메뉴 건너뛰기




Volumn 38, Issue 1, 2011, Pages 63-74

Reactive scheduling in the multi-mode RCPSP

Author keywords

MRCPSP; Project scheduling; Reactive scheduling

Indexed keywords

CONSTRAINT SATISFACTION PROBLEMS; HEURISTIC ALGORITHMS; SCHEDULING ALGORITHMS; TABU SEARCH;

EID: 78049438291     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.01.001     Document Type: Conference Paper
Times cited : (107)

References (41)
  • 1
    • 0035254136 scopus 로고    scopus 로고
    • On the paper "resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al.
    • W. Herroelen, B. De Reyck, and E. Demeulemeester On the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al. European Journal of Operational Research 128 3 2000 221 230
    • (2000) European Journal of Operational Research , vol.128 , Issue.3 , pp. 221-230
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 2
    • 0027302081 scopus 로고
    • Hierarchical models for multi-project planning and scheduling
    • M. Speranza, and C. Vercellis Hierarchical models for multi-project planning and scheduling European Journal of Operational Research 64 2 1993 312 325
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 312-325
    • Speranza, M.1    Vercellis, C.2
  • 3
    • 0027666457 scopus 로고
    • Non-preemptive multi-mode resource-constrained project scheduling
    • A. Drexl, and J. Grnewald Non-preemptive multi-mode resource-constrained project scheduling IIE Transactions 25 5 1993 74 81
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Grnewald, J.2
  • 4
    • 0030263765 scopus 로고    scopus 로고
    • A note on "hierarchical models for multi-project planning and scheduling"
    • S. Hartmann, and A. Sprecher A note on "Hierarchical models for multi-project planning and scheduling" European Journal of Operational Research 94 2 1996 377 383
    • (1996) European Journal of Operational Research , vol.94 , Issue.2 , pp. 377-383
    • Hartmann, S.1    Sprecher, A.2
  • 5
    • 33746101954 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with multiple modes
    • A. Sprecher, S. Hartmann, and A. Drexl An exact algorithm for project scheduling with multiple modes OR Spektrum 19 1997 195 203
    • (1997) OR Spektrum , vol.19 , pp. 195-203
    • Sprecher, A.1    Hartmann, S.2    Drexl, A.3
  • 6
    • 0040577754 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A comparison of exact algorithms
    • S. Hartmann, and A. Drexl Project scheduling with multiple modes: a comparison of exact algorithms Networks 32 1998 283 297 (Pubitemid 128365138)
    • (1998) Networks , vol.32 , Issue.4 , pp. 283-297
    • Hartmann, S.1    Drexl, A.2
  • 7
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • A. Sprecher, and A. Drexl Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm European Journal of Operational Research 107 2 1998 431 450
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 8
    • 0033311742 scopus 로고    scopus 로고
    • The multi-mode resource-constrained project scheduling problem with generalized precedence relations
    • B. De Reyck, and W. Herroelen The multi-mode resource-constrained project scheduling problem with generalized precedence relations European Journal of Operational Research 119 2 1999 538 556
    • (1999) European Journal of Operational Research , vol.119 , Issue.2 , pp. 538-556
    • De Reyck, B.1    Herroelen, W.2
  • 9
    • 0035612930 scopus 로고    scopus 로고
    • Project Scheduling with Multiple Modes: A Genetic Algorithm
    • DOI 10.1023/A:1010902015091
    • S. Hartmann Project scheduling with multiple modes: a genetic algorithm Annals of Operations Research 102 2001 111 135 (Pubitemid 33634389)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 111-135
    • Hartmann, S.1
  • 10
    • 0035612931 scopus 로고    scopus 로고
    • Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling
    • DOI 10.1023/A:1010954031930
    • J. Jozefowska, M. Mika, R. Rozycki, G. Waligora, and J. Weglarz Simulated annealing for multi-mode resource-constrained project scheduling Annals of Operations Research 102 2001 137 155 (Pubitemid 33634390)
    • (2001) Annals of Operations Research , vol.102 , Issue.1-4 , pp. 137-155
    • Jozefowska, J.1    Mika, M.2    Rozycki, R.3    Waligora, G.4    Weglarz, J.5
  • 11
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • J. Alcaraz, C. Maroto, and R. Ruiz Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms Journal of the Operational Research Society 54 6 2003 614 626
    • (2003) Journal of the Operational Research Society , vol.54 , Issue.6 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 12
    • 0037448273 scopus 로고    scopus 로고
    • A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags
    • R. Heilmann A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags European Journal of Operational Research 127 2 2003 348 365
    • (2003) European Journal of Operational Research , vol.127 , Issue.2 , pp. 348-365
    • Heilmann, R.1
  • 13
    • 33749155193 scopus 로고    scopus 로고
    • Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting
    • J. Buddhakulsomsiri, and D. Kim Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting European Journal of Operational Research 175 1 2006 279 295
    • (2006) European Journal of Operational Research , vol.175 , Issue.1 , pp. 279-295
    • Buddhakulsomsiri, J.1    Kim, D.2
  • 14
    • 33845522461 scopus 로고    scopus 로고
    • Multi-mode resource constrained project scheduling, priority rules and mode selection rules: Scheduling schemes
    • A. Lova, P. Tormos, and F. Barber Multi-mode resource constrained project scheduling, priority rules and mode selection rules: scheduling schemes Inteligencia artificial 30 2006 69 86
    • (2006) Inteligencia Artificial , vol.30 , pp. 69-86
    • Lova, A.1    Tormos, P.2    Barber, F.3
  • 15
    • 58949096631 scopus 로고    scopus 로고
    • An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
