-
1
-
-
0031189107
-
Rescheduling job shops under random disruptions
-
Abumaizar, R.J. and Svestka, J.A., 1997. Rescheduling job shops under random disruptions. International Journal of Production Research, 35 (7), 2065-2082. (Pubitemid 127549712)
-
(1997)
International Journal of Production Research
, vol.35
, Issue.7
, pp. 2065-2082
-
-
Abumaizar, R.J.1
Svestka, J.A.2
-
2
-
-
84989688255
-
Scheduling on a single-machine with a single breakdown to minimize stochastically the number of tardy jobs
-
Adiri, I., Frostig, E., and Kan, A.H.G.R., 1991. Scheduling on a single-machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics, 38 (2), 261-271.
-
(1991)
Naval Research Logistics
, vol.38
, Issue.2
, pp. 261-271
-
-
Adiri, I.1
Frostig, E.2
Kan, A.H.G.R.3
-
3
-
-
0032710315
-
Match-up scheduling under a machine breakdown
-
Akturk, M.S. and Gorgulu, E., 1999. Match-up scheduling under a machine breakdown. European Journal of Operational Research, 112 (1), 81-97.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 81-97
-
-
Akturk, M.S.1
Gorgulu, E.2
-
4
-
-
77949463551
-
Performance analysis of flowshop scheduling using genetic algorithm enhanced with simulation
-
Al Kattan, I. and Maragoud, R., 2008. Performance analysis of flowshop scheduling using genetic algorithm enhanced with simulation. International Journal of Industrial Engineering-Theory, Applications and Practice, 15 (1), 62-72.
-
(2008)
International Journal of Industrial Engineering-Theory, Applications and Practice
, vol.15
, Issue.1
, pp. 62-72
-
-
Al Kattan, I.1
Maragoud, R.2
-
5
-
-
0030270129
-
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
-
Allahverdi, A., 1996. Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers and Operations Research, 23 (10), 909-916.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.10
, pp. 909-916
-
-
Allahverdi, A.1
-
6
-
-
84857291509
-
Rescheduling of unrelated parallel machines under machine breakdowns
-
Arnaut, J.P. and Rabadi, G., 2008. Rescheduling of unrelated parallel machines under machine breakdowns. International Journal of Applied Management Science, 1 (1), 75-89.
-
(2008)
International Journal of Applied Management Science
, vol.1
, Issue.1
, pp. 75-89
-
-
Arnaut, J.P.1
Rabadi, G.2
-
7
-
-
13444291281
-
Maximization of solution flexibility for robust shop scheduling
-
DOI 10.1016/j.ejor.2004.04.004, PII S0377221704002425, Project Management and Scheduling
-
Artigues, C., Billaut, J.C., and Esswein, C., 2005. Maximization of solution flexibility for robust shop scheduling. European Journal Of Operational Research, 165 (2), 314-328. (Pubitemid 40206364)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 314-328
-
-
Artigues, C.1
Billaut, J.-C.2
Esswein, C.3
-
8
-
-
28144451536
-
Parallel-machine rescheduling with machine disruptions
-
DOI 10.1080/07408170500288133, PII U254372292418707
-
Azizoglu, M. and Alagoz, O., 2005. Parallel-machine rescheduling with machine disruptions. IIE Transactions, 37 (12), 1113-1118. (Pubitemid 41694331)
-
(2005)
IIE Transactions (Institute of Industrial Engineers)
, vol.37
, Issue.12
, pp. 1113-1118
-
-
Azizoglu, M.1
Alagoz, O.2
-
9
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
Bean, J.C., et al., 1991. Matchup scheduling with multiple resources, release dates and disruptions. Operations Research, 39 (3), 470-483.
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 470-483
-
-
Bean, J.C.1
-
10
-
-
46649113169
-
An online approach to dynamic rescheduling for production planning applications
-
Caricato, P. and Grieco, A., 2008. An online approach to dynamic rescheduling for production planning applications. International Journal of Production Research, 46 (16), 4597-4617.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.16
, pp. 4597-4617
-
-
Caricato, P.1
Grieco, A.2
-
11
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Church, L.K. and Uzsoy, R., 1992. Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5 (3), 153-163.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, Issue.3
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
12
-
-
0036604832
-
Using real time information for effective dynamic scheduling
-
DOI 10.1016/S0377-2217(01)00355-1, PII S0377221701003551
-
Cowling, P. and Johansson, M., 2002. Using real time information for effective dynamic scheduling. European Journal of Operational Research, 139 (2), 230-244. (Pubitemid 34201236)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 230-244
-
-
Cowling, P.1
Johansson, M.2
-
13
-
-
27844590729
-
Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives
-
DOI 10.1080/00207540500103953
-
Curry, J. and Peters, B., 2005. Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives. International Journal of Production Research, 43 (15), 3231-3246. (Pubitemid 41657434)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.15
, pp. 3231-3246
-
-
Curry, J.1
Peters, B.2
-
15
-
-
0040761043
-
-
2nd ed. New York: The Engineering Magazine Co
-
Gantt, H.L., 1919. Work, wages, and profits. 2nd ed. New York: The Engineering Magazine Co.
