Brandimarte. 1997. "Job Shop Scheduling with Delay-Renewable Resources: A Comparison of Decomposition Strategies." International Journal of Production Research 35 (7): 1807-1823. (Pubitemid 127549697)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.7
, pp. 1807-1823
-
-
Alfieri, A.1
Brandimarte, P.2
-
6
-
-
70449585390
-
Multi-objective resource assignment problem in a product-driven supply chain using a taguchi-based dna algorithm
-
Bachlaus, M., M. K. Tiwarib, and F. T. S. Chan. 2009. "Multi-objective Resource Assignment Problem in a Product-Driven Supply Chain Using a Taguchi-based DNA Algorithm." International Journal of Production Research 47 (9): 2345-2371.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.9
, pp. 2345-2371
-
-
Bachlaus, M.1
Tiwarib, M.K.2
Chan, F.T.S.3
-
8
-
-
47549089514
-
Last mile distribution in humanitarian relief
-
DOI 10.1080/15472450802023329, PII 792813477
-
Balcik, B., B. M. Beamon, and K. Smilowitz. 2008. "Last Mile Distribution in Humanitarian Relief." Journal of Intelligent Transportation Systems 12 (2): 51-63. (Pubitemid 352006490)
-
(2008)
Journal of Intelligent Transportation Systems: Technology, Planning, and Operations
, vol.12
, Issue.2
, pp. 51-63
-
-
Balcik, B.1
Beamon, B.M.2
Smilowitz, K.3
-
9
-
-
77955708654
-
Coordination in humanitarian relief chains: Practices, challenges and opportunities
-
Balcik, B., B. M. Beamon, C. C. Krejci, K. M. Muramatsu, and M. Ramirez. 2010. "Coordination in Humanitarian Relief Chains: Practices, Challenges and Opportunities." International Journal of Production Economics 126 (1): 22-34.
-
(2010)
International Journal of Production Economics
, vol.126
, Issue.1
, pp. 22-34
-
-
Balcik, B.1
Beamon, B.M.2
Krejci, C.C.3
Muramatsu, K.M.4
Ramirez, M.5
-
10
-
-
53349118245
-
An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
-
Ballestin, F., and N. Trautmann. 2008. "An Iterated-local-search Heuristic for the Resource-constrained Weighted Earliness-Tardiness Project Scheduling Problem." International Journal of Production Research 46 (22): 6231-6249.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.22
, pp. 6231-6249
-
-
Ballestin, F.1
Trautmann, N.2
-
11
-
-
18144452822
-
Project scheduling under partially renewable resource constraints
-
Bottcher, J., A. Drexl, R. Kolisch, and F. Salewski. 1999. "Project Scheduling under Partially Renewable Resource Constraints." Management Science 45 (4): 543-559.
-
(1999)
Management Science
, vol.45
, Issue.4
, pp. 543-559
-
-
Bottcher, J.1
Drexl, A.2
Kolisch, R.3
Salewski, F.4
-
12
-
-
46449101715
-
A faster polynomial algorithm for the unbalanced hitchcock transportation problem
-
Brenner, U. 2008. "A Faster Polynomial Algorithm for the Unbalanced Hitchcock Transportation Problem." Operations Research Letters 36 (4): 408-413.
-
(2008)
Operations Research Letters
, vol.36
, Issue.4
, pp. 408-413
-
-
Brenner, U.1
-
13
-
-
0030125537
-
Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
-
Brucker, P., and A. Kramer. 1996. "Polynomial Algorithms for Resource-constrained and Multiprocessor Task Scheduling Problems." European Journal of Operational Research 90 (2): 214-226. (Pubitemid 126652210)
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 214-226
-
-
Brucker, P.1
Kramer, A.2
-
14
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P., A. Drexl, R. Möhring, K. Neumann, and E. Pesch. 1999. "Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods." European Journal of Operational Research 112 (1): 3-41.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
17
-
-
84155169077
-
Optimization models in emergency logistics: A literature review
-
Caunhye, A., X. Nie, and S. Pokharel. 2012. "Optimization Models in Emergency Logistics: A Literature Review." Socio-Economic Planning Sciences 46 (1): 4-13.
