Volumn 51, Issue 3, 2013, Pages 780-797

Flow shop rescheduling under different types of disruption

Author keywords

flow shop scheduling; rescheduling; stability; uncertainty

Indexed keywords

FLOW SHOP RESCHEDULING; FLOW-SHOP SCHEDULING; FLOW-SHOPS; MANUFACTURING FACILITY; PRODUCTION COST; PRODUCTION OPERATIONS; PRODUCTION PLANNING AND SCHEDULING; RESCHEDULING; UNCERTAINTY;

EID: 84871191131     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.666856     Document Type: Article
Times cited : (118)

References (58)
  • 2
    • 84989688255 scopus 로고
    • Scheduling on a single-machine with a single breakdown to minimize stochastically the number of tardy jobs
    • Adiri, I., Frostig, E., and Kan, A.H.G.R., 1991. Scheduling on a single-machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics, 38 (2), 261-271.
    • (1991) Naval Research Logistics , vol.38 , Issue.2 , pp. 261-271
    • Adiri, I.1    Frostig, E.2    Kan, A.H.G.R.3
  • 5
    • 0030270129 scopus 로고    scopus 로고
    • Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
    • Allahverdi, A., 1996. Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers and Operations Research, 23 (10), 909-916.
    • (1996) Computers and Operations Research , vol.23 , Issue.10 , pp. 909-916
    • Allahverdi, A.1
  • 7
    • 13444291281 scopus 로고    scopus 로고
    • Maximization of solution flexibility for robust shop scheduling
    • DOI 10.1016/j.ejor.2004.04.004, PII S0377221704002425, Project Management and Scheduling
    • Artigues, C., Billaut, J.C., and Esswein, C., 2005. Maximization of solution flexibility for robust shop scheduling. European Journal Of Operational Research, 165 (2), 314-328. (Pubitemid 40206364)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 314-328
    • Artigues, C.1    Billaut, J.-C.2    Esswein, C.3
  • 8
    • 28144451536 scopus 로고    scopus 로고
    • Parallel-machine rescheduling with machine disruptions
    • DOI 10.1080/07408170500288133, PII U254372292418707
    • Azizoglu, M. and Alagoz, O., 2005. Parallel-machine rescheduling with machine disruptions. IIE Transactions, 37 (12), 1113-1118. (Pubitemid 41694331)
    • (2005) IIE Transactions (Institute of Industrial Engineers) , vol.37 , Issue.12 , pp. 1113-1118
    • Azizoglu, M.1    Alagoz, O.2
  • 9
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean, J.C., et al., 1991. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research, 39 (3), 470-483.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1
  • 10
    • 46649113169 scopus 로고    scopus 로고
    • An online approach to dynamic rescheduling for production planning applications
    • Caricato, P. and Grieco, A., 2008. An online approach to dynamic rescheduling for production planning applications. International Journal of Production Research, 46 (16), 4597-4617.
    • (2008) International Journal of Production Research , vol.46 , Issue.16 , pp. 4597-4617
    • Caricato, P.1    Grieco, A.2
  • 12
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • DOI 10.1016/S0377-2217(01)00355-1, PII S0377221701003551
    • Cowling, P. and Johansson, M., 2002. Using real time information for effective dynamic scheduling. European Journal of Operational Research, 139 (2), 230-244. (Pubitemid 34201236)
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.1    Johansson, M.2
  • 13
    • 27844590729 scopus 로고    scopus 로고
    • Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives
    • DOI 10.1080/00207540500103953
    • Curry, J. and Peters, B., 2005. Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives. International Journal of Production Research, 43 (15), 3231-3246. (Pubitemid 41657434)
    • (2005) International Journal of Production Research , vol.43 , Issue.15 , pp. 3231-3246
    • Curry, J.1    Peters, B.2
  • 15
    • 0040761043 scopus 로고
    • 2nd ed. New York: The Engineering Magazine Co
    • Gantt, H.L., 1919. Work, wages, and profits. 2nd ed. New York: The Engineering Magazine Co.
    • (1919) Work, Wages, and Profits
    • Gantt, H.L.1
  • 16
    • 76649144494 scopus 로고    scopus 로고
    • Analysis of robustness in proactive scheduling: A graphical approach
