-
1
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: A review
-
Baker, K.R. and Scudder, G.D., Sequencing with earliness and tardiness penalties: a review. Oper. Res., 1990, 38, 22-36.
-
(1990)
Oper. Res
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
3
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
Brucker, P., Drexl, A., Möhring, R., Neumann, K. and Pesch, E., Resource-constrained project scheduling: notation, classification, models, and methods. Eur. J. oper. Res., 1999, 112, 3-41.
-
(1999)
Eur. J. oper. Res
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
4
-
-
0002907360
-
A branch-and-bound-procedure for the multiple resource-constrained project scheduling problem
-
Demeulemeester, E. and Herroelen, W., A branch-and-bound-procedure for the multiple resource-constrained project scheduling problem. Mgmt Sci., 1992, 38, 1803-1818.
-
(1992)
Mgmt Sci
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
6
-
-
0026376478
-
Scheduling of project networks by job assignment
-
Drexl, A., Scheduling of project networks by job assignment. Mgmt Sci., 1991, 37, 1590-1602.
-
(1991)
Mgmt Sci
, vol.37
, pp. 1590-1602
-
-
Drexl, A.1
-
7
-
-
0002812653
-
A classification scheme for project scheduling
-
edited by J. Weglarz, pp, Kluwer: Boston
-
Herroelen, W., Demeulemeester, E. and De Reyck, B., A classification scheme for project scheduling. In Project Scheduling-Recent Models, Algorithms and Applications, edited by J. Weglarz, pp. 1-26, 1998 (Kluwer: Boston).
-
(1998)
Project Scheduling-Recent Models, Algorithms and Applications
, pp. 1-26
-
-
Herroelen, W.1
Demeulemeester, E.2
De Reyck, B.3
-
8
-
-
1542502674
-
a review and classification of procedures
-
Robust and reactive project scheduling
-
Herroelen, W. and Leus, R., Robust and reactive project scheduling: a review and classification of procedures. Int. J. Prod. Res., 2004, 42, 1599-1620.
-
(2004)
Int. J. Prod. Res
, vol.42
, pp. 1599-1620
-
-
Herroelen, W.1
Leus, R.2
-
9
-
-
37149010165
-
Primal-dual combined with constraint propagation for solving RCPSPWET
-
edited by H. Haasis, H. Kopfer and J. Schönberger, pp, Springer: Berlin
-
Kéri, A. and Kis, T., Primal-dual combined with constraint propagation for solving RCPSPWET. In Operations Research Proceedings 2006, edited by H. Haasis, H. Kopfer and J. Schönberger, pp. 685-690, 2006 (Springer: Berlin).
-
(2006)
Operations Research Proceedings 2006
, pp. 685-690
-
-
Kéri, A.1
Kis, T.2
-
10
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A. and Drexl, A., Characterization and generation of a general class of resource-constrained project scheduling problems. Mgmt Sci., 1995, 41, 1693-1703.
-
(1995)
Mgmt Sci
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
11
-
-
0005386585
-
Iterated local search
-
edited by F. Glover and G. Kochenberger, pp, Kluwer: Boston
-
Lourenço, H.R., Martin, O. and Stützle, T., Iterated local search. In Handbook of Metaheuristics, edited by F. Glover and G. Kochenberger, pp. 321-353, 2002 (Kluwer: Boston).
-
(2002)
Handbook of Metaheuristics
, pp. 321-353
-
-
Lourenço, H.R.1
Martin, O.2
Stützle, T.3
-
12
-
-
0000497721
-
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
-
Neumann, K. and Schwindt, C., Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spektrum, 1997, 19, 205-218.
-
(1997)
OR Spektrum
, vol.19
, pp. 205-218
-
-
Neumann, K.1
Schwindt, C.2
-
13
-
-
0442264225
-
Advanced production scheduling for batch plants in process industries
-
Neumann, K., Schwindt, C. and Trautmann, N., Advanced production scheduling for batch plants in process industries. OR Spectrum, 2002, 24, 251-279.
-
(2002)
OR Spectrum
, vol.24
, pp. 251-279
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
16
-
-
0037851112
-
Minimizing earliness-tardiness costs of resource-constrained projects
-
edited by K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt and G. Wäscher, pp, Springer: Berlin
-
Schwindt, C., Minimizing earliness-tardiness costs of resource-constrained projects. In Operations Research Proceedings 1999, edited by K. Inderfurth, G. Schwödiauer, W. Domschke, F. Juhnke, P. Kleinschmidt and G. Wäscher, pp. 402-407, 2000b (Springer: Berlin).
-
(2000)
Operations Research Proceedings 1999
, pp. 402-407
-
-
Schwindt, C.1
-
18
-
-
0028430131
-
A decomposition approach for a resource-constrained project scheduling problem
-
Serafini, P. and Speranza, M.G., A decomposition approach for a resource-constrained project scheduling problem. Eur. J. Oper. Res., 1994a, 75, 112-135.
-
(1994)
Eur. J. Oper. Res
, vol.75
, pp. 112-135
-
-
Serafini, P.1
Speranza, M.G.2
-
19
-
-
43949157381
-
A decomposition approach in a DSS for a resource constrained scheduling problem
-
Serafini, P. and Speranza, M.G., A decomposition approach in a DSS for a resource constrained scheduling problem. Eur. J. Oper. Res., 1994b, 79, 208-219.
-
(1994)
Eur. J. Oper. Res
, vol.79
, pp. 208-219
-
-
Serafini, P.1
Speranza, M.G.2
-
20
-
-
33846369528
-
Heuristic procedures for reactive project scheduling
-
Van de Vonder, S., Ballestín, F., Demeulemeester, E. and Herroelen, W., Heuristic procedures for reactive project scheduling. Comput. Ind. Engng, 2007, 52, 11-28.
-
(2007)
Comput. Ind. Engng
, vol.52
, pp. 11-28
-
-
Van de Vonder, S.1
Ballestín, F.2
Demeulemeester, E.3
Herroelen, W.4
-
21
-
-
0035617606
-
An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem
-
Vanhoucke, M., Demeulemeester, E. and Herroelen, W., An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem. Ann. Oper. Res., 2001, 102, 179-196.
-
(2001)
Ann. Oper. Res
, vol.102
, pp. 179-196
-
-
Vanhoucke, M.1
Demeulemeester, E.2
Herroelen, W.3
-
22
-
-
0038522570
-
a critical activity reordering heuristic
-
Resource-constrained project scheduling
-
Valls, V., Quintanilla, S. and Ballestín, F., Resource-constrained project scheduling: a critical activity reordering heuristic. Eur. J. Oper. Res., 2003, 149, 282-301.
-
(2003)
Eur. J. Oper. Res
, vol.149
, pp. 282-301
-
-
Valls, V.1
Quintanilla, S.2
Ballestín, F.3
|