메뉴 건너뛰기




Volumn 49, Issue 3, 2011, Pages 647-669

Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach

Author keywords

assembly job shop; dispatching rules; order review release; ORR; work load control

Indexed keywords

ASSEMBLY JOB SHOP; DISPATCHING RULES; ORDER REVIEW/RELEASE; ORR; WORK LOADS;

EID: 78649822911     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903524490     Document Type: Article
Times cited : (87)

References (44)
  • 1
    • 1642440941 scopus 로고
    • Even-flow, a scheduling method for reducing lateness in job shops
    • Ackerman, S., 1963. Even-flow, a scheduling method for reducing lateness in job shops. Management Technology, 3(1), 20-32.
    • (1963) Management Technology , vol.3 , Issue.1 , pp. 20-32
    • Ackerman, S.1
  • 2
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly job shops
    • Adam, N., Bertrand, J., and Surkis, J., 1987. Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 19(3), 317-328.
    • (1987) IIE Transactions , vol.19 , Issue.3 , pp. 317-328
    • Adam, N.1    Bertrand, J.2    Surkis, J.3
  • 3
    • 84985810576 scopus 로고
    • Due date assignment, job order release, and sequencing interaction in sob shop scheduling
    • Ahmed, I. and Fisher, W., 1992. Due date assignment, job order release, and sequencing interaction in sob shop scheduling. Decision Sciences, 23(3), 633-647.
    • (1992) Decision Sciences , vol.23 , Issue.3 , pp. 633-647
    • Ahmed, I.1    Fisher, W.2
  • 4
    • 70449561624 scopus 로고    scopus 로고
    • Dynamic job shop scheduling for missed due date performance
    • Alpay, S. and Yuzugullu, N., 2009. Dynamic job shop scheduling for missed due date performance. International Journal of Production Research, 47(15), 4047-4062.
    • (2009) International Journal of Production Research , vol.47 , Issue.15 , pp. 4047-4062
    • Alpay, S.1    Yuzugullu, N.2
  • 5
    • 0022714365 scopus 로고
    • Minimising mean absolute deviation of completion times about a common due date
    • Bagchi, U., Sullivan, R. S., and Chang, Y. L., 1986. Minimising mean absolute deviation of completion times about a common due date. Naval Research Logistics Quarterly, 33(2), 227-240.
    • (1986) Naval Research Logistics Quarterly , vol.33 , Issue.2 , pp. 227-240
    • Bagchi, U.1    Sullivan, R.S.2    Chang, Y.L.3
  • 6
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1987. Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26(3), 375-395.
    • (1987) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 7
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • Bergamaschi, D., et al., 1997. Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research, 35(2), 399-420.
    • (1997) International Journal of Production Research , vol.35 , Issue.2 , pp. 399-420
    • Bergamaschi, D.1
  • 9
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J., Phillips, D., and Hogg, G., 1982. A state-of-the-art survey of dispatching rules for manufacturing job shop operations. International Journal of Production Research, 20(1), 27-45.
    • (1982) International Journal of Production Research , vol.20 , Issue.1 , pp. 27-45
    • Blackstone, J.1    Phillips, D.2    Hogg, G.3
  • 10
    • 1342265978 scopus 로고    scopus 로고
    • An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments
    • Bollapragada, R. and Sadeh, N. M., 2004. An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments. International Journal of Production Research, 42(4), 693-718.
    • (2004) International Journal of Production Research , vol.42 , Issue.4 , pp. 693-718
    • Bollapragada, R.1    Sadeh, N.M.2
  • 12
    • 70449686050 scopus 로고    scopus 로고
    • The application of genetic algorithms to lot streaming in a job-shop scheduling problem
    • Chan, F. T. S., Wong, T. C., and Chan, L. Y., 2009. The application of genetic algorithms to lot streaming in a job-shop scheduling problem. International Journal of Production Research, 47(12), 3387-3412.
    • (2009) International Journal of Production Research , vol.47 , Issue.12 , pp. 3387-3412
    • Chan, F.T.S.1    Wong, T.C.2    Chan, L.Y.3