-
(1919)
Work, Wages, and Profits
-
-
Gantt, H.L.1
-
16
-
-
76649144494
-
Analysis of robustness in proactive scheduling: A graphical approach
-
Ghezail, F., Pierreval, H., and Hajri-Gabouj, S., 2010. Analysis of robustness in proactive scheduling: a graphical approach. Computers & Industrial Engineering, 58 (2), 193-198.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.2
, pp. 193-198
-
-
Ghezail, F.1
Pierreval, H.2
Hajri-Gabouj, S.3
-
17
-
-
36148970840
-
Robustness and stability measures for scheduling: Single-machine environment
-
DOI 10.1080/07408170701283198, PII 783888111
-
Goren, S. and Sabuncuoglu, I., 2008. Robustness and stability measures for scheduling: single-machine environment. IIE Transactions, 40 (1), 66-83. (Pubitemid 350110976)
-
(2008)
IIE Transactions (Institute of Industrial Engineers)
, vol.40
, Issue.1
, pp. 66-83
-
-
Goren, S.1
Sabuncuoglu, I.2
-
19
-
-
19744366708
-
Rescheduling for new orders
-
Hall, N.G. and Potts, C.N., 2004. Rescheduling for new orders. Operations Research, 52 (3), 440-453.
-
(2004)
Operations Research
, vol.52
, Issue.3
, pp. 440-453
-
-
Hall, N.G.1
Potts, C.N.2
-
20
-
-
0041656170
-
A classification of static scheduling problems
-
P.M. Pardalos, ed Singapore: World Scientific
-
Herrmann, J.V., Lee, C., and Snowdown, J.L., 1993. A classification of static scheduling problems. In: P.M. Pardalos, ed. Complexity in numerical optimization. Singapore: World Scientific, 203-253.
-
(1993)
Complexity in Numerical Optimization
, pp. 203-253
-
-
Herrmann, J.V.1
Lee, C.2
Snowdown, J.L.3
-
21
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
-
Herroelen, W. and Leus, R., 2005. Project scheduling under uncertainty: survey and research potentials. European Journal of Operational Research, 165 (2), 289-306. (Pubitemid 40206362)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
23
-
-
70449642709
-
Issues and opportunities regarding replanning and rescheduling frequencies
-
Hozak, K. and Hill, J., 2009. Issues and opportunities regarding replanning and rescheduling frequencies. International Journal of Production Research, 47 (18), 4955-4970.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.18
, pp. 4955-4970
-
-
Hozak, K.1
Hill, J.2
-
24
-
-
70449579437
-
Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems
-
Huatuco, L.H., et al., 2009. Comparing the impact of different rescheduling strategies on the entropic-related complexity of manufacturing systems. International Journal of Production Research, 47 (15), 4305-4325.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.15
, pp. 4305-4325
-
-
Huatuco, L.H.1
-
25
-
-
0038479948
-
Generating robust and flexible job shop schedules using genetic algorithms
-
Jensen, M.T., 2003. Generating robust and flexible job shop schedules using genetic algorithms. IEEE Transactions on Evolutionary Computation, 7 (3), 275-288.
-
(2003)
IEEE Transactions on Evolutionary Computation
, vol.7
, Issue.3
, pp. 275-288
-
-
Jensen, M.T.1
-
26
-
-
0000245170
-
The theory-practice gap in job-shop scheduling
-
King, J.R., 1976. The theory-practice gap in job-shop scheduling. Production Engineer, 55 (3), 137-143.
-
(1976)
Production Engineer
, vol.55
, Issue.3
, pp. 137-143
-
-
King, J.R.1
-
27
-
-
57249089354
-
Costs for rescheduling actions: A critical issue for reducing the gap between scheduling theory and practice
-
Kopanos, G.M., et al., 2008. Costs for rescheduling actions: a critical issue for reducing the gap between scheduling theory and practice. Industrial and Engineering Chemistry Research, 47 (22), 8785-8795.
