메뉴 건너뛰기




Volumn 51, Issue 3, 2013, Pages 883-896

A joint production scheduling approach considering multiple resources and preventive maintenance tasks

Author keywords

genetic algorithm; preventive maintenance; production scheduling

Indexed keywords

GENETIC ALGORITHM APPROACH; INJECTION MACHINES; JOINT PRODUCTION; JOINT SCHEDULING; MAINTENANCE INTERVALS; MAINTENANCE SCHEDULES; MAINTENANCE SCHEDULING; MAINTENANCE TASKS; MAINTENANCE TREATMENTS; MAKESPAN; MULTIPLE RESOURCES; NUMERICAL EXAMPLE; NUMERICAL SOLUTION; PLASTICS PRODUCTION; PRODUCTION SCHEDULE; PRODUCTION SCHEDULING; PRODUCTION SYSTEM; RELIABILITY AND AVAILABILITY; SCHEDULING PROBLEM;

EID: 84871252419     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.677070     Document Type: Article
Times cited : (76)

References (44)
  • 2
    • 79951578965 scopus 로고    scopus 로고
    • Non-identical parallel machine scheduling using genetic algorithm
    • Balin, S., 2011. Non-identical parallel machine scheduling using genetic algorithm. Expert Systems with Applications, 38 (6), 6814-6821.
    • (2011) Expert Systems with Applications , vol.38 , Issue.6 , pp. 6814-6821
    • Balin, S.1
  • 3
    • 0002362385 scopus 로고
    • Optimum preventive maintenance policies
    • Barlow, R.E. and Hunter, L.C., 1960. Optimum preventive maintenance policies. Operations Research, 8 (1), 90-100.
    • (1960) Operations Research , vol.8 , Issue.1 , pp. 90-100
    • Barlow, R.E.1    Hunter, L.C.2
  • 4
    • 0016935842 scopus 로고
    • A modified block replacement policy
    • Berg M. and Epstein, B 1976. A modified block replacement policy. Naval Research Logistics 23 (1) 15-24.
    • (1976) Naval Research Logistics , vol.23 , Issue.1 , pp. 15-24
    • Berg, M.1    Epstein, B.2
  • 6
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1109/TR.2005.845967
    • Cassady, C.R. and Kutanoglu, E., 2005. Integrating preventive maintenance planning and production scheduling for a single machine. IEEE Transactions on Reliability, 54 (2), 304-309. (Pubitemid 41005032)
    • (2005) IEEE Transactions on Reliability , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 7
    • 22144475484 scopus 로고    scopus 로고
    • An adaptive genetic algorithm with dominated genes for distributed scheduling problems
    • DOI 10.1016/j.eswa.2005.04.009, PII S095741740500062X
    • Chan, F.T.S., Chan, L.Y., and Chung, S.H., 2005. An adaptive genetic algorithm with dominated genes for distributed scheduling problems. Expert Systems with Application, 29 (2), 364-371. (Pubitemid 40970644)
    • (2005) Expert Systems with Applications , vol.29 , Issue.2 , pp. 364-371
    • Chan, F.T.S.1    Chung, S.H.2    Chan, P.L.Y.3
  • 8
    • 0026435636 scopus 로고
    • Optimal number of periodic preventive maintenance operations under warranty
    • Chun, Y.H., 1992. Optimal number of periodic preventive maintenance operations under warranty. Reliability Engineering and System Safety, 37 (3), 223-225.
    • (1992) Reliability Engineering and System Safety , vol.37 , Issue.3 , pp. 223-225
    • Chun, Y.H.1
  • 9
    • 64049109885 scopus 로고    scopus 로고
    • Optimisation of system reliability in multi-factory production networks by maintenance approach
    • Chung, S.H., et al., 2009. Optimisation of system reliability in multi-factory production networks by maintenance approach. Expert Systems with Applications, 36 (6), 10188-10196.
    • (2009) Expert Systems with Applications , vol.36 , Issue.6 , pp. 10188-10196
    • Chung, S.H.1
  • 10
    • 77956056614 scopus 로고    scopus 로고
    • Application of genetic approach for advanced planning in multi-factory environment
    • Chung, S.H., et al., 2010. Application of genetic approach for advanced planning in multi-factory environment. International Journal of Production Economics, 127 (2), 300-308.
    • (2010) International Journal of Production Economics , vol.127 , Issue.2 , pp. 300-308
    • Chung, S.H.1
  • 11
    • 0028454870 scopus 로고
