Heuristic algorithms for resource constrained project scheduling: A review and empirical analysis
-
edited by R. Slowinski and J. Weglarz (Amsterdam: Elsevier)
-
Alvarez-Valdes, A. and Tamarit, J. M., 1989, Heuristic algorithms for resource constrained project scheduling: A review and empirical analysis. In Advances in Project Scheduling, edited by R. Slowinski and J. Weglarz (Amsterdam: Elsevier), pp. 113-134.
-
(1989)
Advances in Project Scheduling
, pp. 113-134
-
-
Alvarez-Valdes, A.1
Tamarit, J.M.2
-
2
-
-
40849130689
-
COMSOAL: A computer method for sequencing operations for assembly lines
-
Arcus, A. L., 1966, COMSOAL: A computer method for sequencing operations for assembly lines. International Journal of Production Research, 4, 259-277.
-
(1966)
International Journal of Production Research
, vol.4
, pp. 259-277
-
-
Arcus, A.L.1
-
4
-
-
84989743918
-
A new heuristic solution method in resource constrained project scheduling problems
-
Bell, C. E. and Han, J., 1991, A new heuristic solution method in resource constrained project scheduling problems. Naval Research Logistics, 38, 315-331.
-
(1991)
Naval Research Logistics
, vol.38
, pp. 315-331
-
-
Bell, C.E.1
Han, J.2
-
5
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource constrained project scheduling
-
Boctor, F. F., 1990, Some efficient multi-heuristic procedures for resource constrained project scheduling. European Journal of Operational Research, 49, 3-13.
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 3-13
-
-
Boctor, F.F.1
-
6
-
-
0010907527
-
Priority rule search technique for resource constrained project scheduling
-
PhD dissertation. University of Central Florida, Orlando, Florida, USA
-
Brown, J. T., 1995, Priority rule search technique for resource constrained project scheduling. PhD dissertation. University of Central Florida, Orlando, Florida, USA.
-
(1995)
-
-
Brown, J.T.1
-
7
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P., Drexl, A., Mohring, R., Neumann, K. and Pesch, E., 1999, Resource-constrained project scheduling: notation, classification, models, and methods. European Journal of Operational Research, 112, 3-41.
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Mohring, R.3
Neumann, K.4
Pesch, E.5
-
8
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
Brucker, P., Knust, S., Schoo, A. and Thiele, O., 1998, A branch and bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 107, 272-288.
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
9
-
-
0023362513
-
Project scheduling with resource constraints: A branch and bound approach
-
Chrustofides, N., Alvarez-Valdes, R. and Tamarit, J. M., 1987, Project scheduling with resource constraints: a branch and bound approach. European Journal of Operational Research, 29, 262-273.
-
(1987)
European Journal of Operational Research
, vol.29
, pp. 262-273
-
-
Chrustofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
10
-
-
0016972372
-
Heuristics for scheduling resource constrained scheduling projects: An experimental investigation
-
Cooper, D. F., 1976, Heuristics for scheduling resource constrained scheduling projects: an experimental investigation. Management Science, 22, 1186-1194.
-
(1976)
Management Science
, vol.22
, pp. 1186-1194
-
-
Cooper, D.F.1
-
11
-
-
0016556599
-
Solving large single-model assembly line balancing problems-a comparative study
-
Dar-El, E. M., 1975, Solving large single-model assembly line balancing problems-a comparative study. AIIE Transactions, 7, 302-310.
-
(1975)
AIIE Transactions
, vol.7
, pp. 302-310
-
-
Dar-El, E.M.1
-
12
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
Davis, E. W. and Heidorn, G. E., 1971, An algorithm for optimal project scheduling under multiple resource constraints. Management Science, 17, B803-B816.
-
(1971)
Management Science
, vol.17
, pp. B803-B816
-
-
Davis, E.W.1
Heidorn, G.E.2
-
13
-
-
0016498438
-
A comparison of heuristics and optimum solutions in resource constrained project scheduling
-
Davis, E. W. and Patterson, J. H., 1975, A comparison of heuristics and optimum solutions in resource constrained project scheduling. Management Science, 21, 944-955.
-
(1975)
Management Science
, vol.21
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
14
-
-
0002907360
-
A branch and bound procedure for the multiple resource constrained project scheduling problem
-
Demeulemeester, E. and Herroelen, W., 1992, A branch and bound procedure for the multiple resource constrained project scheduling problem. Management Science, 38, 1803-1818.
-
(1992)
Management Science
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
15
-
-
0034296450
-
Applying the COMSOAL computer heuristic to the constrained resource allocation problem
-
DePuy, G. W. and Whitehouse G. E., 2000, Applying the COMSOAL computer heuristic to the constrained resource allocation problem. Computers and Industrial Engineering, 38, 413-422.
-
(2000)
Computers and Industrial Engineering
, vol.38
, pp. 413-422
-
-
Depuy, G.W.1
Whitehouse, G.E.2
-
16
-
-
0032117097
-
A survey of the assembly line balancing procedures
-
Erel, E. and Sarin, S., 1998, A survey of the assembly line balancing procedures. Production Planning and Control, 9, 414-434.
