메뉴 건너뛰기




Volumn 51, Issue 16, 2013, Pages 4966-4978

Real-time scheduling in manufacturing system with machining and assembly operations: A state of art

Author keywords

heuristics; metaheuristics; optimisation; real time scheduling

Indexed keywords

ASSEMBLY OPERATIONS; COMPARATIVE EVALUATIONS; HEURISTICS; MACHINING OPERATIONS; META HEURISTICS; OPTIMISATIONS; REAL TIME SCHEDULING; SCHEDULING TECHNIQUES;

EID: 84882456353     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.784414     Document Type: Article
Times cited : (21)

References (70)
  • 3
    • 34147159638 scopus 로고    scopus 로고
    • A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
    • Al-Anzi, Fawaz S., and, Allahverdi, Ali. 2007. A Self-adaptive Differential Evolution Heuristic for Two-stage Assembly Scheduling Problem to Minimize Maximum Lateness with Setup Times. European Journal of Operational Research, 182 (1): 80-94.
    • (2007) European Journal of Operational Research , vol.182 , Issue.1 , pp. 80-94
    • Al-Anzi, F.S.1    Allahverdi, A.2
  • 4
    • 60349093593 scopus 로고    scopus 로고
    • Heuristics for a two-stage assembly flow shop with bicriteria of maximum lateness and makespan
    • Al-Anzi, Fawaz S., and, Allahverdi, Ali. 2009. Heuristics for a Two-stage Assembly Flow Shop with Bicriteria of Maximum Lateness and Makespan. Computers & Operations Research, 36: 2682-2689.
    • (2009) Computers & Operations Research , vol.36 , pp. 2682-2689
    • Al-Anzi, F.S.1    Allahverdi, A.2
  • 5
    • 27144557504 scopus 로고    scopus 로고
    • A pso and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
    • Allahverdi, Ali, and, Al-Anzi, Fawaz S. 2006. A PSO and a Tabu Search Heuristics for the Assembly Scheduling Problem of the Two-stage Distributed Database Application. Computers & Operations Research, 33 (4): 1056-1080.
    • (2006) Computers & Operations Research , vol.33 , Issue.4 , pp. 1056-1080
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 6
    • 0030241635 scopus 로고    scopus 로고
    • A hybrid ga-sa algorithm for just-in-time scheduling of multilevel-assemblies
    • Anthony, Roach, and, Nagi, Rakesh. 1996. A Hybrid GA-SA Algorithm for Just-in-time Scheduling of Multilevel-assemblies. Computer and Industrial Engineering, 30 (4): 1047-1060.
    • (1996) Computer and Industrial Engineering , vol.30 , Issue.4 , pp. 1047-1060
    • Anthony, R.1    Nagi, R.2
  • 7
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug, H., Lawley, M. A., Mckay, K., Mohan, S., and, Uzsoy, R. 2005. Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions. European Journal of Operational Research, 161: 86-110.
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 8
    • 28144451536 scopus 로고    scopus 로고
    • Parallel machine rescheduling with machine disruptions
    • Azizoglu, M., and, Alagoz, O. 2005. Parallel Machine Rescheduling with Machine Disruptions. IIE Transactions, 37: 1113-1118.
    • (2005) IIE Transactions , vol.37 , pp. 1113-1118
    • Azizoglu, M.1    Alagoz, O.2
  • 10
    • 84871320047 scopus 로고    scopus 로고
    • Heuristics for production scheduling problem with machining and assembly operations
    • doi: 10.5267/j.ijiec.2011.09.0033
    • Bhongade, A. S., and, Khodke, P. M. 2012. Heuristics for Production Scheduling Problem with Machining and Assembly Operations. International Journal of Industrial Engineering Computations, 2: 185-198. doi: 10.5267/j.ijiec.2011. 09.0033
    • (2012) International Journal of Industrial Engineering Computations , vol.2 , pp. 185-198
    • Bhongade, A.S.1    Khodke, P.M.2
  • 11
    • 46649113169 scopus 로고    scopus 로고
    • An online approach to dynamic, rescheduling for production planning applications
    • Caricato, Pierpaolo, and, Antonio, Grieco. 2008. An Online Approach to Dynamic, Rescheduling for Production Planning Applications. International Journal of Production Research, 46 (16): 4597-4617.
