-
2
-
-
0032710315
-
Match-up scheduling under a machine breakdown
-
Akturk, S. M., and, Gorgulu, E. 1999. Match-up Scheduling under a Machine Breakdown. European Journal of Operational Research, 112 (1): 81-97.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 81-97
-
-
Akturk, S.M.1
Gorgulu, E.2
-
3
-
-
34147159638
-
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
-
Al-Anzi, Fawaz S., and, Allahverdi, Ali. 2007. A Self-adaptive Differential Evolution Heuristic for Two-stage Assembly Scheduling Problem to Minimize Maximum Lateness with Setup Times. European Journal of Operational Research, 182 (1): 80-94.
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.1
, pp. 80-94
-
-
Al-Anzi, F.S.1
Allahverdi, A.2
-
4
-
-
60349093593
-
Heuristics for a two-stage assembly flow shop with bicriteria of maximum lateness and makespan
-
Al-Anzi, Fawaz S., and, Allahverdi, Ali. 2009. Heuristics for a Two-stage Assembly Flow Shop with Bicriteria of Maximum Lateness and Makespan. Computers & Operations Research, 36: 2682-2689.
-
(2009)
Computers & Operations Research
, vol.36
, pp. 2682-2689
-
-
Al-Anzi, F.S.1
Allahverdi, A.2
-
5
-
-
27144557504
-
A pso and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application
-
Allahverdi, Ali, and, Al-Anzi, Fawaz S. 2006. A PSO and a Tabu Search Heuristics for the Assembly Scheduling Problem of the Two-stage Distributed Database Application. Computers & Operations Research, 33 (4): 1056-1080.
-
(2006)
Computers & Operations Research
, vol.33
, Issue.4
, pp. 1056-1080
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
6
-
-
0030241635
-
A hybrid ga-sa algorithm for just-in-time scheduling of multilevel-assemblies
-
Anthony, Roach, and, Nagi, Rakesh. 1996. A Hybrid GA-SA Algorithm for Just-in-time Scheduling of Multilevel-assemblies. Computer and Industrial Engineering, 30 (4): 1047-1060.
-
(1996)
Computer and Industrial Engineering
, vol.30
, Issue.4
, pp. 1047-1060
-
-
Anthony, R.1
Nagi, R.2
-
7
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
Aytug, H., Lawley, M. A., Mckay, K., Mohan, S., and, Uzsoy, R. 2005. Executing Production Schedules in the Face of Uncertainties: A Review and Some Future Directions. European Journal of Operational Research, 161: 86-110.
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
8
-
-
28144451536
-
Parallel machine rescheduling with machine disruptions
-
Azizoglu, M., and, Alagoz, O. 2005. Parallel Machine Rescheduling with Machine Disruptions. IIE Transactions, 37: 1113-1118.
-
(2005)
IIE Transactions
, vol.37
, pp. 1113-1118
-
-
Azizoglu, M.1
Alagoz, O.2
-
10
-
-
84871320047
-
Heuristics for production scheduling problem with machining and assembly operations
-
doi: 10.5267/j.ijiec.2011.09.0033
-
Bhongade, A. S., and, Khodke, P. M. 2012. Heuristics for Production Scheduling Problem with Machining and Assembly Operations. International Journal of Industrial Engineering Computations, 2: 185-198. doi: 10.5267/j.ijiec.2011. 09.0033
-
(2012)
International Journal of Industrial Engineering Computations
, vol.2
, pp. 185-198
-
-
Bhongade, A.S.1
Khodke, P.M.2
-
11
-
-
46649113169
-
An online approach to dynamic, rescheduling for production planning applications
-
Caricato, Pierpaolo, and, Antonio, Grieco. 2008. An Online Approach to Dynamic, Rescheduling for Production Planning Applications. International Journal of Production Research, 46 (16): 4597-4617.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.16
, pp. 4597-4617
-
-
Caricato, P.1
Antonio, G.2
-
12
-
-
1442356681
-
Concurrent flowshop scheduling to minimize makespan
-
Christos, Koulamas, and, Kyparisis, George J. 2004. Concurrent Flowshop Scheduling to Minimize Makespan. European Journal of Operational Research, 156 (2): 524-529.