    • Preventative maintenance strategy for equipment under warranty
    • DOI 10.1016/0026-2714(94)90073-6
    • Dagpunar, J.S. and Jack, N., 1994. Preventive maintenance strategy for equipment under warranty. Microelectronics and Reliability, 34 (6), 1089-1093. (Pubitemid 124015584)
    • (1994) Microelectronics Reliability , vol.34 , Issue.6 , pp. 1089-1093
    • Dagpunar, J.S.1
  • 12
    • 0032121108 scopus 로고    scopus 로고
    • An age reduction approach for finite horizon optimization of preventive maintenance for single units subject to random failures
    • PII S0360835297002817
    • Dedopoulos, I.T. and Smeers, Y., 1998. Age reduction approach for finite horizon optimisation of preventive maintenance for single units subject to random failures. Computers and Industrial Engineering, 34 (3), 643-654. (Pubitemid 128674732)
    • (1998) Computers and Industrial Engineering , vol.34 , Issue.3 , pp. 643-654
    • Dedopoulos, I.T.1    Smeers, Y.2
  • 14
    • 0022865373 scopus 로고
    • Future paths for integer programming links to artificial intelligence
    • Glover, F., 1986. Future paths for integer programming links to artificial intelligence. Computers and Operations Research, 13 (5), 533-589.
    • (1986) Computers and Operations Research , vol.13 , Issue.5 , pp. 533-589
    • Glover, F.1
  • 15
    • 0026837810 scopus 로고
    • Cost optimisation of maintenance scheduling for a system with assured reliability
    • Jabayalan, V. and Chaudhuri, D., 1992. Cost optimisation of maintenance scheduling for a system with assured reliability. IEEE Transactions on Reliability, 41 (1), 21-25.
    • (1992) IEEE Transactions on Reliability , vol.41 , Issue.1 , pp. 21-25
    • Jabayalan, V.1    Chaudhuri, D.2
  • 16
    • 34548580996 scopus 로고    scopus 로고
    • Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process
    • DOI 10.1002/nav.20232
    • Kuo, Y. and Chang, Z.A., 2007. Integrated production scheduling and preventive maintenance planning for a single machine under a cumulative damage failure process. Naval Research Logistics, 54 (6), 602-614. (Pubitemid 47395706)
    • (2007) Naval Research Logistics , vol.54 , Issue.6 , pp. 602-614
    • Kuo, Y.1    Chang, Z.-A.2
  • 17
    • 33947110348 scopus 로고    scopus 로고
    • Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances
    • DOI 10.1142/S0217595907001139
    • Lim, J.H. and Park, D.H., 2007. Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances. Asia-Pacific Journal of Operational Research, 24 (1), 111-124. (Pubitemid 46411094)
    • (2007) Asia-Pacific Journal of Operational Research , vol.24 , Issue.1 , pp. 111-124
    • Lim, J.-H.1    Park, D.H.2
  • 18
    • 84977325902 scopus 로고
    • A replacement model with overhauls and repairs
    • Liu, X., Makis, V., and Jardine, A.K.S., 1995. A replacement model with overhauls and repairs. Naval Research Logistics, 42 (7), 1063-1079.
    • (1995) Naval Research Logistics , vol.42 , Issue.7 , pp. 1063-1079
    • Liu, X.1    Makis, V.2    Jardine, A.K.S.3
  • 19
    • 0033117187 scopus 로고    scopus 로고
    • Age-dependent reliability model considering effects of maintenance and working conditions
    • Martorell, S., Sanchez, A., and Serradell, V., 1999. Age-dependent reliability model considering effects of maintenance and working conditions. Reliability Engineering and System Safety, 64 (1), 19-31.
    • (1999) Reliability Engineering and System Safety , vol.64 , Issue.1 , pp. 19-31
    • Martorell, S.1    Sanchez, A.2    Serradell, V.3
  • 22
    • 0001103821 scopus 로고
    • A summary of imperfect maintenance policies with minimal repair
    • Nakagawa, T., 1980. A summary of imperfect maintenance policies with minimal repair. RAIRO: Recherche Operationnelle, 14 (3), 249-255.
    • (1980) RAIRO: Recherche Operationnelle , vol.14 , Issue.3 , pp. 249-255
    • Nakagawa, T.1
  • 23
    • 0019583485 scopus 로고
    • Modified periodic replacement with minimal repair at failure