-
(2012)
Socio-Economic Planning Sciences
, vol.46
, Issue.1
, pp. 4-13
-
-
Caunhye, A.1
Nie, X.2
Pokharel, S.3
-
18
-
-
36248981989
-
Scheduling of unrelated parallel manufacturing cells with limited human resources
-
DOI 10.1080/00207540601138452, PII 777073224, Selected papers from the 2nd Group Technology/Cellular Manufacturing World Symposium
-
Celano, G., A. Costa, and S. Fichera. 2008. "Scheduling of Unrelated Parallel Manufacturing Cells with Limited Human Resources." International Journal of Production Research 46 (2): 405-427. (Pubitemid 350136916)
-
(2008)
International Journal of Production Research
, vol.46
, Issue.2
, pp. 405-427
-
-
Celano, G.1
Costa, A.2
Fichera, S.3
-
20
-
-
33745123677
-
Research on resources optimisation deployment model and algorithm for collaborative manufacturing process
-
DOI 10.1080/00207540500478520, PII J4802150071653
-
Changfeng, Y., Z. Dinghua, P. Wenli, and B. Kun. 2006. "Research on Resources Optimization Deployment Model and Algorithm for Collaborative Manufacturing Process." International Journal of Production Research 44 (16): 3279-3301. (Pubitemid 43898324)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.16
, pp. 3279-3301
-
-
Changfeng, Y.1
Dinghua, Z.2
Wenli, P.3
Kun, B.4
-
21
-
-
38549091692
-
A decomposition-based genetic algorithm for the resource-constrained project-scheduling problem
-
DOI 10.1287/opre.1060.0358
-
Debels, D., and M. Vanhoucke. 2007. "A Decomposition-based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem." Operations Research 55 (3): 457-469. (Pubitemid 351159503)
-
(2007)
Operations Research
, vol.55
, Issue.3
, pp. 457-469
-
-
Debels, D.1
Vanhoucke, M.2
-
22
-
-
34047139878
-
Robust resource allocation decisions in resource- constrained projects
-
Deblaere, F., E. Demeulemeester, W. Herroelen, and S. Van de Vonder. 2007. "Robust Resource Allocation Decisions in Resource- Constrained Projects." Decision Sciences 38 (1): 5-37.
-
(2007)
Decision Sciences
, vol.38
, Issue.1
, pp. 5-37
-
-
Deblaere, F.1
Demeulemeester, E.2
Herroelen, W.3
Vonder De S.Van4
-
24
-
-
79959723302
-
Proactive policies for the stochastic resource-constrained project scheduling problem
-
Deblaere, F., E. Demeulemeester, and W. Herroelen. 2011b. "Proactive Policies for the Stochastic Resource-Constrained Project Scheduling Problem." European Journal of Operational Research 214 (2): 308-316.
-
(2011)
European Journal of Operational Research
, vol.214
, Issue.2
, pp. 308-316
-
-
Deblaere, F.1
Demeulemeester, E.2
Herroelen, W.3
-
25
-
-
0035922493
-
A simple and effective heuristic for the resource constrained project scheduling problem
-
DOI 10.1080/00207540110060608
-
Depuy, G. W., and G. E. Whitehouse. 2001. "A Simple and Effective Heuristic for the Resource Constrained Project-Scheduling Problem." International Journal of Production Research 39 (14): 3275-3287. (Pubitemid 35165542)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.14
, pp. 3275-3287
-
-
DePuy, G.W.1
Whitehouse, G.E.2
-
26
-
-
0032073129
-
Incorporating human resources in group technology/cellular manufacturing
-
Eckstein, A. L. H., and T. R. Rohleder. 1998. "Incorporating Human Resources in Group Technology/Cellular Manufacturing." International Journal of Production Research 36 (5): 1199-1222. (Pubitemid 128553195)
-
(1998)
International Journal of Production Research
, vol.36
, Issue.5
, pp. 1199-1222
-
-
Eckstein, A.L.H.1
Rohleder, T.R.2
-
27
-
-
85055302407
-
Coordination in the great lakes
-
September, 23-24
-
Fenton, G. 2003. "Coordination in the Great Lakes." Forced Migration Review, September, 23-24.
-
(2003)
Forced Migration Review
-
-
Fenton, G.1
-
29
-
-
0030143384
-
Formulation and solution of a multi-commodity, multi-modal network flow model for disaster relief operations
-
DOI 10.1016/0965-8564(95)00020-8
-
Haghani, A., and S. C. Oh. 1996. "Formulation and Solution of a Multi-commodity, Multi-modal Network Flow Model for Disaster Relief Operations." Transportation Research Part A: Policy and Practice 30 (3): 231-250. (Pubitemid 126404265)
-
(1996)
Transportation Research Part A: Policy and Practice
, vol.30
, Issue.3
, pp. 231-250
-
-
Haghani, A.1
Oh, S.-C.2
-
30
-
-
77953872383
-
A survey of variants and extensions of the resource-constrained project scheduling problem
-
Hartmann, S., and D. Briskorn. 2010. "A Survey of Variants and Extensions of the Resource-Constrained Project Scheduling Problem." European Journal of Operational Research 207 (1): 1-14.