    • Ghezail, F., Pierreval, H., and Hajri-Gabouj, S., 2010. Analysis of robustness in proactive scheduling: a graphical approach. Computers & Industrial Engineering, 58 (2), 193-198.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.2 , pp. 193-198
    • Ghezail, F.1    Pierreval, H.2    Hajri-Gabouj, S.3
  • 17
    • 36148970840 scopus 로고    scopus 로고
    • Robustness and stability measures for scheduling: Single-machine environment
    • DOI 10.1080/07408170701283198, PII 783888111
    • Goren, S. and Sabuncuoglu, I., 2008. Robustness and stability measures for scheduling: single-machine environment. IIE Transactions, 40 (1), 66-83. (Pubitemid 350110976)
    • (2008) IIE Transactions (Institute of Industrial Engineers) , vol.40 , Issue.1 , pp. 66-83
    • Goren, S.1    Sabuncuoglu, I.2
  • 19
    • 19744366708 scopus 로고    scopus 로고
    • Rescheduling for new orders
    • Hall, N.G. and Potts, C.N., 2004. Rescheduling for new orders. Operations Research, 52 (3), 440-453.
    • (2004) Operations Research , vol.52 , Issue.3 , pp. 440-453
    • Hall, N.G.1    Potts, C.N.2
  • 20
    • 0041656170 scopus 로고
    • A classification of static scheduling problems
    • P.M. Pardalos, ed Singapore: World Scientific
    • Herrmann, J.V., Lee, C., and Snowdown, J.L., 1993. A classification of static scheduling problems. In: P.M. Pardalos, ed. Complexity in numerical optimization. Singapore: World Scientific, 203-253.
    • (1993) Complexity in Numerical Optimization , pp. 203-253
    • Herrmann, J.V.1    Lee, C.2    Snowdown, J.L.3
  • 21
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
    • Herroelen, W. and Leus, R., 2005. Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165 (2), 289-306. (Pubitemid 40206362)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 23
    • 70449642709 scopus 로고    scopus 로고
    • Issues and opportunities regarding replanning and rescheduling frequencies
    • Hozak, K. and Hill, J., 2009. Issues and opportunities regarding replanning and rescheduling frequencies. International Journal of Production Research, 47 (18), 4955-4970.
    • (2009) International Journal of Production Research , vol.47 , Issue.18 , pp. 4955-4970
    • Hozak, K.1    Hill, J.2
  • 24
    • 70449579437 scopus 로고    scopus 로고
    • Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems
    • Huatuco, L.H., et al., 2009. Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems. International Journal of Production Research, 47 (15), 4305-4325.
    • (2009) International Journal of Production Research , vol.47 , Issue.15 , pp. 4305-4325
    • Huatuco, L.H.1
  • 25
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • Jensen, M.T., 2003. Generating robust and flexible job shop schedules using genetic algorithms. IEEE Transactions on Evolutionary Computation, 7 (3), 275-288.
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 26
    • 0000245170 scopus 로고
    • The theory-practice gap in job-shop scheduling
    • King, J.R., 1976. The theory-practice gap in job-shop scheduling. Production Engineer, 55 (3), 137-143.
    • (1976) Production Engineer , vol.55 , Issue.3 , pp. 137-143
    • King, J.R.1
  • 27
    • 57249089354 scopus 로고    scopus 로고
    • Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice
    • Kopanos, G.M., et al., 2008. Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Industrial and Engineering Chemistry Research, 47 (22), 8785-8795.
    • (2008) Industrial and Engineering Chemistry Research , vol.47 , Issue.22 , pp. 8785-8795
    • Kopanos, G.M.1
  • 28
    • 30344452286 scopus 로고    scopus 로고
    • Two machine scheduling under disruptions with transportation considerations
    • DOI 10.1007/s10951-006-5592-7
    • Lee, C.Y., Leung, J.Y.T., and Yu, G., 2006. Two machine scheduling under disruptions with transportation considerations. Journal of Scheduling, 9 (1), 35-48. (Pubitemid 43063748)
    • (2006) Journal of Scheduling , vol.9 , Issue.1 , pp. 35-48
    • Lee, C.-Y.1    Leung, J.Y.-T.2    Yu, G.3
  • 29
    • 38849148294 scopus 로고    scopus 로고
    • Process scheduling under uncertainty: Review and challenges
    • DOI 10.1016/j.compchemeng.2007.03.001, PII S0098135407000580