    • Nakagawa, T., 1981a. Modified periodic replacement with minimal repair at failure. IEEE Transactions on Reliability, 30 (2), 165-168, R. (Pubitemid 11521105)
    • (1981) IEEE Transactions on Reliability , vol.R-30 , Issue.2 , pp. 165-168
    • Nakagawa, T.1
  • 24
    • 0002669020 scopus 로고
    • A summary of periodic replacement with minimal repair at failure
    • Nakagawa, T., 1981b. A summary of periodic replacement with minimal repair at failure. Journal of the Operations Research Society of Japan, 24 (3), 213-228.
    • (1981) Journal of the Operations Research Society of Japan , vol.24 , Issue.3 , pp. 213-228
    • Nakagawa, T.1
  • 25
    • 0021616320 scopus 로고
    • Optimal policy of continuous and discrete replacement with minimal repair at failure
    • Nakagawa, T., 1984. Optimal policy of continuous and discrete replacement with minimal repair at failure. Naval Research Logistics Quarterly, 31 (4), 543-550. (Pubitemid 15421591)
    • (1984) Naval research logistics quarterly , vol.31 , Issue.4 , pp. 543-550
    • Nakagawa, T.1
  • 26
    • 83555163619 scopus 로고    scopus 로고
    • A unique integer mathematical model for scheduling deteriorating jobs with ratemodifying-activities on a single machine
    • Ozturkoglu, Y. and Bulfin, R.L., 2011. A unique integer mathematical model for scheduling deteriorating jobs with ratemodifying-activities on a single machine. International Journal of Advanced Manufacturing Technology, 57 (5-8), 753-762.
    • (2011) International Journal of Advanced Manufacturing Technology , vol.57 , Issue.5-8 , pp. 753-762
    • Ozturkoglu, Y.1    Bulfin, R.L.2
  • 27
    • 0030575689 scopus 로고    scopus 로고
    • Imperfect maintenance
    • PII S0377221796000999
    • Pham, H. and Wang, H., 1996. Imperfect maintenance. European Journal of Operational Research, 94 (3), 425-438. (Pubitemid 126391952)
    • (1996) European Journal of Operational Research , vol.94 , Issue.3 , pp. 425-438
    • Pham, H.1    Wang, H.2
  • 28
    • 78650699442 scopus 로고    scopus 로고
    • FMS scheduling with knowledge based genetic algorithm approach
    • Prakash, A., Chan, F.T.S., and Deshmukh, S.G., 2011. FMS scheduling with knowledge based genetic algorithm approach. Expert Systems with Applications, 38 (4), 3161-3171.
    • (2011) Expert Systems with Applications , vol.38 , Issue.4 , pp. 3161-3171
    • Prakash, A.1    Chan, F.T.S.2    Deshmukh, S.G.3
  • 29
    • 0033446820 scopus 로고    scopus 로고
    • Scheduling the maintenance on a single machine
    • Qi, X., Chen, T., and Tu, F., 1999. Scheduling the maintenance on a single machine. Journal of Operational Research Society, 50 (10), 1071-1078. (Pubitemid 129596359)
    • (1999) Journal of the Operational Research Society , vol.50 , Issue.10 , pp. 1071-1078
    • Qi, X.1    Chen, T.2    Tu, F.3
  • 30
    • 77956941721 scopus 로고    scopus 로고
    • A GRASP algorithm for flexible job-shop scheduling with maintenance constraints
    • Rajkumar, M., Asokan, P., and Vamsikrishna, V., 2010. A GRASP algorithm for flexible job-shop scheduling with maintenance constraints. International Journal of Production Research, 48 (22), 6821-6836.
    • (2010) International Journal of Production Research , vol.48 , Issue.22 , pp. 6821-6836
    • Rajkumar, M.1    Asokan, P.2    Vamsikrishna, V.3
  • 31
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • DOI 10.1016/j.cor.2005.12.007, PII S0305054805004041
    • Ruiz, R., Garcia-Diaz, J.C., and Maroto, C., 2007. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers and Operations Research, 34 (11), 3314-3330. (Pubitemid 46517859)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    Carlos Garcia-Diaz, J.2    Maroto, C.3
  • 32
  • 33
    • 0000466846 scopus 로고
    • Extended optimal age replacement policy with minimal repair
    • Sheu, S., Kuo, C., and Nakagawa, T., 1993. Extended optimal age replacement policy with minimal repair. RAIRO: Recherche Operationnelle, 27 (3), 337-351.