-
(2010)
European Journal of Operational Research
, vol.207
, Issue.1
, pp. 1-14
-
-
Hartmann, S.1
Briskorn, D.2
-
31
-
-
80054121880
-
Models for relief routing: Equity, efficiency and efficacy
-
Huang, M., K. Smilowitz, and B. Balcik. 2012. "Models for Relief Routing: Equity, Efficiency and Efficacy." Transportation Research Part E 48 (1): 2-18.
-
(2012)
Transportation Research Part e
, vol.48
, Issue.1
, pp. 2-18
-
-
Huang, M.1
Smilowitz, K.2
Balcik, B.3
-
32
-
-
0242364622
-
Dynamic approach to human resources planning for major professional companies with a peak-wise demand
-
Hwang, N.-C., and K. Kogan. 2003. "Dynamic Approach to Human Resources Planning for Major Professional Companies with a Peak-Wise Demand." International Journal of Production Research 41 (6): 1255-1271.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.6
, pp. 1255-1271
-
-
Hwang, N.-C.1
Kogan, K.2
-
33
-
-
84859963108
-
The multi-resource agent bottleneck generalized assignment problem
-
Karsu, O., and M. Azizoglu. 2012. "The Multi-Resource Agent Bottleneck Generalized Assignment Problem." International Journal of Production Research 50 (2): 309-324.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.2
, pp. 309-324
-
-
Karsu, O.1
Azizoglu, M.2
-
34
-
-
0034634797
-
Project scheduling with time-varying resource constraints
-
DOI 10.1080/00207540050176094
-
Klein, R. 2000. "Project Scheduling with Time-varying Resource Constraints." International Journal of Production Research 38 (16): 3937-3952. (Pubitemid 35401939)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.16
, pp. 3937-3952
-
-
Klein, R.1
-
35
-
-
0035637004
-
Multiple-project scheduling with controllable project duration and hard resource constraint: Some solvable cases
-
Lee, C.-Y., and L. Lei. 2001. "Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases." Annals of Operations Research 102 (1-4): 287-307.
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 287-307
-
-
Lee, C.-Y.1
Lei, L.2
-
36
-
-
0000482108
-
Scheduling jobs on parallel machines with sequence-dependent setup times
-
Lee, Y. H., and M. Pinedo. 1997. "Scheduling Jobs on Parallel Machines with Sequence Dependent Setup Times." European Journal of Operational Research 100 (3): 464-474. (Pubitemid 127392370)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.3
, pp. 464-474
-
-
Lee, Y.H.1
Pinedo, M.2
-
37
-
-
2942687563
-
Stability and resource allocation in project planning
-
Leus, R., and W. Herroelen. 2004. "Stability and Resource Allocation in Project Planning." IIE Transactions 36 (7): 667-682.
-
(2004)
IIE Transactions
, vol.36
, Issue.7
, pp. 667-682
-
-
Leus, R.1
Herroelen, W.2
-
38
-
-
0022746883
-
Resource-constrained assignment scheduling
-
Mazzola, J., and A. Neebe. 1986. "Resource-Constrained Assignment Scheduling." Operations Research 34 (4): 560-572.
-
(1986)
Operations Research
, vol.34
, Issue.4
, pp. 560-572
-
-
Mazzola, J.1
Neebe, A.2
-
39
-
-
0033324669
-
Set partitioning approach to the crew scheduling problem
-
Mingozzi, A., M. A. Boschetti, S. Ricciardelli, and L. Bianco. 1999. "A Set Partitioning Approach to the Crew-Scheduling Problem." Operations Research 47 (6): 873-888. (Pubitemid 30594274)
-
(1999)
Operations Research
, vol.47
, Issue.6
, pp. 873-888
-
-
Mingozzi, A.1
Boschetti, M.A.2
Ricciardelli, S.3
Bianco, L.4
-
40
-
-
80051717728
-
A multi-objective flow shop scheduling with resource-dependent processing times: Trade-off between makespan and cost of resources
-
Mokhtari, H., I. N. K. Abadia, and A. Cheraghalikhani. 2011. "A Multi-Objective Flow Shop Scheduling with Resource-Dependent Processing Times: Trade-Off between Makespan and Cost of Resources." International Journal of Production Research 49 (19): 5851-5875.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.19
, pp. 5851-5875
-
-
Mokhtari, H.1
Abadia, I.N.K.2
Cheraghalikhani, A.3
-
41
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
-
Moon, C., J. S. Kim, and M. Gen. 2004. "Advanced Planning and Scheduling Based on Precedence and Resource Constraints for E-Plant Chains." International Journal of Production Research 42 (15): 2941-2955.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.15
, pp. 2941-2955
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
43
-
-
79959750242
-
Risk approaches for delivering disaster relief supplies
-
Nolz, P. C., F. Semet, and K. F. Doerner. 2011. "Risk Approaches for Delivering Disaster Relief Supplies." OR Spectrum 33 (3): 543-569.
