메뉴 건너뛰기




Volumn 37, Issue 1, 1999, Pages 21-33

Simultaneous versus sequential scheduling of multiple resources which constrain system throughput

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; BENCHMARKING; COMPUTER SOFTWARE; CONSTRAINT THEORY; THROUGHPUT;

EID: 0032783798     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/002075499191896     Document Type: Article
Times cited : (7)

References (41)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E. and Zawack, D., 1988, The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 5
    • 21544449985 scopus 로고    scopus 로고
    • March
    • Buyer’s Guide, 1996, IIE Solutions, March, 44-52.
    • (1996) IIE Solutions , pp. 44-52
  • 6
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due-date determination decisions
    • Cheng, T. C. E. and Gupta, M. C., 1989, Survey of scheduling research involving due-date determination decisions. European Journal of Operational Research, 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 11
    • 0000372287 scopus 로고
    • An analysis and discussion of the optimized production technology software and its use
    • Fry, T. D., Cox, J. F. and Blackstone, J. H., Jr., 1992, An analysis and discussion of the optimized production technology software and its use. Production and Operations Management, 1, 229-242.
    • (1992) Production and Operations Management , vol.1 , pp. 229-242
    • Fry, T.D.1    Cox, J.F.2    Blackstone, J.H.3
  • 14
    • 0003710588 scopus 로고
    • Croton-on-Hudson, NY: North River Press)
    • Goldratt, E. M. and Fox, R. E., 1986, The Race (Croton-on-Hudson, NY: North River Press).
    • (1986) The Race
    • Goldratt, E.M.1    Fox, R.E.2
  • 18
  • 19
    • 21544454370 scopus 로고    scopus 로고
    • My saga to improve production (Part two)
    • Goldratt, E. M., 1996b, My saga to improve production (Part two). APICS—The Performance Advantage, 6, 34—36.
    • (1996) APICS—The Performance Advantage , vol.6 , pp. 34-36
    • Goldratt, E.M.1
  • 20
    • 0019585243 scopus 로고
    • A review of production scheduling
    • Graves, S. C., 1981, A review of production scheduling. Operations Research, 29, 646-675.
    • (1981) Operations Research , vol.29 , pp. 646-675
    • Graves, S.C.1
  • 21
    • 0343291610 scopus 로고
    • Goldratt & Fox: Revolutionizing the factory floor
    • Jayson, S., 1987, Goldratt & Fox: revolutionizing the factory floor. Management Accounting, 18-22.
    • (1987) Management Accounting , pp. 18-22
    • Jayson, S.1
  • 22
  • 24
    • 0000062028 scopus 로고
    • An n-job, one machine sequencing algorithm for minimising the number of late jobs
    • Moore, J. M., 1968, An n-job, one machine sequencing algorithm for minimising the number of late jobs. Management Science, 15, 102-109.
    • (1968) Management Science , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 25
    • 0003091893 scopus 로고
    • What makes the Toyota production system really tick?
    • January
    • Monden, Y., 1981, What makes the Toyota production system really tick? Journal of Industrial Engineering, January, 36-46.
    • (1981) Journal of Industrial Engineering , pp. 36-46
    • Monden, Y.1
  • 28
    • 0027912256 scopus 로고
    • Optimizing theory of constraints when multiple constrained resources exist
    • Plenert, G., 1993, Optimizing theory of constraints when multiple constrained resources exist. European Journal of Operational Research, 70, 126-133.
    • (1993) European Journal of Operational Research , vol.70 , pp. 126-133
    • Plenert, G.1
  • 30
    • 0026954688 scopus 로고
    • The missing link between manufacturing strategy and production planning
    • Ronen, B. and Rozen, E., 1992, The missing link between manufacturing strategy and production planning. International Journal of Production Research, 30, 2659-2681.
    • (1992) International Journal of Production Research , vol.30 , pp. 2659-2681
    • Ronen, B.1    Rozen, E.2
  • 31
    • 0025657214 scopus 로고
    • Synchronized manufacturing as in OPT: From practice to theory
    • Ronen, B. and Starr, M. K., 1990, Synchronized manufacturing as in OPT: from practice to theory. Computers and Industrial Engineering, 18, 585-600.
    • (1990) Computers and Industrial Engineering , vol.18 , pp. 585-600
    • Ronen, B.1    Starr, M.K.2
  • 34
    • 0002673047 scopus 로고    scopus 로고
    • An exposition of multiple constraint scheduling as implemented in the GOAL SYSTEM (Formerly DISASTER™)
    • Simons, J. V., Jr. and Simpson, W. P., I. Ill, 1997, An exposition of multiple constraint scheduling as implemented in the GOAL SYSTEM (formerly DISASTER™). Production and Operations Management, 6, 3-22.
    • (1997) Production and Operations Management , vol.6 , pp. 3-22
    • Simons, J.V.1    Simpson, W.P.2    Ill, I.3
  • 36
    • 0001562309 scopus 로고
    • Stochastic unpaced line design: Review and further experimental results
    • Smunt, T. L. and Perkins, W. C., 1985, Stochastic unpaced line design: review and further experimental results. Journal of Operations Management, 5, 351-373.
    • (1985) Journal of Operations Management , vol.5 , pp. 351-373
    • Smunt, T.L.1    Perkins, W.C.2
  • 39
    • 0040321574 scopus 로고    scopus 로고
    • The rise of finite capacity scheduling. APICS—
    • Taylor, S. G. and Bolander, S. F., 1996, The rise of finite capacity scheduling. APICS— The Performance Advantage, 6, 56.
    • (1996) The Performance Advantage , vol.6 , pp. 56
    • Taylor, S.G.1    Bolander, S.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.