-
(2004)
European Journal of Operational Research
, vol.156
, Issue.2
, pp. 524-529
-
-
Christos, K.1
Kyparisis, G.J.2
-
13
-
-
6744240014
-
Towards intelligent integrated planning-execution
-
Chu, B., J. Long, W. J. Tolone, R. Wilhelm, Y. Peng, T. Finin, and M. Matthews. 1997. "Towards Intelligent Integrated Planning-execution." International Journal of Advanced Manufacturing Systems 1 (1): 77-83.
-
(1997)
International Journal of Advanced Manufacturing Systems
, vol.1
, Issue.1
, pp. 77-83
-
-
Chu, B.1
Long, J.2
Tolone, W.J.3
Wilhelm, R.4
Peng, Y.5
Finin, T.6
Matthews, M.7
-
14
-
-
84863414134
-
Radio frequency identification-enabled real-time manufacturing execution system: A case study in an automotive part manufacturer
-
Dai, Q. Y., Zhong, R. Y., Huang, G. Q., Qu, T., Zhang, T., and, Luo, T. Y. 2012. Radio Frequency Identification-enabled Real-time Manufacturing Execution System: A Case Study in an Automotive Part Manufacturer. International Journal of Computer Integrated Manufacturing, 25 (1): 51-65.
-
(2012)
International Journal of Computer Integrated Manufacturing
, vol.25
, Issue.1
, pp. 51-65
-
-
Dai, Q.Y.1
Zhong, R.Y.2
Huang, G.Q.3
Qu, T.4
Zhang, T.5
Luo, T.Y.6
-
15
-
-
0027608514
-
Scheduling for machining and assembly in a job-shop environment
-
Doctor, S. R., Cavalier, T. M., and, Egbelu, P. J. 1993. Scheduling for Machining and Assembly in a Job-shop Environment. International Journal of Production Research, 31 (6): 1275-1297.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.6
, pp. 1275-1297
-
-
Doctor, S.R.1
Cavalier, T.M.2
Egbelu, P.J.3
-
16
-
-
84882456750
-
Production rescheduling for machine breakdown at a job shop
-
Dong, Yao-Hsiang, and, Jang, Jaejin. 2012. Production Rescheduling for Machine Breakdown at a Job Shop. International Journal of Production Research, 50 (10): 2681-2691.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.10
, pp. 2681-2691
-
-
Dong, Y.-H.1
Jang, J.2
-
17
-
-
0024641735
-
The effect of product structure and sequencing rule on assembly shop performance
-
Fry, T. D., Olife, M. D., Minor, E. D., and, Keong, Leong G. 1989. The Effect of Product Structure and Sequencing Rule on Assembly Shop Performance. International Journal of Production Research, 27 (4): 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 671-686
-
-
Fry, T.D.1
Olife, M.D.2
Minor, E.D.3
Keong, L.G.4
-
18
-
-
53049105843
-
A particle swarm-based genetic algorithm for scheduling in an agile environment
-
Gaafar, Lotfi K., Masoud, Sherif A., and, Nassef, Ashraf O. 2008. A Particle Swarm-based Genetic Algorithm for Scheduling in an Agile Environment. Computer and Industrial Engineering, 55: 707-720.
-
(2008)
Computer and Industrial Engineering
, vol.55
, pp. 707-720
-
-
Gaafar, L.K.1
Masoud, S.A.2
Nassef, A.O.3
-
19
-
-
78349255892
-
A discrete time reactive scheduling model for new order insertion in job shop, make-to order industries
-
Gomes, Marta Castilho, Barbosa-Póvoa, Ana Paula, and, Novais, Augusto Queiroz. 2010. A Discrete Time Reactive Scheduling Model for New Order Insertion in Job Shop, Make-to Order Industries. International Journal of Production Research, 48 (24): 7395-7422.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.24
, pp. 7395-7422
-
-
Gomes, M.C.1
Barbosa-Póvoa, A.P.2
Novais, A.Q.3
-
20
-
-
0032679037
-
Rescheduling and optimization of schedules considering machine failures
-
Guo, Bo, and, Nonaka, Yasuo. 1999. Rescheduling and Optimization of Schedules Considering Machine Failures. International Journal of Production Economics, 60-61: 503-513.