    • (2008) International Journal of Production Research , vol.46 , Issue.16 , pp. 4597-4617
    • Caricato, P.1    Antonio, G.2
  • 12
  • 14
    • 84863414134 scopus 로고    scopus 로고
    • Radio frequency identification-enabled real-time manufacturing execution system: A case study in an automotive part manufacturer
    • Dai, Q. Y., Zhong, R. Y., Huang, G. Q., Qu, T., Zhang, T., and, Luo, T. Y. 2012. Radio Frequency Identification-enabled Real-time Manufacturing Execution System: A Case Study in an Automotive Part Manufacturer. International Journal of Computer Integrated Manufacturing, 25 (1): 51-65.
    • (2012) International Journal of Computer Integrated Manufacturing , vol.25 , Issue.1 , pp. 51-65
    • Dai, Q.Y.1    Zhong, R.Y.2    Huang, G.Q.3    Qu, T.4    Zhang, T.5    Luo, T.Y.6
  • 16
    • 84882456750 scopus 로고    scopus 로고
    • Production rescheduling for machine breakdown at a job shop
    • Dong, Yao-Hsiang, and, Jang, Jaejin. 2012. Production Rescheduling for Machine Breakdown at a Job Shop. International Journal of Production Research, 50 (10): 2681-2691.
    • (2012) International Journal of Production Research , vol.50 , Issue.10 , pp. 2681-2691
    • Dong, Y.-H.1    Jang, J.2
  • 17
    • 0024641735 scopus 로고
    • The effect of product structure and sequencing rule on assembly shop performance
    • Fry, T. D., Olife, M. D., Minor, E. D., and, Keong, Leong G. 1989. The Effect of Product Structure and Sequencing Rule on Assembly Shop Performance. International Journal of Production Research, 27 (4): 671-686.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 671-686
    • Fry, T.D.1    Olife, M.D.2    Minor, E.D.3    Keong, L.G.4
  • 18
    • 53049105843 scopus 로고    scopus 로고
    • A particle swarm-based genetic algorithm for scheduling in an agile environment
    • Gaafar, Lotfi K., Masoud, Sherif A., and, Nassef, Ashraf O. 2008. A Particle Swarm-based Genetic Algorithm for Scheduling in an Agile Environment. Computer and Industrial Engineering, 55: 707-720.
    • (2008) Computer and Industrial Engineering , vol.55 , pp. 707-720
    • Gaafar, L.K.1    Masoud, S.A.2    Nassef, A.O.3
  • 19
    • 78349255892 scopus 로고    scopus 로고
    • A discrete time reactive scheduling model for new order insertion in job shop, make-to order industries
    • Gomes, Marta Castilho, Barbosa-Póvoa, Ana Paula, and, Novais, Augusto Queiroz. 2010. A Discrete Time Reactive Scheduling Model for New Order Insertion in Job Shop, Make-to Order Industries. International Journal of Production Research, 48 (24): 7395-7422.
    • (2010) International Journal of Production Research , vol.48 , Issue.24 , pp. 7395-7422
    • Gomes, M.C.1    Barbosa-Póvoa, A.P.2    Novais, A.Q.3
  • 20
    • 0032679037 scopus 로고    scopus 로고
    • Rescheduling and optimization of schedules considering machine failures
    • Guo, Bo, and, Nonaka, Yasuo. 1999. Rescheduling and Optimization of Schedules Considering Machine Failures. International Journal of Production Economics, 60-61: 503-513.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 503-513
    • Guo, B.1    Nonaka, Y.2
  • 21
    • 0031351397 scopus 로고    scopus 로고
    • A branch and bound algorithm for the two-stage assembly scheduling problem
    • Hariri, A. M. A., and, Potts, C. N. 1997. A Branch and Bound Algorithm for the Two-stage Assembly Scheduling Problem. European Journal of Operational Research, 103 (3): 547-556.
