메뉴 건너뛰기




Volumn 39, Issue 14, 2001, Pages 3275-3287

A simple and effective heuristic for the resource constrained project scheduling problem

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; CONSTRAINT THEORY; HEURISTIC METHODS; ITERATIVE METHODS; MANAGERS; PROBLEM SOLVING; RANDOM PROCESSES; RESOURCE ALLOCATION; SOCIETIES AND INSTITUTIONS;

EID: 0035922493     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110060608     Document Type: Article
Times cited : (25)

References (36)
  • 1
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource constrained project scheduling: A review and empirical analysis
    • edited by R. Slowinski and J. Weglarz (Amsterdam: Elsevier)
    • Alvarez-Valdes, A. and Tamarit, J. M., 1989, Heuristic algorithms for resource constrained project scheduling: A review and empirical analysis. In Advances in Project Scheduling, edited by R. Slowinski and J. Weglarz (Amsterdam: Elsevier), pp. 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvarez-Valdes, A.1    Tamarit, J.M.2
  • 2
    • 40849130689 scopus 로고
    • COMSOAL: A computer method for sequencing operations for assembly lines
    • Arcus, A. L., 1966, COMSOAL: A computer method for sequencing operations for assembly lines. International Journal of Production Research, 4, 259-277.
    • (1966) International Journal of Production Research , vol.4 , pp. 259-277
    • Arcus, A.L.1
  • 4
    • 84989743918 scopus 로고
    • A new heuristic solution method in resource constrained project scheduling problems
    • Bell, C. E. and Han, J., 1991, A new heuristic solution method in resource constrained project scheduling problems. Naval Research Logistics, 38, 315-331.
    • (1991) Naval Research Logistics , vol.38 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 5
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resource constrained project scheduling
    • Boctor, F. F., 1990, Some efficient multi-heuristic procedures for resource constrained project scheduling. European Journal of Operational Research, 49, 3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 6
    • 0010907527 scopus 로고
    • Priority rule search technique for resource constrained project scheduling
    • PhD dissertation. University of Central Florida, Orlando, Florida, USA
    • Brown, J. T., 1995, Priority rule search technique for resource constrained project scheduling. PhD dissertation. University of Central Florida, Orlando, Florida, USA.
    • (1995)
    • Brown, J.T.1
  • 8
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • Brucker, P., Knust, S., Schoo, A. and Thiele, O., 1998, A branch and bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 107, 272-288.
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 10
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource constrained scheduling projects: An experimental investigation
    • Cooper, D. F., 1976, Heuristics for scheduling resource constrained scheduling projects: an experimental investigation. Management Science, 22, 1186-1194.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.F.1
  • 11
    • 0016556599 scopus 로고
    • Solving large single-model assembly line balancing problems-a comparative study
    • Dar-El, E. M., 1975, Solving large single-model assembly line balancing problems-a comparative study. AIIE Transactions, 7, 302-310.
    • (1975) AIIE Transactions , vol.7 , pp. 302-310
    • Dar-El, E.M.1
  • 12
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E. W. and Heidorn, G. E., 1971, An algorithm for optimal project scheduling under multiple resource constraints. Management Science, 17, B803-B816.
    • (1971) Management Science , vol.17 , pp. B803-B816
    • Davis, E.W.1    Heidorn, G.E.2
  • 13
    • 0016498438 scopus 로고
    • A comparison of heuristics and optimum solutions in resource constrained project scheduling
    • Davis, E. W. and Patterson, J. H., 1975, A comparison of heuristics and optimum solutions in resource constrained project scheduling. Management Science, 21, 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 14
    • 0002907360 scopus 로고
    • A branch and bound procedure for the multiple resource constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., 1992, A branch and bound procedure for the multiple resource constrained project scheduling problem. Management Science, 38, 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 15
    • 0034296450 scopus 로고    scopus 로고
    • Applying the COMSOAL computer heuristic to the constrained resource allocation problem
    • DePuy, G. W. and Whitehouse G. E., 2000, Applying the COMSOAL computer heuristic to the constrained resource allocation problem. Computers and Industrial Engineering, 38, 413-422.
    • (2000) Computers and Industrial Engineering , vol.38 , pp. 413-422
    • Depuy, G.W.1    Whitehouse, G.E.2
  • 16
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • Erel, E. and Sarin, S., 1998, A survey of the assembly line balancing procedures. Production Planning and Control, 9, 414-434.
    • (1998) Production Planning and Control , vol.9 , pp. 414-434
    • Erel, E.1    Sarin, S.2
  • 17
  • 19
