Volumn 44, Issue 2, 2006, Pages 215-236

The trade-off between stability and makespan in resource-constrained project scheduling

Author keywords

Project management; Scheduling sequencing; Simulation methods

Indexed keywords

ALGORITHMS; COMPUTER SIMULATION; HEURISTIC METHODS; PROJECT MANAGEMENT; RESOURCE ALLOCATION; ROBUSTNESS (CONTROL SYSTEMS);

EID: 29344454950     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500140914     Document Type: Article
Times cited : (116)

References (27)
  • 1
  • 2
    • 0001849846 scopus 로고
    • Heuristic algorithms for resource-constrained project scheduling
    • edited by R. Slowinski and J. Weglarz (Elsevier: Amsterdam)
    • Alvarez-Valdés, R. and Tamarit, J.M., Heuristic algorithms for resource-constrained project scheduling. In Advances in Project Scheduling, edited by R. Slowinski and J. Weglarz, pp. 134-143, 1989 (Elsevier: Amsterdam).
    • (1989) Advances in Project Scheduling , pp. 134-143
    • Alvarez-Valdés, R.1    Tamarit, J.M.2
  • 3
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • Artigues, C. and Roubellat, F., A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. Eur. J. Oper. Res., 2000, 127, 294-316.
    • (2000) Eur. J. Oper. Res. , vol.127 , pp. 294-316
    • Artigues, C.1    Roubellat, F.2
  • 4
    • 0032736579 scopus 로고    scopus 로고
    • Resource constrained project scheduling: Notation, classification, models and methods
    • Brucker, P., Drexl, A., Möhring, R., Neumann, K. and Pesch, E., Resource constrained project scheduling: notation, classification, models and methods. Eur. J. Oper. Res., 1999, 112, 3-41.
    • (1999) Eur. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 6
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Manage. Sci., 1992, 38, 1803-1818.
    • (1992) Manage. Sci. , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 7
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W., New benchmark results for the resource-constrained project scheduling problem. Manage. Sci., 1997, 43, 1485-1492.
    • (1997) Manage. Sci. , vol.43 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 8
    • 0012814054 scopus 로고    scopus 로고
    • Vol. 49 of International Series in Operations Research & Management Science (Kluwer Academic Publishers: Boston, MA)
    • Demeulemeester, E. and Herroelen, W., Project Scheduling - A Research Handbook. Vol. 49 of International Series in Operations Research & Management Science, 2002 (Kluwer Academic Publishers: Boston, MA).
    • (2002) Project Scheduling - A Research Handbook
    • Demeulemeester, E.1    Herroelen, W.2
  • 9
    • 3543055794 scopus 로고    scopus 로고
    • RanGen: A random network generator for activity-on-the-node networks
    • Demeulemeester, E., Vanhoucke, M. and Herroelen, W., RanGen: a random network generator for activity-on-the-node networks. J. Sched., 2003, 6, 17-38.
    • (2003) J. Sched. , vol.6 , pp. 17-38
    • Demeulemeester, E.1    Vanhoucke, M.2    Herroelen, W.3
  • 10
    • 29344447030 scopus 로고    scopus 로고
    • European Commission, Press Release, MEMO/04/207, 2 September 2004
    • European Commission, Press Release, MEMO/04/207, 2 September 2004.
  • 11
    • 0003926816 scopus 로고    scopus 로고
    • North River Press: Great Barrington, MA
    • Goldratt, E., Critical Chain, 1997 (North River Press: Great Barrington, MA).
    • (1997) Critical Chain
    • Goldratt, E.1
  • 12
    • 0033077946 scopus 로고    scopus 로고
    • Phase transitions in project scheduling
    • Herroelen, W. and De Reyck, B., Phase transitions in project scheduling. J. Oper. Res. Soc., 1999, 50, 148-156.
    • (1999) J. Oper. Res. Soc. , vol.50 , pp. 148-156
    • Herroelen, W.1    De Reyck, B.2
  • 13
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained scheduling: A survey of recent developments
    • Herroelen, W., De Reyck, B. and Demeulemeester, E., Resource-constrained scheduling: a survey of recent developments. Comput. Oper. Res., 1998, 25, 279-302.
    • (1998) Comput. Oper. Res. , vol.25 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 14