    • Li, Z. and Ierapetritou, M., 2008. Process scheduling under uncertainty: review and challenges. Computers and Chemical Engineering, 32 (4/5), 715-727. (Pubitemid 351199674)
    • (2008) Computers and Chemical Engineering , vol.32 , Issue.4-5 , pp. 715-727
    • Li, Z.1    Ierapetritou, M.2
  • 30
    • 0345830728 scopus 로고    scopus 로고
    • Scheduling under machine breakdown in a continuous process industry
    • DOI 10.1016/S0305-0548(02)00224-1
    • Liao, C.J. and Chen, W.J., 2004. Scheduling under machine breakdown in a continuous process industry. Computers and Operations Research, 31 (3), 415-428. (Pubitemid 38092935)
    • (2004) Computers and Operations Research , vol.31 , Issue.3 , pp. 415-428
    • Liao, C.J.1    Chen, W.J.2
  • 34
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • DOI 10.1016/0305-0483(83)90088-9
    • Nawaz, M., Enscore, E.E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega-International Journal of Management Science, 11 (1), 91-95. (Pubitemid 13193807)
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 35
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan, R., Uzsoy, R., and Mckay, K.N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37 (18), 4217-4233. (Pubitemid 30519011)
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 36
    • 70449587009 scopus 로고    scopus 로고
    • Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
    • Ozlen, M. and Azizoglu, M., 2009. Generating all efficient solutions of a rescheduling problem on unrelated parallel machines. International Journal of Production Research, 47 (19), 5245-5270.
    • (2009) International Journal of Production Research , vol.47 , Issue.19 , pp. 5245-5270
    • Ozlen, M.1    Azizoglu, M.2
  • 37
    • 34447296449 scopus 로고    scopus 로고
    • Stability-oriented evaluation of rescheduling strategies, by using simulation
    • DOI 10.1016/j.compind.2007.05.009, PII S0166361507000681
    • Pfeiffer, A., Kadar, B., and Monostori, L., 2007. Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry, 58 (7), 630-643. (Pubitemid 47058181)
    • (2007) Computers in Industry , vol.58 , Issue.7 , pp. 630-643
    • Pfeiffer, A.1    Kadar, B.2    Monostori, L.3
  • 38
    • 34247614630 scopus 로고    scopus 로고
    • Robust simulation with a base environmental scenario
    • DOI 10.1016/j.ejor.2006.07.045, PII S0377221706008861
    • Pierreval, H. and Durieux-Paris, S., 2007. Robust simulation with a base environmental scenario. European Journal Of Operational Research, 182 (2), 783-793. (Pubitemid 46667209)
    • (2007) European Journal of Operational Research , vol.182 , Issue.2 , pp. 783-793
    • Pierreval, H.1    Durieux-Paris, S.2
  • 40
    • 62149141790 scopus 로고    scopus 로고
    • Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms
    • Purushothaman, D., Hirani, N.S., and Velez-Gallego, C.M., 2009. Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms. European Journal of Industrial Engineering, 3 (2), 187-206.
    • (2009) European Journal of Industrial Engineering , vol.3 , Issue.2 , pp. 187-206
    • Purushothaman, D.1    Hirani, N.S.2    Velez-Gallego, C.M.3
  • 41
    • 33744966565 scopus 로고    scopus 로고
    • Disruption management for machine scheduling: The case of SPT schedules
    • DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
    • Qi, X.T., Bard, J.F., and Yu, G., 2006. Disruption management for machine scheduling: the case of SPT schedules. International Journal of Production Economics, 103 (1), 166-184. (Pubitemid 43866474)
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 166-184
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 43
    • 33750841084 scopus 로고    scopus 로고
    • A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
    • DOI 10.1016/j.ejor.2005.12.009, PII S0377221705008507
    • Ruiz, R. and Stützle, T., 2007. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal of Operational Research, 177 (3), 2033-2049. (Pubitemid 44712036)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2033-2049
    • Ruiz, R.1    Stutzle, T.2
  • 44
    • 60749122333 scopus 로고    scopus 로고
    • Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