    • (1993) RAIRO: Recherche Operationnelle , vol.27 , Issue.3 , pp. 337-351
    • Sheu, S.1    Kuo, C.2    Nakagawa, T.3
  • 34
    • 13444291361 scopus 로고    scopus 로고
    • Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine
    • DOI 10.1016/j.compind.2004.06.005, PII S0166361504000983, Applications of Genetic Algorithms in Industry
    • Sortrakul, N., Nachtmann, H.L., and Cassady, C.R., 2005. Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine. Computers in Industry, 56 (2), 161-168. (Pubitemid 40206234)
    • (2005) Computers in Industry , vol.56 , Issue.2 , pp. 161-168
    • Sortrakul, N.1    Nachtmann, H.L.2    Cassady, C.R.3
  • 35
    • 74449083455 scopus 로고    scopus 로고
    • Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines
    • Sun, K. and Li, H., 2010. Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines. International Journal of Production Economics, 124 (1), 151-158.
    • (2010) International Journal of Production Economics , vol.124 , Issue.1 , pp. 151-158
    • Sun, K.1    Li, H.2
  • 37
    • 0018014619 scopus 로고
    • Extended block replacement policy with used items
    • Tango, T., 1978. Extended block replacement policy with used items. Journal of Applied Probability, 15 (3), 560-572. (Pubitemid 9403836)
    • (1978) J Appl Probab , vol.15 , Issue.3 , pp. 560-572
    • Tango, T.1
  • 38
    • 0024718118 scopus 로고
    • Survey of preventive maintenance models for stochastically deteriorating single-unit systems
    • Valdez-Flores, C. and Feldman, R.M., 1989. A survey of preventive maintenance models for stochastically deteriorating singleunit systems. Naval Research Logistics, 36 (4), 419-446. (Pubitemid 20625232)
    • (1989) Naval Research Logistics , vol.36 , Issue.4 , pp. 419-446
    • Valdez-Flores Ciriaco1
  • 39
    • 79952187971 scopus 로고    scopus 로고
    • A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
    • Vallada, E. and Ruiz, R., 2011. A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times. European Journal of Operational Research, 211 (3), 612-622.
    • (2011) European Journal of Operational Research , vol.211 , Issue.3 , pp. 612-622
    • Vallada, E.1    Ruiz, R.2
  • 40
    • 0037118559 scopus 로고    scopus 로고
    • A survey of maintenance policies of deteriorating systems
    • DOI 10.1016/S0377-2217(01)00197-7, PII S0377221701001977
    • Wang, H., 2002. A survey of maintenance policies of deteriorating systems. European Journal of Operational Research, 139 (3), 469-489. (Pubitemid 34249626)
    • (2002) European Journal of Operational Research , vol.139 , Issue.3 , pp. 469-489
    • Wang, H.1
  • 42
    • 0033467451 scopus 로고    scopus 로고
    • Some maintenance models and availability with imperfect maintenance in production systems
    • Wang, H. and Pham, H., 1999. Some maintenance models and availability with imperfect maintenance in production systems. Annals of Operations Research, 91 (1), 305-318.
    • (1999) Annals of Operations Research , vol.91 , Issue.1 , pp. 305-318
    • Wang, H.1    Pham, H.2
  • 43
    • 84871250763 scopus 로고    scopus 로고
    • A genetic algorithm approach for production scheduling with mold maintenance consideration
    • in press
    • Wong, C.S., Chan, F.T.S., and Chung, S.H., 2011. A genetic algorithm approach for production scheduling with mold maintenance consideration. International Journal of Production Research, in press.
    • (2011) International Journal of Production Research
    • Wong, C.S.1    Chan, F.T.S.2    Chung, S.H.3
  • 44
    • 34548655710 scopus 로고    scopus 로고
    • Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
    • DOI 10.1016/j.cor.2006.08.015, PII S0305054806002036
    • Xu, D., Sun, K., and Li, H., 2008. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. Computers and Operations Research, 35 (4), 1344-1349. (Pubitemid 47404774)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1344-1349
    • Xu, D.H.1    Sun, K.B.2    Li, H.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.