-
2
-
-
0000229534
-
Match-up scheduling with multiple resources, release dates and disruptions
-
Bean, C., Birge, J.B., Mittenthal, J. and Noon, C. (1991) Match-up scheduling with multiple resources, release dates and disruptions Operations Research, 39, 470-483.
-
(1991)
Operations Research
, vol.39
, pp. 470-483
-
-
Bean, C.J.1
Birge, J.B.2
Mittenthal, J.3
Noon, C.E.4
-
5
-
-
0032679037
-
Rescheduling and optimization of schedules considering machine failures
-
Guo, B. and Nonaka, Y. (1999) Rescheduling and optimization of schedules considering machine failures International Journal of Production Economics, 60/61, 503-513.
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 503-513
-
-
Guo, B.1
Nonaka, Y.2
-
6
-
-
28144461925
-
On the scheduling of identical parallel processors with arbitrary initial processor available times
-
Research Memorandum no. 88-12 School of Industrial Engineering, Purdue University, West Lafayette IN 47907, USA
-
Kaspi, M. and Montreuil, B.(1988) On the scheduling of identical parallel processors with arbitrary initial processor available times. Research Memorandum no. 88-12 School of Industrial Engineering, Purdue University, West Lafayette IN 47907, USA
-
(1988)
-
-
Kaspi, M.1
Montreuil, B.2
-
7
-
-
0003988826
-
Sequencing and scheduling: Algorithms and complexity
-
Technical report BS-R8909,Amsterdam: Centre for Mathematics and Computer Science
-
Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G. and Shmoys, D.B.(1989) Sequencing and scheduling: Algorithms and complexity. Technical report BS-R8909,Amsterdam: Centre for Mathematics and Computer Science.
-
(1989)
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
8
-
-
0026818026
-
On scheduling with ready-times, due-dates and vacations
-
Leon, V.J and Wu, S.D. (1992) On scheduling with ready-times, due-dates and vacations Naval Research Logistics, 39, 53-65.
-
(1992)
Naval Research Logistics
, vol.39
, pp. 53-65
-
-
Leon, V.J.1
Wu, S.D.2
-
9
-
-
0030270702
-
Flow-time performance of modified-scheduling heuristics in a dynamic rescheduling environment
-
Li, E.Y.-C. and Shaw, W.H. (1996) Flow-time performance of modified-scheduling heuristics in a dynamic rescheduling environment Computers&Industrial Engineering, 31, 213-216.
-
(1996)
Computers & Industrial Engineering
, vol.31
, pp. 213-216
-
-
Li, E.Y.-C.1
Shaw, W.H.2
-
10
-
-
0032183083
-
Simulation modeling of a dynamic job shop rescheduling with machine availability constraints
-
Li, E.Y.-C. and Shaw, W.H. (1998) Simulation modeling of a dynamic job shop rescheduling with machine availability constraints Computers & Industrial Engineering, 35, 117-120.
-
(1998)
Computers & Industrial Engineering
, vol.35
, pp. 117-120
-
-
Li, E.Y.-C.1
Shaw, W.H.2
-
11
-
-
0031525145
-
Rescheduling on a single machine with part-type dependent setup times and deadlines
-
Ünal, A.T., Uzsoy, R. and Kran, A. (1997) Rescheduling on a single machine with part-type dependent setup times and deadlines Annals of Operations Research, 70, 93-113.
-
(1997)
Annals of Operations Research
, vol.70
, pp. 93-113
-
-
Ünal, A.T.1
Uzsoy, R.2
Kran, A.S.3
-
12
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies and methods
-
Vieira, E. and Herrmann, J.W. and Lin, E. (2003) Rescheduling manufacturing systems: A framework of strategies, policies and methods Journal of Scheduling, 6, 39-62.
-
(2003)
Journal of Scheduling
, vol.6
, pp. 39-62
-
-
Vieira, E.1
Herrmann, J.W.2
Lin, E.3
-
13
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, D. and Storer, R. and Chang, P. (1993) One-machine rescheduling heuristics with efficiency and stability as criteria Computers & Operations Research, 20, 1-14.
-
(1993)
Computers & Operations Research
, vol.20
, pp. 1-14
-
-
Wu, D.S.1
Storer, R.H.2
Chang, P.C.3
|