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 503-513
-
-
Guo, B.1
Nonaka, Y.2
-
21
-
-
0031351397
-
A branch and bound algorithm for the two-stage assembly scheduling problem
-
Hariri, A. M. A., and, Potts, C. N. 1997. A Branch and Bound Algorithm for the Two-stage Assembly Scheduling Problem. European Journal of Operational Research, 103 (3): 547-556.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.3
, pp. 547-556
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
22
-
-
77957867487
-
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence dependent setup times
-
Hatami, Sara, Ebrahimnejad, Sadalah, Tavakkoli-Moghaddam, Reza, and, Maboudian, Yasaman. 2010. Two Meta-heuristics for Three-stage Assembly Flowshop Scheduling with Sequence Dependent Setup Times. International Journal of Advance Manufacturing Technology, 50 (9-12): 1153-1164.
-
(2010)
International Journal of Advance Manufacturing Technology
, vol.50
, Issue.912
, pp. 1153-1164
-
-
Hatami, S.1
Ebrahimnejad, S.2
Tavakkoli-Moghaddam, R.3
Maboudian, Y.4
-
23
-
-
0037143044
-
Scheduling manufacturing systems for delayed product differentiation in agile manufacturing
-
He, D., and, Babayan, A. 2002. Scheduling Manufacturing Systems for Delayed Product Differentiation in Agile Manufacturing. International Journal of Production Research, 40 (11): 2461-2481.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2461-2481
-
-
He, D.1
Babayan, A.2
-
24
-
-
0021424669
-
A comparative study of priority dispatching rules in a hybrid assembly/job shop
-
Huang, P. 1984. A Comparative Study of Priority Dispatching Rules in a Hybrid Assembly/Job Shop. International Journal of Production Research, 22 (3): 375-387.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 375-387
-
-
Huang, P.1
-
26
-
-
0003075019
-
Optimal two and three-stage production schedules with setup times included
-
Johnson, S. M. 1954. Optimal Two and Three-stage Production Schedules with Setup Times Included. Naval Research Logistics Quarterly, 1: 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
27
-
-
84871191131
-
Flow shop rescheduling under different types of disruption
-
Katragjini, Ketrina, Vallada, Eva, and, Ruiz, Ruben. 2013. Flow Shop Rescheduling under Different Types of Disruption. International Journal of Production Research, 51 (3): 780-797.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.3
, pp. 780-797
-
-
Katragjini, K.1
Vallada, E.2
Ruiz, R.3
-
28
-
-
0030244109
-
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
-
Kim, J. U., and Y. D. Kim, 1996. "Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-level Product Structure." Computers and Operations Research 23 (9): 857-868.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.9
, pp. 857-868
-
-
Kim, J.U.1
Kim, Y.D.2
-
29
-
-
15744372517
-
Repair control of enterprise systems using rfid sensory data
-
Kohn, W., Brayman, V., and, Littleton, J. 2005. Repair Control of Enterprise Systems Using RFID Sensory Data. IIE Transactions, 37 (4): 281-290.
-
(2005)
IIE Transactions
, vol.37
, Issue.4
, pp. 281-290
-
-
Kohn, W.1
Brayman, V.2
Littleton, J.3
-
30
-
-
0034627935
-
Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints
-
Kolisch, R., and, Hess, K. 2000. Efficient Methods for Scheduling Make-to-order Assemblies under Resource, Assembly Area and Part Availability Constraints. International Journal of Production Research, 38 (1): 207-228.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.1
, pp. 207-228
-
-
Kolisch, R.1
Hess, K.2
-
31
-
-
0035371718
-
The three-stage assembly flowshop scheduling problem
-
Koulamas, Christos, and, Kyparisis, George J. 2001. The Three-stage Assembly Flowshop Scheduling Problem. Computers & Operations Research, 28 (7): 689-704.
-
(2001)
Computers & Operations Research
, vol.28
, Issue.7
, pp. 689-704
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
32
-
-
0024714899
-
Aggregate scheduling of a flexible machining and assembly system
-
Kusaik, A. 1989. Aggregate Scheduling of a Flexible Machining and Assembly System. IEEE Transactions on Robotics and Automation, 5: 451-459.