    • (1997) European Journal of Operational Research , vol.103 , Issue.3 , pp. 547-556
    • Hariri, A.M.A.1    Potts, C.N.2
  • 23
    • 0037143044 scopus 로고    scopus 로고
    • Scheduling manufacturing systems for delayed product differentiation in agile manufacturing
    • He, D., and, Babayan, A. 2002. Scheduling Manufacturing Systems for Delayed Product Differentiation in Agile Manufacturing. International Journal of Production Research, 40 (11): 2461-2481.
    • (2002) International Journal of Production Research , vol.40 , Issue.11 , pp. 2461-2481
    • He, D.1    Babayan, A.2
  • 24
    • 0021424669 scopus 로고
    • A comparative study of priority dispatching rules in a hybrid assembly/job shop
    • Huang, P. 1984. A Comparative Study of Priority Dispatching Rules in a Hybrid Assembly/Job Shop. International Journal of Production Research, 22 (3): 375-387.
    • (1984) International Journal of Production Research , vol.22 , Issue.3 , pp. 375-387
    • Huang, P.1
  • 26
    • 0003075019 scopus 로고
    • Optimal two and three-stage production schedules with setup times included
    • Johnson, S. M. 1954. Optimal Two and Three-stage Production Schedules with Setup Times Included. Naval Research Logistics Quarterly, 1: 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 28
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • Kim, J. U., and Y. D. Kim, 1996. "Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure." Computers and Operations Research 23 (9): 857-868.
    • (1996) Computers and Operations Research , vol.23 , Issue.9 , pp. 857-868
    • Kim, J.U.1    Kim, Y.D.2
  • 29
    • 15744372517 scopus 로고    scopus 로고
    • Repair control of enterprise systems using rfid sensory data
    • Kohn, W., Brayman, V., and, Littleton, J. 2005. Repair Control of Enterprise Systems Using RFID Sensory Data. IIE Transactions, 37 (4): 281-290.
    • (2005) IIE Transactions , vol.37 , Issue.4 , pp. 281-290
    • Kohn, W.1    Brayman, V.2    Littleton, J.3
  • 30
    • 0034627935 scopus 로고    scopus 로고
    • Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
    • Kolisch, R., and, Hess, K. 2000. Efficient Methods for Scheduling Make-to-order Assemblies under Resource, Assembly Area and Part Availability Constraints. International Journal of Production Research, 38 (1): 207-228.
    • (2000) International Journal of Production Research , vol.38 , Issue.1 , pp. 207-228
    • Kolisch, R.1    Hess, K.2
  • 31
    • 0035371718 scopus 로고    scopus 로고
    • The three-stage assembly flowshop scheduling problem
    • Koulamas, Christos, and, Kyparisis, George J. 2001. The Three-stage Assembly Flowshop Scheduling Problem. Computers & Operations Research, 28 (7): 689-704.
    • (2001) Computers & Operations Research , vol.28 , Issue.7 , pp. 689-704
    • Koulamas, C.1    Kyparisis, G.J.2
  • 32
    • 0024714899 scopus 로고
    • Aggregate scheduling of a flexible machining and assembly system
    • Kusaik, A. 1989. Aggregate Scheduling of a Flexible Machining and Assembly System. IEEE Transactions on Robotics and Automation, 5: 451-459.
    • (1989) IEEE Transactions on Robotics and Automation , vol.5 , pp. 451-459
    • Kusaik, A.1
  • 33
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • Lee, C. Y., Cheng, T. C. E., and, Lin, B. M. T. 1993. Minimizing the Makespan in the 3-Machine Assembly-type Flowshop Scheduling Problem. Management Science JSTOR, 39 (5): 616-625.
    • (1993) Management Science JSTOR , vol.39 , Issue.5 , pp. 616-625
    • Lee, C.Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 35
    • 78649822911 scopus 로고    scopus 로고
    • Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
    • Lu, H. L., George, Q. Huang, and, Yang, H. D. 2011. Integrating Order Review/Release and Dispatching Rules for Assembly Job Shop Scheduling Using a Simulation Approach. International Journal of Production Research, 49 (3): 647-669.
    • (2011) International Journal of Production Research , vol.49 , Issue.3 , pp. 647-669
    • Lu, H.L.1    George, Q.H.2    Yang, H.D.3
  • 36
    • 34250824658 scopus 로고    scopus 로고
    • Dynamic scheduling of production-assembly networks in a distributed environment
    • Masin, Michael, Melike Oz, Pasaogullari, and, Sanjay, Joshi. 2000. Dynamic Scheduling of Production-assembly Networks in a Distributed Environment. IIE Transactions, 39 (4): 395-409.