  • 13
    • 34249341750 scopus 로고    scopus 로고
    • Using dispatching rules for job shop scheduling with due date-based objectives
    • Chiang, T. C. and Fu, L. C., 2007. Using dispatching rules for job shop scheduling with due date-based objectives. International Journal of Production Research, 45(14), 3245-3262.
    • (2007) International Journal of Production Research , vol.45 , Issue.14 , pp. 3245-3262
    • Chiang, T.C.1    Fu, L.C.2
  • 14
  • 16
    • 0016319331 scopus 로고
    • A loading and balancing methodology for job shop control
    • Irastorza, J. and Deane, R., 1974. A loading and balancing methodology for job shop control. IIE Transactions, 6(4), 302-307.
    • (1974) IIE Transactions , vol.6 , Issue.4 , pp. 302-307
    • Irastorza, J.1    Deane, R.2
  • 17
    • 0019702937 scopus 로고
    • Minimising the average deviation of job completion times about a common due date
    • Kanet, J., 1981. Minimising the average deviation of job completion times about a common due date. Naval Research Logistics Quarterly, 28(4), 643-651.
    • (1981) Naval Research Logistics Quarterly , vol.28 , Issue.4 , pp. 643-651
    • Kanet, J.1
  • 18
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet, J., 1988. Load-limited order release in job shop scheduling systems. Journal of Operations Management, 7 (3/4), 44-58.
    • (1988) Journal of Operations Management , vol.7 , Issue.3-4 , pp. 44-58
    • Kanet, J.1
  • 19
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops a critical assessment
    • Land, M. and Gaalman, G., 1996. Workload control concepts in job shops a critical assessment. International Journal of Production Economics, 46-47 (1), 535-548.
    • (1996) International Journal of Production Economics , vol.46-47 , Issue.1 , pp. 535-548
    • Land, M.1    Gaalman, G.2
  • 20
    • 3342911652 scopus 로고
    • The development of a factory simulation system using actual operating data
    • Le Grande, E., 1963. The development of a factory simulation system using actual operating data. Journal of Management Technology, 3(1), 1-19.
    • (1963) Journal of Management Technology , vol.3 , Issue.1 , pp. 1-19
    • Le Grande, E.1
  • 21
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15(2), 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , Issue.2 , pp. 241-254
    • Maxwell, W.1    Mehra, M.2
  • 22
    • 0004146861 scopus 로고
    • Priority dispatching and assembly operations via job shop
    • Rand Corporation, CA
    • Maxwell, W. L., 1969. Priority dispatching and assembly operations via job shop. Report Rm-5370-PR. Rand Corporation, CA.
    • (1969) Report Rm-5370-PR
    • Maxwell, W.L.1
  • 23
    • 0024700372 scopus 로고
    • Order review/release: Research issues and perspectives
    • Melnyk, S. and Ragatz, G., 1989. Order review/release: research issues and perspectives. International Journal of Production Research, 27(7), 1081-1096.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1081-1096
    • Melnyk, S.1    Ragatz, G.2
  • 24
    • 0000809619 scopus 로고
    • Load smoothing by the planning and order review/release systems: A simulation experiment
    • Melnyk, S., Ragatz, G., and Fredendall, L., 1991. Load smoothing by the planning and order review/release systems: a simulation experiment. Journal of Operations Management, 10(4), 512-523.
    • (1991) Journal of Operations Management , vol.10 , Issue.4 , pp. 512-523
    • Melnyk, S.1    Ragatz, G.2    Fredendall, L.3
  • 25
    • 0028436792 scopus 로고
    • Evaluating variance control, order review/release and dispatching: A regression analysis
    • Melnyk, S., et al., 1994. Evaluating variance control, order review/release and dispatching: a regression analysis. International Journal of Production Research, 32(5), 1045-1061.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1045-1061
    • Melnyk, S.1
  • 27
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoom, P., Russell, R., and Fry, T., 1991. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29(4), 739-753.
    • (1991) International Journal of Production Research , vol.29 , Issue.4 , pp. 739-753