    • 0035480172 scopus 로고    scopus 로고
    • On the merits and pitfalls of critical chain scheduling
    • Herroelen, W. and Leus, R., On the merits and pitfalls of critical chain scheduling. J. Oper. Manage., 2001, 19, 559-577.
    • (2001) J. Oper. Manage. , vol.19 , pp. 559-577
    • Herroelen, W.1    Leus, R.2
  • 15
    • 1642587688 scopus 로고    scopus 로고
    • The construction of stable project baseline schedules
    • Herroelen, W. and Leus, R., The construction of stable project baseline schedules. Eur. J. Oper. Res., 2004, 156, 550-565.
    • (2004) Eur. J. Oper. Res. , vol.156 , pp. 550-565
    • Herroelen, W.1    Leus, R.2
  • 16
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty - Survey and research potentials
    • Herroelen, W. and Leus, R., Project scheduling under uncertainty - survey and research potentials. Eur. J. Oper. Res., 2005, 165, 289-306.
    • (2005) Eur. J. Oper. Res. , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 17
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • edited by J. Weglarz (Kluwer Academic: Boston, MA)
    • Kolisch, R. and Hartmann, S., Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In Project Scheduling: Recent Models, Algorithms and Applications, edited by J. Weglarz, 1999 (Kluwer Academic: Boston, MA).
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications
    • Kolisch, R.1    Hartmann, S.2
  • 18
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch, R. and Padman, R., An integrated survey of deterministic project scheduling. Omega, 1999, 49, 249-272.
    • (1999) Omega , vol.49 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 19
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A. and Drexl, A., Characterization and generation of a general class of resource-constrained project scheduling problems. Manage. Sci., 1995, 41, 1693-1703.
    • (1995) Manage. Sci. , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 21
    • 2942687563 scopus 로고    scopus 로고
    • Stability and resource allocation in project planning
    • Leus, R. and Herroelen, W., Stability and resource allocation in project planning. IIE Trans., 2004, 36, 1-16.
    • (2004) IIE Trans. , vol.36 , pp. 1-16
    • Leus, R.1    Herroelen, W.2
  • 22
    • 0001636411 scopus 로고
    • An experimental and comparative evaluation of production line balancing techniques
    • Mastor, A., An experimental and comparative evaluation of production line balancing techniques. Manage. Sci., 1970, 16, 728-746.
    • (1970) Manage. Sci. , vol.16 , pp. 728-746
    • Mastor, A.1
  • 24
    • 0002014063 scopus 로고
    • Allocations of resources C.P.M
    • Pascoe, T., Allocations of resources C.P.M. Rev. Fr. Rech. Opér., 1966, 38, 31-38.
    • (1966) Rev. Fr. Rech. Opér. , vol.38 , pp. 31-38
    • Pascoe, T.1
  • 25
    • 0016935106 scopus 로고
    • Project scheduling: The effects of problem structure on heuristic scheduling
    • Patterson, J., Project scheduling: the effects of problem structure on heuristic scheduling. Naval Res. Logist., 1976, 23, 95-123.
    • (1976) Naval Res. Logist. , vol.23 , pp. 95-123
    • Patterson, J.1
  • 26
    • 0348167521 scopus 로고    scopus 로고
    • On the optimal management of project risk
    • Tavares, L., Ferreira, J. and Coelho, J., On the optimal management of project risk. Eur. J. Oper. Res., 1998, 107, 451-169.
    • (1998) Eur. J. Oper. Res. , vol.107 , pp. 451-1169
    • Tavares, L.1    Ferreira, J.2    Coelho, J.3
  • 27
    • 19744379632 scopus 로고    scopus 로고
    • The use of buffers in project management: The trade-off between stability and makespan
    • Van de Vonder, S., Demeulemeester, E., Herroelen, W. and Leus, R., The use of buffers in project management: the trade-off between stability and makespan. Int. J. Prod. Econ., 2005, 97, 227-240.
    • (2005) Int. J. Prod. Econ. , vol.97 , pp. 227-240
    • Van De Vonder, S.1    Demeulemeester, E.2    Herroelen, W.3    Leus, R.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.