-
(2011)
OR Spectrum
, vol.33
, Issue.3
, pp. 543-569
-
-
Nolz, P.C.1
Semet, F.2
Doerner, K.F.3
-
44
-
-
0030830501
-
Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs
-
Nudtasomboon, N., and S. Randhawa. 1997. "Resource-Constrained Project Scheduling with Renewable and Non-Renewable Resources and Time-Resource Tradeoffs." Computers & Industrial Engineering 32 (1): 227-242. (Pubitemid 127422482)
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.1
, pp. 227-242
-
-
Nudtasomboon, N.1
Randhawa, S.U.2
-
45
-
-
0035878033
-
Optimizing the multiple constrained resources product mix problem using genetic algorithms
-
DOI 10.1080/00207540010001000
-
Onwubolu, G. C., and M. Mutingi. 2001. "Optimizing the Multiple Constrained Resources Product Mix Problem Using Genetic Algorithms." International Journal of Production Research 39 (9): 1897-1910. (Pubitemid 35165598)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.9
, pp. 1897-1910
-
-
Onwubolu, G.C.1
Muting, M.2
-
46
-
-
3042795375
-
Emergency logistics planning in natural disasters
-
Ozdamar, L., E. Ekinci, and B. Kucukyazici. 2004. "Emergency Logistics Planning in Natural Disasters." Annals of Operations Research 129 (1-4): 217-245. (Pubitemid 38892383)
-
(2004)
Annals of Operations Research
, vol.129
, Issue.1-4
, pp. 217-245
-
-
Ozdamar, L.1
Ekinci, E.2
Kucukyazici, B.3
-
47
-
-
79551649325
-
A grasp algorithm for flexible job-shop scheduling problem with limited resource constraints
-
Rajkumar, M., P. Asokan, N. Anilkumar, and T. Page. 2011. "A GRASP Algorithm for Flexible Job-Shop Scheduling Problem with Limited Resource Constraints." International Journal of Production Research 49 (8): 2409-2423.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.8
, pp. 2409-2423
-
-
Rajkumar, M.1
Asokan, P.2
Anilkumar, N.3
Page, T.4
-
48
-
-
52049097838
-
A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
-
Ranjbar, M., B. D. Reyck, and F. Kianfar. 2009. "A Hybrid Scatter Search for the Discrete Time/Resource Trade-Off Problem in Project Scheduling." European Journal of Operational Research 193 (1): 35-48.
-
(2009)
European Journal of Operational Research
, vol.193
, Issue.1
, pp. 35-48
-
-
Ranjbar, M.1
Reyck, B.D.2
Kianfar, F.3
-
49
-
-
37849186364
-
Effect of granularity of resource availability on the accuracy of due date assignment
-
DOI 10.1080/00207540600665810, PII XNM784WG420VVGQG
-
Robinson, K. R., and S. A. Moses. 2006. "Effect of Granularity of Resource Availability on the Accuracy of Due Date Assignment." International Journal of Production Research 44 (24): 5391-5414. (Pubitemid 44826004)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.24
, pp. 5391-5414
-
-
Robinson, K.R.1
Moses, S.A.2
-
50
-
-
0035837944
-
Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics
-
DOI 10.1080/00207540010022368
-
Schirmer, A. 2001. "Resource-Constrained Project Scheduling: An Evaluation of Adaptive Control Schemes for Parameterized Sampling Heuristics." International Journal of Production Research 39 (7): 1343-1365. (Pubitemid 35165622)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1343-1365
-
-
Schirmer, A.1
-
51
-
-
33748966612
-
A coordinated reverse logistics system for regional management of multi-source hazardous wastes
-
DOI 10.1016/j.cor.2005.06.009, PII S0305054805001905
-
Sheu, J.-B. 2007. "A Coordinated Reverse Logistics System for Regional Management of Multi-Source Hazardous Wastes." Computers & Operations Research 34 (5): 1442-1462. (Pubitemid 44442597)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.5
, pp. 1442-1462
-
-
Sheu, J.-B.1
-
52
-
-
84861413644
-
A heuristic for designing manufacturing focus units with resource considerations
-
Sheu, C., L. J. Krajewski, and G. Cai. 2012. "A Heuristic for Designing Manufacturing Focus Units with Resource Considerations." International Journal of Production Research 50 (6): 1608-1623.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.6
, pp. 1608-1623
-
-
Sheu, C.1
Krajewski, L.J.2
Cai, G.3
-
53
-
-
0032783798
-