    • Philipoom, P.1    Russell, R.2    Fry, T.3
  • 28
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P., Malhotra, M., and Jensen, J., 1993. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences, 24(6), 1109-1134.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1134
    • Philipoom, P.1    Malhotra, M.2    Jensen, J.3
  • 30
    • 84985757538 scopus 로고
    • An evaluation of order release mechanisms in a job-shop environment
    • Ragatz, G. and Mabert, V., 1988. An evaluation of order release mechanisms in a job-shop environment. Decision Sciences, 19(1), 167-189.
    • (1988) Decision Sciences , vol.19 , Issue.1 , pp. 167-189
    • Ragatz, G.1    Mabert, V.2
  • 31
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasech, R., 1990. Dynamic job shop scheduling: a survey of simulation research. Omega (Oxford), 18(1), 43-57.
    • (1990) Omega (Oxford) , vol.18 , Issue.1 , pp. 43-57
    • Ramasech, R.1
  • 32
    • 0034659575 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly jobshops - Part 1
    • DOI 10.1080/002075400188492
    • Reeja, M. and Rajendran, C., 2000a. Dispatching rules for scheduling in assembly jobshops - Part 1. International Journal of Production Research, 38(9), 2051-2066. (Pubitemid 35401861)
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2051-2066
    • Reeja, M.K.1    Rajendran, C.2
  • 33
    • 0034631282 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly jobshops - Part 2
    • DOI 10.1080/00207540050028133
    • Reeja, M. and Rajendran, C., 2000b. Dispatching rules for scheduling in assembly jobshops - Part 2. International Journal of Production Research, 38(10), 2349-2360. (Pubitemid 35401854)
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2349-2360
    • Reeja, M.K.1    Rajendran, C.2
  • 35
    • 0034371598 scopus 로고    scopus 로고
    • A load-based and due-date-oriented approach to order review/release in job shops
    • Sabuncuoglu, I. and Karapinar, H., 2000. A load-based and due-date-oriented approach to order review/release in job shops. Decision Sciences, 31(2), 413-447.
    • (2000) Decision Sciences , vol.31 , Issue.2 , pp. 413-447
    • Sabuncuoglu, I.1    Karapinar, H.2
  • 36
    • 0011727186 scopus 로고
    • Priority dispatching rules in job shops with assembly operations and random delays
    • Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8(2), 227-234.
    • (1980) Omega , vol.8 , Issue.2 , pp. 227-234
    • Sculli, D.1
  • 40
    • 0031332607 scopus 로고    scopus 로고
    • Integrating order release control with due-date assignment rules
    • Tsai, C., Chang, G., and Li, R., 1997. Integrating order release control with due-date assignment rules. International Journal of Production Research, 35(12), 3379-3392.
    • (1997) International Journal of Production Research , vol.35 , Issue.12 , pp. 3379-3392
    • Tsai, C.1    Chang, G.2    Li, R.3
  • 42
    • 57049118551 scopus 로고    scopus 로고
    • Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times
    • Vinod, V. and Sridharan, R., 2009. Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times. International Journal of Production Research, 47(6), 1425-1447.
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1425-1447
    • Vinod, V.1    Sridharan, R.2
  • 43
    • 0026884810 scopus 로고
    • A broader view of the job-shop scheduling problem
    • Wein, L. and Chevalier, P., 1992. A broader view of the job-shop scheduling problem. Management Science, 38(7), 1018-1033.
    • (1992) Management Science , vol.38 , Issue.7 , pp. 1018-1033
    • Wein, L.1    Chevalier, P.2
  • 44
    • 70449637498 scopus 로고    scopus 로고
    • Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems
    • Zhou, R., Nee, A. Y. C., and Lee, H. P., 2009. Performance of an ant colony optimisation algorithm in dynamic job shop scheduling problems. International Journal of Production Research, 47(11), 2903-2920.
    • (2009) International Journal of Production Research , vol.47 , Issue.11 , pp. 2903-2920
    • Zhou, R.1    Nee, A.Y.C.2    Lee, H.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.