    • (2000) IIE Transactions , vol.39 , Issue.4 , pp. 395-409
    • Masin, M.1    Melike Oz, P.2    Sanjay, J.3
  • 37
    • 1342308533 scopus 로고    scopus 로고
    • Rescheduling strategies for minimizing total weighted tardiness in complex job shops
    • Mason, S. J., Jin, S., and, Wessels, C. M. 2004. Rescheduling Strategies for Minimizing Total Weighted Tardiness in Complex Job Shops. International Journal of Production Research, 42: 613-628.
    • (2004) International Journal of Production Research , vol.42 , pp. 613-628
    • Mason, S.J.1    Jin, S.2    Wessels, C.M.3
  • 38
    • 0032142734 scopus 로고    scopus 로고
    • Minimizing production flow time in a process and assembly job shop
    • McCoy, D. H. C., and, Egbelu, P. J. 1998. Minimizing Production Flow Time in a Process and Assembly Job Shop. International Journal of Production Research, 36 (8): 2315-2332.
    • (1998) International Journal of Production Research , vol.36 , Issue.8 , pp. 2315-2332
    • McCoy, D.H.C.1    Egbelu, P.J.2
  • 41
    • 68249099005 scopus 로고    scopus 로고
    • A survey of dynamic scheduling in manufacturing systems
    • Ouelhadj, Djamila, and, Petrovic, Sanja. 2009. A Survey of Dynamic Scheduling in Manufacturing Systems. Journal of Scheduling, 12: 417-431.
    • (2009) Journal of Scheduling , vol.12 , pp. 417-431
    • Ouelhadj, D.1    Petrovic, S.2
  • 42
    • 70449587009 scopus 로고    scopus 로고
    • Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
    • Ozlen, Melih, and, Azizoglu, Meral. 2009. Generating All Efficient Solutions of a Rescheduling Problem on Unrelated Parallel Machines. International Journal of Production Research, 47 (19): 5245-5270.
    • (2009) International Journal of Production Research , vol.47 , Issue.19 , pp. 5245-5270
    • Ozlen, M.1    Azizoglu, M.2
  • 43
    • 0033075592 scopus 로고    scopus 로고
    • A heuristic algorithm for a production scheduling problem in an assembly system
    • Park, M. W., and, Kim, Y. D. 1999. A Heuristic Algorithm for a Production Scheduling Problem in an Assembly System. Journal of Operational Research Society, 50: 138-147.
    • (1999) Journal of Operational Research Society , vol.50 , pp. 138-147
    • Park, M.W.1    Kim, Y.D.2
  • 44
    • 0033736797 scopus 로고    scopus 로고
    • A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
    • Park, M. W., and, Kim, Y. D. 2000. A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System under Due Date Constraints. European Journal of Operational Research, 123 (3): 504-518.
    • (2000) European Journal of Operational Research , vol.123 , Issue.3 , pp. 504-518
    • Park, M.W.1    Kim, Y.D.2
  • 45
    • 84866641567 scopus 로고    scopus 로고
    • An integrative heuristic method for detailed operations scheduling in assembly job shop systems
    • Pereira Mario T., and Miguel C. Santoro 2011. "An Integrative Heuristic Method for Detailed Operations Scheduling in Assembly Job Shop Systems." International Journal of Production Research iFirst: 1-17.
    • (2011) International Journal of Production Research IFirst , pp. 1-17
    • Pereira Mario, T.1    Santoro, M.C.2
  • 46
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoon, P. R., Russel, R. S. L., and, Fry, T. D. 1991. A Preliminary Investigation of Multi-attribute Based Sequencing Rules for Assembly Shops. International Journal of Production Research, 29 (4): 739-753.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 739-753
    • Philipoon, P.R.1    Russel, R.S.L.2    Fry, T.D.3
  • 48
    • 0037063279 scopus 로고    scopus 로고
    • Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
    • Pongcharoen, P., Hicks, C., Braiden, P. M., and, Stewardson, D. J. 2002. Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products. International Journal of Production Economics, 78 (3): 311-322.