    • A. Lova, P. Tormos, M. Cervantes, and F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes International Journal of Production Economics 117 2 2009 302 316
    • (2009) International Journal of Production Economics , vol.117 , Issue.2 , pp. 302-316
    • Lova, A.1    Tormos, P.2    Cervantes, M.3    Barber, F.4
  • 17
    • 33748521972 scopus 로고    scopus 로고
    • A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
    • G. Zhu, J. Bard, and G. Yu A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem INFORMS Journal on Computing 18 3 2006 377 390
    • (2006) INFORMS Journal on Computing , vol.18 , Issue.3 , pp. 377-390
    • Zhu, G.1    Bard, J.2    Yu, G.3
  • 18
    • 42149186441 scopus 로고    scopus 로고
    • A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags
    • M. Sabzehparvar, and S.M. Seyed-Hosseini A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags Journal of Supercomputing 44 3 2008 257 273
    • (2008) Journal of Supercomputing , vol.44 , Issue.3 , pp. 257-273
    • Sabzehparvar, M.1    Seyed-Hosseini, S.M.2
  • 19
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • B. Jarboui, N. Damak, P. Siarry, and A. Rebai A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems Applied Mathematics and Computation 195 1 2008 299 308
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 20
    • 70349276753 scopus 로고    scopus 로고
    • A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
    • V. Van Peteghem, and M. Vanhoucke A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem European Journal of Operational Research 201 2 2010 409 418
    • (2010) European Journal of Operational Research , vol.201 , Issue.2 , pp. 409-418
    • Van Peteghem, V.1    Vanhoucke, M.2
  • 23
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • G. Vieira, J. Herrmann, and E. Lin Rescheduling manufacturing systems: a framework of strategies, policies, and methods Journal of Scheduling 6 1 2003 35 58
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 35-58
    • Vieira, G.1    Herrmann, J.2    Lin, E.3
  • 24
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • H. Aytug, M. Lawley, K. McKay, S. Mohan, and R. Uzsoy Executing production schedules in the face of uncertainties: a review and some future directions European Journal of Operational Research 161 1 2005 86 110
    • (2005) European Journal of Operational Research , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 25
    • 1542502674 scopus 로고    scopus 로고
    • Robust and reactive project scheduling: A review and classification of procedures
    • W. Herroelen, and R. Leus Robust and reactive project scheduling: a review and classification of procedures International Journal of Production Research 42 8 2004 1599 1620
    • (2004) International Journal of Production Research , vol.42 , Issue.8 , pp. 1599-1620
    • Herroelen, W.1    Leus, R.2
  • 26
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertaintysurvey and research potentials
    • W. Herroelen, and R. Leus Project scheduling under uncertaintysurvey and research potentials European Journal of Operational Research 165 2 2005 289 306
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 31
    • 40249098866 scopus 로고    scopus 로고
    • Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    • O. Lambrechts, E. Demeulemeester, and W. Herroelen Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities Journal of Scheduling 11 2 2008 121 136
    • (2008) Journal of Scheduling , vol.11 , Issue.2 , pp. 121-136
    • Lambrechts, O.1    Demeulemeester, E.2    Herroelen, W.3
  • 32
    • 15844407876 scopus 로고    scopus 로고
    • Disruption management for resource-constrained project scheduling
    • G. Zhu, J. Bard, and G. Yu Disruption management for resource-constrained project scheduling Journal of the Operational Research Society 56 4 2005 365 381
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.4 , pp. 365-381
    • Zhu, G.1    Bard, J.2    Yu, G.3
  • 33
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • E. Demeulemeester, and W. Herroelen A branch-and-bound procedure for the multiple resource-constrained project scheduling problem Management Science 38 1992 1803 1818
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 34
    • 0034311599 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks: A branch-and-bound approach
    • E. Demeulemeester, B. De Reyck, and W. Herroelen The discrete time/resource trade-off problem in project networks: a branch-and-bound approach IIE Transactions 32 2000 1059 1069
    • (2000) IIE Transactions , vol.32 , pp. 1059-1069
    • Demeulemeester, E.1    De Reyck, B.2    Herroelen, W.3
  • 35
    • 78049445879 scopus 로고    scopus 로고
    • Exact and heuristic reactive planning procedures for multi-mode resource-constrained projects
    • Katholieke Universiteit Leuven, Leuven, Belgium
    • Deblaere F, Demeulemeester E, Herroelen W. Exact and heuristic reactive planning procedures for multi-mode resource-constrained projects. Research Report KBI0818, Katholieke Universiteit Leuven, Leuven, Belgium; 2008.
    • (2008) Research Report KBI0818
    • Deblaere, F.1    Demeulemeester, E.2    Herroelen, W.3
  • 36
    • 0022129301 scopus 로고
    • Depth-first iterative-deepening: An optimal admissible tree search
    • R. Korf Depth-first iterative-deepening: an optimal admissible tree search Artificial Intelligence 27 1 1985 97 109
    • (1985) Artificial Intelligence , vol.27 , Issue.1 , pp. 97-109
    • Korf, R.1
  • 37
    • 0000411214 scopus 로고
    • Tabu search, Part I. INFORMS
    • F. Glover Tabu search, Part I. INFORMS Journal of Computing 1 1989 190 206
    • (1989) Journal of Computing , vol.1 , pp. 190-206
    • Glover, F.1
  • 38
    • 0001724713 scopus 로고
    • Tabu search, Part II. INFORMS
    • F. Glover Tabu search, Part II. INFORMS Journal of Computing 2 1990 4 32
    • (1990) Journal of Computing , vol.2 , pp. 4-32
    • Glover, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.