-
(1998)
Production Planning and Control
, vol.9
, pp. 414-434
-
-
Erel, E.1
Sarin, S.2
-
17
-
-
0001704996
-
A review of assembly line balancing
-
Ignall, E. J., 1965, A review of assembly line balancing. Journal of Industrial Engineering, 16, 244-254.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 244-254
-
-
Ignall, E.J.1
-
18
-
-
0025849210
-
A new approach for project scheduling with a limited resource
-
Khattab, M. and Choobineh, F., 1991, A new approach for project scheduling with a limited resource. International Journal of Production Research, 29, 185-198.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 185-198
-
-
Khattab, M.1
Choobineh, F.2
-
19
-
-
0001896880
-
Adaptive search for solving hard project scheduling problems
-
Kolisch, R. and Drexl, A., 1996. Adaptive search for solving hard project scheduling problems. Naval Research Logistics, 43, 23-40.
-
(1996)
Naval Research Logistics
, vol.43
, pp. 23-40
-
-
Kolisch, R.1
Drexl, A.2
-
20
-
-
0030788844
-
PSPLIB-A project scheduling problem library
-
Kolisch, R. and Sprecher, A., 1996, PSPLIB-A project scheduling problem library. European Journal of Operational Research, 96, 205-216.
-
(1996)
European Journal of Operational Research
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
21
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A. and Drexl, A., 1995, Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41, 1693-1703.
-
(1995)
Management Science
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
22
-
-
33845274958
-
Strength and adaptibility of problem-space based neighborhoods for resource constrained scheduling
-
Leon, V. J. and Balakrishnan, R. 1995, Strength and adaptibility of problem-space based neighborhoods for resource constrained scheduling. OR Spektrum, 17, 173-182.
-
(1995)
OR Spektrum
, vol.17
, pp. 173-182
-
-
Leon, V.J.1
Balakrishnan, R.2
-
23
-
-
0001636411
-
An experimental investigation and comparative evaluation of production line balancing techniques
-
Mastor, A. A., 1970. An experimental investigation and comparative evaluation of production line balancing techniques. Management Science, 16, 728-746.
-
(1970)
Management Science
, vol.16
, pp. 728-746
-
-
Mastor, A.A.1
-
25
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Ozdamar, L. and Ulusoy, G., 1995, A survey on the resource-constrained project scheduling problem. IIE Transactions, 27, 574-586.
-
(1995)
IIE Transactions
, vol.27
, pp. 574-586
-
-
Ozdamar, L.1
Ulusoy, G.2
-
26
-
-
0021460636
-
Comparison of exact approaches for solving the multiple constrained resource project scheduling problem
-
Patterson, J. H., 1984, Comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Management Science, 30, 854-867.
-
(1984)
Management Science
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
27
-
-
0016028677
-
A horizon-varying, zero-one approach to project scheduling
-
Patterson, J. H. and Huber, W. D., 1974, A horizon-varying, zero-one approach to project scheduling. Management Science, 20, 990-998.
-
(1974)
Management Science
, vol.20
, pp. 990-998
-
-
Patterson, J.H.1
Huber, W.D.2
-
28
-
-
84989730007
-
Local search techniques for the generalized resource constrained project scheduling problem
-
Sampson, S. E. and Weiss, E. N., 1993, Local search techniques for the generalized resource constrained project scheduling problem. Naval Research Logistics, 40, 365-375.
-
(1993)
Naval Research Logistics
, vol.40
, pp. 365-375
-
-
Sampson, S.E.1
Weiss, E.N.2
-
29
-
-
0032096811
-
Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
-
Sprecher, A. and Drexl, A., 1998, Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. European Journal of Operational Research, 107, 431-450.
-
(1998)
European Journal of Operational Research
, vol.107
, pp. 431-450
-
-
Sprecher, A.1
Drexl, A.2
-
30
-
-
0018011301
-
Multiple-resource constrained scheduling using branch and bound
-
Stinson, J. P., Davis, E. W. and Khumawala, B. W., 1978. Multiple-resource constrained scheduling using branch and bound. AIIE Transactions, 10, 252-259.
-
(1978)
AIIE Transactions
, vol.10
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.W.3
-
31
-
-
0017997005
-
An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
-
Talbot, F. B. and Patterson, J. H., 1978, An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems. Management Science, 24, 1163-1174.
-
(1978)
Management Science
, vol.24
, pp. 1163-1174
-
-
Talbot, F.B.1
Patterson, J.H.2
-
32
-
-
0017241984
-
Heuristic scheduling of activities under resource and precedence restrictions
-
Thesen, A., 1976, Heuristic scheduling of activities under resource and precedence restrictions. Management Science, 23, 412-422.
-
(1976)
Management Science
, vol.23
, pp. 412-422
-
-
Thesen, A.1
-
33
-
-
0028396719
-
A constraint based perspective in resource constrained project scheduling
-
Ulusoy, G. and Ozdamar, L., 1994, A constraint based perspective in resource constrained project scheduling. International Journal of Production Research, 32, 693-705.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 693-705
-
-
Ulusoy, G.1
Ozdamar, L.2
-
35
-
-
0010908011
-
Solving constrained multiple resource networks both forward and backward using brooks algorithm
-
to be published
-
Whitehouse, G. E. and DePuy, G. W., 2001, Solving constrained multiple resource networks both forward and backward using brooks algorithm. Project Management Journal, to be published.
-
(2001)
Project Management Journal
-
-
Whitehouse, G.E.1
Depuy, G.W.2
-
36
-
-
0010776963
-
A comparison of computer search heuristics to analyze activity networks with limited resources
-
Whitehouse, G. E. and Tidwell, D., 1980, A comparison of computer search heuristics to analyze activity networks with limited resources. Proceedings of the ORSA/TIMS Conference.
-
(1980)
Proceedings of the ORSA/TIMS Conference
-
-
Whitehouse, G.E.1
Tidwell, D.2
|