    • (2002) International Journal of Production Economics , vol.78 , Issue.3 , pp. 311-322
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3    Stewardson, D.J.4
  • 49
    • 0141636312 scopus 로고    scopus 로고
    • The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
    • Pongcharoen, P., Hicks, C., and, Braiden, P. M. 2004. The Development of Genetic Algorithms for the Finite Capacity Scheduling of Complex Products, with Multiple Levels of Product Structure. European Journal of Operational Research, 152: 215-225.
    • (2004) European Journal of Operational Research , vol.152 , pp. 215-225
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3
  • 51
    • 84870947362 scopus 로고    scopus 로고
    • A case of implementing rfid-based real-time shop-floor material management for household electrical appliance manufacturers
    • doi:10.1007/s10845-010-0476-2
    • Qu T., H. D. Yang, Q. H. George, Y. F. Zhang, H. Luo, and W. Qin. 2010. "A Case of Implementing RFID-based Real-time Shop-floor Material Management for Household Electrical Appliance Manufacturers." Journal of Intelligent Manufacturing 23: 2343-2356. doi:10.1007/s10845-010-0476-2.
    • (2010) Journal of Intelligent Manufacturing , vol.23 , pp. 2343-2356
    • Qu, T.1    Yang, H.D.2    George, Q.H.3    Zhang, Y.F.4    Luo, H.5    Qin, W.6
  • 53
    • 79952750723 scopus 로고    scopus 로고
    • A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
    • Shokrollahpour, E., Zandieh, M., and, Dorri, Behrouz. 2011. A Novel Imperialist Competitive Algorithm for Bi-criteria Scheduling of the Assembly Flowshop Problem. International Journal of Production Research, 49 (11): 3087-3103.
    • (2011) International Journal of Production Research , vol.49 , Issue.11 , pp. 3087-3103
    • Shokrollahpour, E.1    Zandieh, M.2    Dorri, B.3
  • 55
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic rescheduling mechanism for responding to changes of production orders and manufacturing resources
    • Sun, J., and, Xue, D. 2001. A Dynamic Rescheduling Mechanism for Responding to Changes of Production Orders and Manufacturing Resources. Computers in Industry, 46: 89-207.
    • (2001) Computers in Industry , vol.46 , pp. 89-207
    • Sun, J.1    Xue, D.2
  • 56
    • 0037402009 scopus 로고    scopus 로고
    • Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
    • Sun, Xi, Morizawa, Kazuko, and, Nagasawa, Hiroyuki. 2003. Powerful Heuristics to Minimize Makespan in Fixed, 3-Machine, Assembly-Type Flowshop Scheduling. European Journal of Operational Research, 146 (3): 498-516.
    • (2003) European Journal of Operational Research , vol.146 , Issue.3 , pp. 498-516
    • Sun, X.1    Morizawa, K.2    Nagasawa, H.3
  • 58
    • 28044452691 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
    • Thiagarajan, S., and, Rajendran, C. 2005. Scheduling in Dynamic Assembly Job-shops to Minimize the Sum of Weighted Earliness, Weighted Tardiness and Weighted Flowtime of Jobs. Computer and Industrial Engineering, 49: 463-503.
    • (2005) Computer and Industrial Engineering , vol.49 , pp. 463-503
    • Thiagarajan, S.1    Rajendran, C.2
  • 59
    • 77956619682 scopus 로고    scopus 로고
    • Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
    • Torabzadeh, E., and, Zandieh, M. 2010. Cloud Theory-based Simulated Annealing Approach for Scheduling in the Two-stage Assembly Flowshop. Advances in Engineering Software, 41 (10-11): 1238-1243.
    • (2010) Advances in Engineering Software , vol.41 , Issue.1011 , pp. 1238-1243
    • Torabzadeh, E.1    Zandieh, M.2
  • 60
    • 0037290545 scopus 로고    scopus 로고
    • A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
    • Tozkapan, Omer Kirca, and, Chung, Chia-Shin. 2003. A Branch and Bound Algorithm to Minimize the Total Weighted Flowtime for the Two-stage Assembly Scheduling Problem. Computers & Operations Research, 30 (2): 309-320.