-
(1989)
IEEE Transactions on Robotics and Automation
, vol.5
, pp. 451-459
-
-
Kusaik, A.1
-
33
-
-
0027590319
-
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
-
Lee, C. Y., Cheng, T. C. E., and, Lin, B. M. T. 1993. Minimizing the Makespan in the 3-Machine Assembly-type Flowshop Scheduling Problem. Management Science JSTOR, 39 (5): 616-625.
-
(1993)
Management Science JSTOR
, vol.39
, Issue.5
, pp. 616-625
-
-
Lee, C.Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
34
-
-
33845775683
-
Robust and stable scheduling of a single machine with random machine breakdowns
-
Liu, Lin, Gu, Han-yu, and, Xi, Yu-geng. 2007. Robust and Stable Scheduling of a Single Machine with Random Machine Breakdowns. International Journal of Advance Manufacturing Technology, 31: 645-654.
-
(2007)
International Journal of Advance Manufacturing Technology
, vol.31
, pp. 645-654
-
-
Liu, L.1
Gu, H.-Y.2
Xi, Y.-G.3
-
35
-
-
78649822911
-
Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
-
Lu, H. L., George, Q. Huang, and, Yang, H. D. 2011. Integrating Order Review/Release and Dispatching Rules for Assembly Job Shop Scheduling Using a Simulation Approach. International Journal of Production Research, 49 (3): 647-669.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.3
, pp. 647-669
-
-
Lu, H.L.1
George, Q.H.2
Yang, H.D.3
-
36
-
-
34250824658
-
Dynamic scheduling of production-assembly networks in a distributed environment
-
Masin, Michael, Melike Oz, Pasaogullari, and, Sanjay, Joshi. 2000. Dynamic Scheduling of Production-assembly Networks in a Distributed Environment. IIE Transactions, 39 (4): 395-409.
-
(2000)
IIE Transactions
, vol.39
, Issue.4
, pp. 395-409
-
-
Masin, M.1
Melike Oz, P.2
Sanjay, J.3
-
37
-
-
1342308533
-
Rescheduling strategies for minimizing total weighted tardiness in complex job shops
-
Mason, S. J., Jin, S., and, Wessels, C. M. 2004. Rescheduling Strategies for Minimizing Total Weighted Tardiness in Complex Job Shops. International Journal of Production Research, 42: 613-628.
-
(2004)
International Journal of Production Research
, vol.42
, pp. 613-628
-
-
Mason, S.J.1
Jin, S.2
Wessels, C.M.3
-
38
-
-
0032142734
-
Minimizing production flow time in a process and assembly job shop
-
McCoy, D. H. C., and, Egbelu, P. J. 1998. Minimizing Production Flow Time in a Process and Assembly Job Shop. International Journal of Production Research, 36 (8): 2315-2332.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.8
, pp. 2315-2332
-
-
McCoy, D.H.C.1
Egbelu, P.J.2
-
39
-
-
0141792959
-
Auto id systems and intelligent manufacturing control
-
McFarlane, D., Sarma, S., Chirn, J. L., Wong, C. Y., and, Ashton, K. 2003. Auto ID Systems and Intelligent Manufacturing Control. Engineering Applications of Artificial Intelligence, 16: 365-376.
-
(2003)
Engineering Applications of Artificial Intelligence
, vol.16
, pp. 365-376
-
-
McFarlane, D.1
Sarma, S.2
Chirn, J.L.3
Wong, C.Y.4
Ashton, K.5
-
40
-
-
84858012506
-
Match-up approaches to a dynamic rescheduling problem
-
Moratori, Patrick, Petrovic, Sanja, and, Vazquez-Rodriguez, Jose Antonio. 2012. Match-up Approaches to a Dynamic Rescheduling Problem. International Journal of Production Research, 50 (1): 261-276.
-
(2012)
International Journal of Production Research
, vol.50
, Issue.1
, pp. 261-276
-
-
Moratori, P.1
Petrovic, S.2
Vazquez-Rodriguez, J.A.3
-
41
-
-
68249099005
-
A survey of dynamic scheduling in manufacturing systems
-
Ouelhadj, Djamila, and, Petrovic, Sanja. 2009. A Survey of Dynamic Scheduling in Manufacturing Systems. Journal of Scheduling, 12: 417-431.