Simultaneous versus sequential scheduling of multiple resources which constrain system throughput
-
Simons, J. V., Jr., M. D. Stephens, and W. P. Simpson, III. 1999. "Simultaneous versus Sequential Scheduling of Multiple Resources Which Constrain System Throughput." International Journal of Production Research 37 (1): 21-33.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.1
, pp. 21-33
-
-
Simons Jr., J.V.1
Stephens, M.D.2
Simpson III, W.P.3
-
54
-
-
0242364615
-
An efficient multi-pass heuristic for project scheduling with constrained resources
-
Tormos, P., and A. Lova. 2003. "An Efficient Multi-Pass Heuristic for Project Scheduling with Constrained Resources." International Journal of Production Research 41 (5): 1071-1086.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.5
, pp. 1071-1086
-
-
Tormos, P.1
Lova, A.2
-
55
-
-
29344454950
-
The trade-off between stability and makespan in resource-constrained project scheduling
-
DOI 10.1080/00207540500140914, PII U733757212136
-
Van de Vonder, S., E. Demeulemeester, W. Herroelen, and R. Leus. 2006. "The Trade-Off between Stability and Makespan in Resource-Constrained Project Scheduling." International Journal of Production Research 44 (2): 215-236. (Pubitemid 43000404)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.2
, pp. 215-236
-
-
Van De Vonder, S.1
Demeulemeester, E.2
Herroelen, W.3
Leus, R.4
-
56
-
-
0035617606
-
An exact procedure for the resource-constrained weighted earliness- tardiness project scheduling problem
-
Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001a. "An Exact Procedure for the Resource-Constrained Weighted Earliness- Tardiness Project Scheduling Problem." Annals of Operations Research 102 (1-4): 179-196.
-
(2001)
Annals of Operations Research
, vol.102
, Issue.1-4
, pp. 179-196
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
57
-
-
0035435965
-
On maximizing the net present value of a project under renewable resource constraints
-
Vanhoucke, M., E. Demeulemeester, and W. Herroelen. 2001b. "On Maximizing the Net Present Value of a Project under Renewable Resource Constraints." Management Science 47 (8): 1113-1121. (Pubitemid 34192809)
-
(2001)
Management Science
, vol.47
, Issue.8
, pp. 1113-1121
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
58
-
-
84871252419
-
A joint production scheduling approach considering multiple resources and preventive maintenance tasks
-
Wong, C. S., F. T. S. Chan, and S. H. Chung. 2012. "A Joint Production Scheduling Approach Considering Multiple Resources and Preventive Maintenance Tasks." International Journal of Production Research 51 (3): 883-896.
-
(2012)
International Journal of Production Research
, vol.51
, Issue.3
, pp. 883-896
-
-
Wong, C.S.1
Chan, F.T.S.2
Chung, S.H.3
-
59
-
-
33845387482
-
A survey of operations research models and applications in Homeland Security
-
DOI 10.1287/inte.1060.0253
-
Wright, P., M. Liberatore, and R. Nydick. 2006. "A Survey of Operations Research Models and Applications in Homeland Security." Interfaces 36 (6): 514-529. (Pubitemid 44905061)
-
(2006)
Interfaces
, vol.36
, Issue.6
, pp. 514-529
-
-
Wright, P.D.1
Liberatore, M.J.2
Nydick, R.L.3
-
60
-
-
34548513268
-
Ant colony optimization for disaster relief operations
-
DOI 10.1016/j.tre.2006.05.004, PII S136655450700021X, Challenges of Emergency Logistics Management
-
Yi, W., and A. Kumar. 2007. "Ant Colony Optimization for Disaster Relief Operations." Transportation Research Part E: Logistics and Transportation Review 43 (6): 660-672. (Pubitemid 47371970)
-
(2007)
Transportation Research Part E: Logistics and Transportation Review
, vol.43
, Issue.6
, pp. 660-672
-
-
Yi, W.1
Kumar, A.2
-
61
-
-
60549097204
-
Path selection model and algorithm for emergency logistics management
-
Yuan, Y., and D. Wang. 2009. "Path Selection Model and Algorithm for Emergency Logistics Management." Computers & Industrial Engineering 56 (3): 1081-1094.
-
(2009)
Computers & Industrial Engineering
, vol.56
, Issue.3
, pp. 1081-1094
-
-
Yuan, Y.1
Wang, D.2
|