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive search for solving hard project scheduling problems
    • Kolisch, R. and Drexl, A., 1996. Adaptive search for solving hard project scheduling problems. Naval Research Logistics, 43, 23-40.
    • (1996) Naval Research Logistics , vol.43 , pp. 23-40
    • Kolisch, R.1    Drexl, A.2
  • 21
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A. and Drexl, A., 1995, Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41, 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 22
    • 33845274958 scopus 로고
    • Strength and adaptibility of problem-space based neighborhoods for resource constrained scheduling
    • Leon, V. J. and Balakrishnan, R. 1995, Strength and adaptibility of problem-space based neighborhoods for resource constrained scheduling. OR Spektrum, 17, 173-182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Balakrishnan, R.2
  • 23
    • 0001636411 scopus 로고
    • An experimental investigation and comparative evaluation of production line balancing techniques
    • Mastor, A. A., 1970. An experimental investigation and comparative evaluation of production line balancing techniques. Management Science, 16, 728-746.
    • (1970) Management Science , vol.16 , pp. 728-746
    • Mastor, A.A.1
  • 25
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Ozdamar, L. and Ulusoy, G., 1995, A survey on the resource-constrained project scheduling problem. IIE Transactions, 27, 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 26
    • 0021460636 scopus 로고
    • Comparison of exact approaches for solving the multiple constrained resource project scheduling problem
    • Patterson, J. H., 1984, Comparison of exact approaches for solving the multiple constrained resource project scheduling problem. Management Science, 30, 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 27
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson, J. H. and Huber, W. D., 1974, A horizon-varying, zero-one approach to project scheduling. Management Science, 20, 990-998.
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 28
    • 84989730007 scopus 로고
    • Local search techniques for the generalized resource constrained project scheduling problem
    • Sampson, S. E. and Weiss, E. N., 1993, Local search techniques for the generalized resource constrained project scheduling problem. Naval Research Logistics, 40, 365-375.
    • (1993) Naval Research Logistics , vol.40 , pp. 365-375
    • Sampson, S.E.1    Weiss, E.N.2
  • 29
    • 0032096811 scopus 로고    scopus 로고
    • Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    • Sprecher, A. and Drexl, A., 1998, Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm. European Journal of Operational Research, 107, 431-450.
    • (1998) European Journal of Operational Research , vol.107 , pp. 431-450
    • Sprecher, A.1    Drexl, A.2
  • 30
    • 0018011301 scopus 로고
    • Multiple-resource constrained scheduling using branch and bound
    • Stinson, J. P., Davis, E. W. and Khumawala, B. W., 1978. Multiple-resource constrained scheduling using branch and bound. AIIE Transactions, 10, 252-259.
    • (1978) AIIE Transactions , vol.10 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.W.3
  • 31
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
    • Talbot, F. B. and Patterson, J. H., 1978, An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems. Management Science, 24, 1163-1174.
    • (1978) Management Science , vol.24 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 32
    • 0017241984 scopus 로고
    • Heuristic scheduling of activities under resource and precedence restrictions
    • Thesen, A., 1976, Heuristic scheduling of activities under resource and precedence restrictions. Management Science, 23, 412-422.
    • (1976) Management Science , vol.23 , pp. 412-422
    • Thesen, A.1
  • 33
    • 0028396719 scopus 로고
    • A constraint based perspective in resource constrained project scheduling
    • Ulusoy, G. and Ozdamar, L., 1994, A constraint based perspective in resource constrained project scheduling. International Journal of Production Research, 32, 693-705.
    • (1994) International Journal of Production Research , vol.32 , pp. 693-705
    • Ulusoy, G.1    Ozdamar, L.2
  • 35
    • 0010908011 scopus 로고    scopus 로고
    • Solving constrained multiple resource networks both forward and backward using brooks algorithm
    • to be published
    • Whitehouse, G. E. and DePuy, G. W., 2001, Solving constrained multiple resource networks both forward and backward using brooks algorithm. Project Management Journal, to be published.
    • (2001) Project Management Journal
    • Whitehouse, G.E.1    Depuy, G.W.2
  • 36
    • 0010776963 scopus 로고
    • A comparison of computer search heuristics to analyze activity networks with limited resources
    • Whitehouse, G. E. and Tidwell, D., 1980, A comparison of computer search heuristics to analyze activity networks with limited resources. Proceedings of the ORSA/TIMS Conference.
    • (1980) Proceedings of the ORSA/TIMS Conference
    • Whitehouse, G.E.1    Tidwell, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.