    • (2003) Computers & Operations Research , vol.30 , Issue.2 , pp. 309-320
    • Tozkapan, O.K.1    Chung, C.-S.2
  • 61
    • 70749158552 scopus 로고    scopus 로고
    • Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties
    • Turkcan, Ayten, Akturk, Selim M., and, Storer, Robert H. 2009. Predictive/Reactive Scheduling with Controllable Processing times and Earliness-Tardiness Penalties. IIE Transactions, 41 (12): 1080-1095.
    • (2009) IIE Transactions , vol.41 , Issue.12 , pp. 1080-1095
    • Turkcan, A.1    Akturk, S.M.2    Storer, R.H.3
  • 62
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machine systems
    • Vieira, G. E., Hermann, J. W., and, Lin, Edward. 2000. Predicting the Performance of Rescheduling Strategies for Parallel Machine Systems. Journal of Manufacturing System, 19 (4): 256-266.
    • (2000) Journal of Manufacturing System , vol.19 , Issue.4 , pp. 256-266
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 63
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies and methods
    • Vieira, G. E., Hermann, J. W., and, Lin, Edward. 2003. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies and Methods. Journal of Scheduling, 6: 39-62.
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Hermann, J.W.2    Lin, E.3
  • 64
    • 33746794581 scopus 로고    scopus 로고
    • Integrated process planning and scheduling/rescheduling-an agent-based approach
    • Wong, T. N., Leung, C. W., Mak, K. L., and, Fung, R. Y. K. 2006. Integrated Process Planning and Scheduling/Rescheduling-An Agent-based Approach. International Journal of Production Research, 44 (18-19): 3627-3655.
    • (2006) International Journal of Production Research , vol.44 , Issue.1819 , pp. 3627-3655
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 65
    • 0142154202 scopus 로고    scopus 로고
    • The application of adaptive genetic algorithms in fms dynamic rescheduling
    • Yang, Honghong, and, Zhiming, Wu. 2003. The Application of Adaptive Genetic Algorithms in FMS Dynamic Rescheduling. International Journal of Computer Integrated Manufacturing, 16 (6): 382-397.
    • (2003) International Journal of Computer Integrated Manufacturing , vol.16 , Issue.6 , pp. 382-397
    • Yang, H.1    Zhiming, W.2
  • 66
    • 0035929101 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with assembly operations
    • Yokoyama, M. 2001. Hybrid Flow Shop Scheduling with Assembly Operations. International Journal of Production Economics, 73 (1): 103-116.
    • (2001) International Journal of Production Economics , vol.73 , Issue.1 , pp. 103-116
    • Yokoyama, M.1
  • 67
    • 36849060379 scopus 로고    scopus 로고
    • Flow-shop scheduling with setup and assembly operations
    • Yokoyama, Masao. 2008. Flow-shop Scheduling with Setup and Assembly Operations. European Journal of Operational Research, 187 (3): 1184-1195.
    • (2008) European Journal of Operational Research , vol.187 , Issue.3 , pp. 1184-1195
    • Yokoyama, M.1
  • 68
    • 7444246192 scopus 로고    scopus 로고
    • Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
    • Yokoyama, Masao, and, Santos, Daryl L. 2005. Three-stage Flow-shop Scheduling with Assembly Operations to Minimize the Weighted Sum of Product Completion Times. European Journal of Operational Research, 161 (3): 754-770.
    • (2005) European Journal of Operational Research , vol.161 , Issue.3 , pp. 754-770
    • Yokoyama, M.1    Santos, D.L.2
  • 70
    • 79957498356 scopus 로고    scopus 로고
    • Real-time work-in-progress management for smart object-enabled ubiquitous shop-floor environment
    • Zhang, Yingfeng, Ho, Oscar, Qu, T., and, George, H. Q. 2011. Real-time Work-in-Progress Management for Smart Object-enabled Ubiquitous Shop-floor Environment. International Journal of Computer Integrated Manufacturing, 24 (5): 431-445.
    • (2011) International Journal of Computer Integrated Manufacturing , vol.24 , Issue.5 , pp. 431-445
    • Zhang, Y.1    Ho, O.2    Qu, T.3    George, H.Q.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.