    • Sabuncuoglu, I. and Goren, S., 2009. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing, 22 (2), 138-157.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , Issue.2 , pp. 138-157
    • Sabuncuoglu, I.1    Goren, S.2
  • 46
    • 38949199814 scopus 로고
    • On a quantitative method in production planning and scheduling
    • Salveson, M.E., 1952. On a quantitative method in production planning and scheduling. Econometrica, 20 (4), 554-590.
    • (1952) Econometrica , vol.20 , Issue.4 , pp. 554-590
    • Salveson, M.E.1
  • 47
    • 79955418363 scopus 로고    scopus 로고
    • An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server
    • Samarghandi, H. and ElMekkawy, T.Y., 2011. An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server. European Journal of Industrial Engineering, 5 (2), 111-131.
    • (2011) European Journal of Industrial Engineering , vol.5 , Issue.2 , pp. 111-131
    • Samarghandi, H.1    Elmekkawy, T.Y.2
  • 48
    • 0016843112 scopus 로고
    • The nervous MRP system: How to do battle
    • Steele, D.C., 1975. The nervous MRP system: how to do battle. Production and Inventory Management, 16 (4), 83-89.
    • (1975) Production and Inventory Management , vol.16 , Issue.4 , pp. 83-89
    • Steele, D.C.1
  • 50
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • DOI 10.1016/0377-2217(90)90090-X
    • Taillard, E., 1990. Some efficient heuristic methods for the flow-shop sequencing problem. European Journal of Operational Research, 47 (1), 65-74. (Pubitemid 20733430)
    • (1990) European Journal of Operational Research , vol.47 , Issue.1 , pp. 65-74
    • Taillard, E.1
  • 51
    • 0027201278 scopus 로고
    • Benchmarks for basic scheduling problems
    • DOI 10.1016/0377-2217(93)90182-M
    • Taillard, E., 1993. Benchmarks for basic scheduling problems. European Journal of Operational Research, 64 (2), 278-285. (Pubitemid 23599340)
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 278-285
    • Taillard, E.1
  • 52
    • 77949457036 scopus 로고    scopus 로고
    • Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties
    • Valente, J.M.S. and Schaller, J.E., 2010. Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties. European Journal of Industrial Engineering, 4 (1), 99-129.
    • (2010) European Journal of Industrial Engineering , vol.4 , Issue.1 , pp. 99-129
    • Valente, J.M.S.1    Schaller, J.E.2
  • 53
    • 69749084638 scopus 로고    scopus 로고
    • Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem
    • Vallada, E. and Ruiz, R., 2010. Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem. Omega-International Journal of Management Science, 38 (1/2), 57-67.
    • (2010) Omega-International Journal of Management Science , vol.38 , Issue.1-2 , pp. 57-67
    • Vallada, E.1    Ruiz, R.2
  • 54
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machine systems
    • Vieira, G.E., Herrmann, J.W., and Lin, E., 2000. Predicting the performance of rescheduling strategies for parallel machine systems. Journal of Manufacturing Systems, 19 (4), 256-266.
    • (2000) Journal of Manufacturing Systems , vol.19 , Issue.4 , pp. 256-266
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 55
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • Vieira, G.E., Herrmann, J.W., and Lin, E., 2003. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling, 6 (1), 39-62.
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 57
    • 0036498099 scopus 로고    scopus 로고
    • On the robust single machine scheduling problem
    • DOI 10.1023/A:1013333232691
    • Yang, J. and Yu, G., 2002. On the robust single machine scheduling problem. Journal of Combinatorial Optimization, 6 (1), 17-33. (Pubitemid 34130061)
    • (2002) Journal of Combinatorial Optimization , vol.6 , Issue.1 , pp. 17-33
    • Yang, J.1    Yu, G.2
  • 58
    • 74549133998 scopus 로고    scopus 로고
    • An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
    • Zandieh, M. and Gholami, M., 2009. An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. International Journal of Production Research, 47 (24), 6999-7027.
    • (2009) International Journal of Production Research , vol.47 , Issue.24 , pp. 6999-7027
    • Zandieh, M.1    Gholami, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.