-
(2009)
Journal of Scheduling
, vol.12
, pp. 417-431
-
-
Ouelhadj, D.1
Petrovic, S.2
-
42
-
-
70449587009
-
Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
-
Ozlen, Melih, and, Azizoglu, Meral. 2009. Generating All Efficient Solutions of a Rescheduling Problem on Unrelated Parallel Machines. International Journal of Production Research, 47 (19): 5245-5270.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.19
, pp. 5245-5270
-
-
Ozlen, M.1
Azizoglu, M.2
-
43
-
-
0033075592
-
A heuristic algorithm for a production scheduling problem in an assembly system
-
Park, M. W., and, Kim, Y. D. 1999. A Heuristic Algorithm for a Production Scheduling Problem in an Assembly System. Journal of Operational Research Society, 50: 138-147.
-
(1999)
Journal of Operational Research Society
, vol.50
, pp. 138-147
-
-
Park, M.W.1
Kim, Y.D.2
-
44
-
-
0033736797
-
A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints
-
Park, M. W., and, Kim, Y. D. 2000. A Branch and Bound Algorithm for a Production Scheduling Problem in an Assembly System under Due Date Constraints. European Journal of Operational Research, 123 (3): 504-518.
-
(2000)
European Journal of Operational Research
, vol.123
, Issue.3
, pp. 504-518
-
-
Park, M.W.1
Kim, Y.D.2
-
45
-
-
84866641567
-
An integrative heuristic method for detailed operations scheduling in assembly job shop systems
-
Pereira Mario T., and Miguel C. Santoro 2011. "An Integrative Heuristic Method for Detailed Operations Scheduling in Assembly Job Shop Systems." International Journal of Production Research iFirst: 1-17.
-
(2011)
International Journal of Production Research IFirst
, pp. 1-17
-
-
Pereira Mario, T.1
Santoro, M.C.2
-
46
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoon, P. R., Russel, R. S. L., and, Fry, T. D. 1991. A Preliminary Investigation of Multi-attribute Based Sequencing Rules for Assembly Shops. International Journal of Production Research, 29 (4): 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoon, P.R.1
Russel, R.S.L.2
Fry, T.D.3
-
48
-
-
0037063279
-
Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
-
Pongcharoen, P., Hicks, C., Braiden, P. M., and, Stewardson, D. J. 2002. Determining Optimum Genetic Algorithm Parameters for Scheduling the Manufacturing and Assembly of Complex Products. International Journal of Production Economics, 78 (3): 311-322.
-
(2002)
International Journal of Production Economics
, vol.78
, Issue.3
, pp. 311-322
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
Stewardson, D.J.4
-
49
-
-
0141636312
-
The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
-
Pongcharoen, P., Hicks, C., and, Braiden, P. M. 2004. The Development of Genetic Algorithms for the Finite Capacity Scheduling of Complex Products, with Multiple Levels of Product Structure. European Journal of Operational Research, 152: 215-225.
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 215-225
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
-
50
-
-
0000655488
-
The two stage assembly scheduling problem: Complexity and approximation
-
Potts, C. N., Sevastjanov, S. V., Strusevich, V. A., Van Wassenhove, L. N., and, Zwaneveld, C. M. 1995. The Two Stage Assembly Scheduling Problem: Complexity and Approximation. Operations Research, 43: 346-355.
-
(1995)
Operations Research
, vol.43
, pp. 346-355
-
-
Potts, C.N.1
Sevastjanov, S.V.2
Strusevich, V.A.3
Van Wassenhove, L.N.4
Zwaneveld, C.M.5
-
51
-
-
84870947362
-
A case of implementing rfid-based real-time shop-floor material management for household electrical appliance manufacturers
-
doi:10.1007/s10845-010-0476-2
-
Qu T., H. D. Yang, Q. H. George, Y. F. Zhang, H. Luo, and W. Qin. 2010. "A Case of Implementing RFID-based Real-time Shop-floor Material Management for Household Electrical Appliance Manufacturers." Journal of Intelligent Manufacturing 23: 2343-2356. doi:10.1007/s10845-010-0476-2.
-
(2010)
Journal of Intelligent Manufacturing
, vol.23
, pp. 2343-2356
-
-
Qu, T.1
Yang, H.D.2
George, Q.H.3
Zhang, Y.F.4
Luo, H.5
Qin, W.6
-
52
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell, W. G. Jr., and, Kurz, M. B. 2004. Dynamic Rescheduling That Simultaneously Considers Efficiency and Stability. Computer & Industrial Engineering, 46: 1-15.
-
(2004)
Computer & Industrial Engineering
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell Jr., W.G.2
Kurz, M.B.3
-
53
-
-
79952750723
-
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
-
Shokrollahpour, E., Zandieh, M., and, Dorri, Behrouz. 2011. A Novel Imperialist Competitive Algorithm for Bi-criteria Scheduling of the Assembly Flowshop Problem. International Journal of Production Research, 49 (11): 3087-3103.
-
(2011)
International Journal of Production Research
, vol.49
, Issue.11
, pp. 3087-3103
-
-
Shokrollahpour, E.1
Zandieh, M.2
Dorri, B.3
-
55
-
-
0344320671
-
A dynamic rescheduling mechanism for responding to changes of production orders and manufacturing resources
-
Sun, J., and, Xue, D. 2001. A Dynamic Rescheduling Mechanism for Responding to Changes of Production Orders and Manufacturing Resources. Computers in Industry, 46: 89-207.
-
(2001)
Computers in Industry
, vol.46
, pp. 89-207
-
-
Sun, J.1
Xue, D.2
-
56
-
-
0037402009
-
Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
-
Sun, Xi, Morizawa, Kazuko, and, Nagasawa, Hiroyuki. 2003. Powerful Heuristics to Minimize Makespan in Fixed, 3-Machine, Assembly-Type Flowshop Scheduling. European Journal of Operational Research, 146 (3): 498-516.
-
(2003)
European Journal of Operational Research
, vol.146
, Issue.3
, pp. 498-516
-
-
Sun, X.1
Morizawa, K.2
Nagasawa, H.3
-
57
-
-
42949126809
-
Evolutional reactive scheduling for agile manufacturing systems
-
Tanimizu, Y., Sakaguchi, T., Iwamura, K., and, Sugimura, N. 2006. Evolutional Reactive Scheduling for Agile Manufacturing Systems. International Journal of Production Research, 44 (18-19): 3727-3742.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.1819
, pp. 3727-3742
-
-
Tanimizu, Y.1
Sakaguchi, T.2
Iwamura, K.3
Sugimura, N.4
-
58
-
-
28044452691
-
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
-
Thiagarajan, S., and, Rajendran, C. 2005. Scheduling in Dynamic Assembly Job-shops to Minimize the Sum of Weighted Earliness, Weighted Tardiness and Weighted Flowtime of Jobs. Computer and Industrial Engineering, 49: 463-503.
-
(2005)
Computer and Industrial Engineering
, vol.49
, pp. 463-503
-
-
Thiagarajan, S.1
Rajendran, C.2
-
59
-
-
77956619682
-
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
-
Torabzadeh, E., and, Zandieh, M. 2010. Cloud Theory-based Simulated Annealing Approach for Scheduling in the Two-stage Assembly Flowshop. Advances in Engineering Software, 41 (10-11): 1238-1243.
-
(2010)
Advances in Engineering Software
, vol.41
, Issue.1011
, pp. 1238-1243
-
-
Torabzadeh, E.1
Zandieh, M.2
-
60
-
-
0037290545
-
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
-
Tozkapan, Omer Kirca, and, Chung, Chia-Shin. 2003. A Branch and Bound Algorithm to Minimize the Total Weighted Flowtime for the Two-stage Assembly Scheduling Problem. Computers & Operations Research, 30 (2): 309-320.
-
(2003)
Computers & Operations Research
, vol.30
, Issue.2
, pp. 309-320
-
-
Tozkapan, O.K.1
Chung, C.-S.2
-
61
-
-
70749158552
-
Predictive/reactive scheduling with controllable processing times and earliness-tardiness penalties
-
Turkcan, Ayten, Akturk, Selim M., and, Storer, Robert H. 2009. Predictive/Reactive Scheduling with Controllable Processing times and Earliness-Tardiness Penalties. IIE Transactions, 41 (12): 1080-1095.
-
(2009)
IIE Transactions
, vol.41
, Issue.12
, pp. 1080-1095
-
-
Turkcan, A.1
Akturk, S.M.2
Storer, R.H.3
-
62
-
-
0040518040
-
Predicting the performance of rescheduling strategies for parallel machine systems
-
Vieira, G. E., Hermann, J. W., and, Lin, Edward. 2000. Predicting the Performance of Rescheduling Strategies for Parallel Machine Systems. Journal of Manufacturing System, 19 (4): 256-266.
-
(2000)
Journal of Manufacturing System
, vol.19
, Issue.4
, pp. 256-266
-
-
Vieira, G.E.1
Hermann, J.W.2
Lin, E.3
-
63
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies and methods
-
Vieira, G. E., Hermann, J. W., and, Lin, Edward. 2003. Rescheduling Manufacturing Systems: A Framework of Strategies, Policies and Methods. Journal of Scheduling, 6: 39-62.
-
(2003)
Journal of Scheduling
, vol.6
, pp. 39-62
-
-
Vieira, G.E.1
Hermann, J.W.2
Lin, E.3
-
64
-
-
33746794581
-
Integrated process planning and scheduling/rescheduling-an agent-based approach
-
Wong, T. N., Leung, C. W., Mak, K. L., and, Fung, R. Y. K. 2006. Integrated Process Planning and Scheduling/Rescheduling-An Agent-based Approach. International Journal of Production Research, 44 (18-19): 3627-3655.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.1819
, pp. 3627-3655
-
-
Wong, T.N.1
Leung, C.W.2
Mak, K.L.3
Fung, R.Y.K.4
-
65
-
-
0142154202
-
The application of adaptive genetic algorithms in fms dynamic rescheduling
-
Yang, Honghong, and, Zhiming, Wu. 2003. The Application of Adaptive Genetic Algorithms in FMS Dynamic Rescheduling. International Journal of Computer Integrated Manufacturing, 16 (6): 382-397.
-
(2003)
International Journal of Computer Integrated Manufacturing
, vol.16
, Issue.6
, pp. 382-397
-
-
Yang, H.1
Zhiming, W.2
-
66
-
-
0035929101
-
Hybrid flow shop scheduling with assembly operations
-
Yokoyama, M. 2001. Hybrid Flow Shop Scheduling with Assembly Operations. International Journal of Production Economics, 73 (1): 103-116.
-
(2001)
International Journal of Production Economics
, vol.73
, Issue.1
, pp. 103-116
-
-
Yokoyama, M.1
-
67
-
-
36849060379
-
Flow-shop scheduling with setup and assembly operations
-
Yokoyama, Masao. 2008. Flow-shop Scheduling with Setup and Assembly Operations. European Journal of Operational Research, 187 (3): 1184-1195.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.3
, pp. 1184-1195
-
-
Yokoyama, M.1
-
68
-
-
7444246192
-
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
-
Yokoyama, Masao, and, Santos, Daryl L. 2005. Three-stage Flow-shop Scheduling with Assembly Operations to Minimize the Weighted Sum of Product Completion Times. European Journal of Operational Research, 161 (3): 754-770.
-
(2005)
European Journal of Operational Research
, vol.161
, Issue.3
, pp. 754-770
-
-
Yokoyama, M.1
Santos, D.L.2
-
69
-
-
49149120257
-
RFID-based smart kanbans for just-in-time manufacturing
-
Zhang, Y., Jiang, P., and, Huang, G. 2008. RFID-based Smart Kanbans for Just-in-time Manufacturing. International Journal of Materials and Product Technology, 33 (1/2): 170-184.
-
(2008)
International Journal of Materials and Product Technology
, vol.33
, Issue.12
, pp. 170-184
-
-
Zhang, Y.1
Jiang, P.2
Huang, G.3
-
70
-
-
79957498356
-
Real-time work-in-progress management for smart object-enabled ubiquitous shop-floor environment
-
Zhang, Yingfeng, Ho, Oscar, Qu, T., and, George, H. Q. 2011. Real-time Work-in-Progress Management for Smart Object-enabled Ubiquitous Shop-floor Environment. International Journal of Computer Integrated Manufacturing, 24 (5): 431-445.
-
(2011)
International Journal of Computer Integrated Manufacturing
, vol.24
, Issue.5
, pp. 431-445
-
-
Zhang, Y.1
Ho, O.2
Qu, T.3
George, H.Q.4
|