-
(2008)
Industrial and Engineering Chemistry Research
, vol.47
, Issue.22
, pp. 8785-8795
-
-
Kopanos, G.M.1
-
28
-
-
30344452286
-
Two machine scheduling under disruptions with transportation considerations
-
DOI 10.1007/s10951-006-5592-7
-
Lee, C.Y., Leung, J.Y.T., and Yu, G., 2006. Two machine scheduling under disruptions with transportation considerations. Journal of Scheduling, 9 (1), 35-48. (Pubitemid 43063748)
-
(2006)
Journal of Scheduling
, vol.9
, Issue.1
, pp. 35-48
-
-
Lee, C.-Y.1
Leung, J.Y.-T.2
Yu, G.3
-
29
-
-
38849148294
-
Process scheduling under uncertainty: Review and challenges
-
DOI 10.1016/j.compchemeng.2007.03.001, PII S0098135407000580
-
Li, Z. and Ierapetritou, M., 2008. Process scheduling under uncertainty: review and challenges. Computers and Chemical Engineering, 32 (4/5), 715-727. (Pubitemid 351199674)
-
(2008)
Computers and Chemical Engineering
, vol.32
, Issue.4-5
, pp. 715-727
-
-
Li, Z.1
Ierapetritou, M.2
-
30
-
-
0345830728
-
Scheduling under machine breakdown in a continuous process industry
-
DOI 10.1016/S0305-0548(02)00224-1
-
Liao, C.J. and Chen, W.J., 2004. Scheduling under machine breakdown in a continuous process industry. Computers and Operations Research, 31 (3), 415-428. (Pubitemid 38092935)
-
(2004)
Computers and Operations Research
, vol.31
, Issue.3
, pp. 415-428
-
-
Liao, C.J.1
Chen, W.J.2
-
31
-
-
0002054180
-
Predictable scheduling of a single machine subject to breakdowns
-
Mehta, S.V. and Uzsoy, R., 1999. Predictable scheduling of a single machine subject to breakdowns. International Journal of Computer Integrated Manufacturing, 12 (1), 15-38. (Pubitemid 129607547)
-
(1999)
International Journal of Computer Integrated Manufacturing
, vol.12
, Issue.1
, pp. 15-38
-
-
Mehta, S.V.1
Uzsoy, R.2
-
33
-
-
84952253486
-
Job shop scheduling heuristics and frequency of scheduling
-
Muhlemann, A.P., Lockett, A.G., and Farns, C.K., 1982. Job shop scheduling heuristics and frequency of scheduling. International Journal of Production Research, 20 (2), 227-241.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.2
, pp. 227-241
-
-
Muhlemann, A.P.1
Lockett, A.G.2
Farns, C.K.3
-
34
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
Nawaz, M., Enscore, E.E., and Ham, I., 1983. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem. Omega-International Journal of Management Science, 11 (1), 91-95. (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
35
-
-
0033343706
-
Predictable scheduling of a single machine with breakdowns and sensitive jobs
-
O'Donovan, R., Uzsoy, R., and Mckay, K.N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37 (18), 4217-4233. (Pubitemid 30519011)
-
(1999)
International Journal of Production Research
, vol.37
, Issue.18
, pp. 4217-4233
-
-
O'Donovan, R.1
Uzsoy, R.2
McKay, K.N.3
-
36
-
-
70449587009
-
Generating all efficient solutions of a rescheduling problem on unrelated parallel machines
-
Ozlen, M. and Azizoglu, M., 2009. Generating all efficient solutions of a rescheduling problem on unrelated parallel machines. International Journal of Production Research, 47 (19), 5245-5270.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.19
, pp. 5245-5270
-
-
Ozlen, M.1
Azizoglu, M.2
-
37
-
-
34447296449
-
Stability-oriented evaluation of rescheduling strategies, by using simulation
-
DOI 10.1016/j.compind.2007.05.009, PII S0166361507000681
-
Pfeiffer, A., Kadar, B., and Monostori, L., 2007. Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry, 58 (7), 630-643. (Pubitemid 47058181)
-
(2007)
Computers in Industry
, vol.58
, Issue.7
, pp. 630-643
-
-
Pfeiffer, A.1
Kadar, B.2
Monostori, L.3
-
38
-
-
34247614630
-
Robust simulation with a base environmental scenario
-
DOI 10.1016/j.ejor.2006.07.045, PII S0377221706008861
-
Pierreval, H. and Durieux-Paris, S., 2007. Robust simulation with a base environmental scenario. European Journal Of Operational Research, 182 (2), 783-793. (Pubitemid 46667209)
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.2
, pp. 783-793
-
-
Pierreval, H.1
Durieux-Paris, S.2
-
40
-
-
62149141790
-
Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms
-
Purushothaman, D., Hirani, N.S., and Velez-Gallego, C.M., 2009. Scheduling identical parallel batch processing machines to minimise makespan using genetic algorithms. European Journal of Industrial Engineering, 3 (2), 187-206.
-
(2009)
European Journal of Industrial Engineering
, vol.3
, Issue.2
, pp. 187-206
-
-
Purushothaman, D.1
Hirani, N.S.2
Velez-Gallego, C.M.3
-
41
-
-
33744966565
-
Disruption management for machine scheduling: The case of SPT schedules
-
DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
-
Qi, X.T., Bard, J.F., and Yu, G., 2006. Disruption management for machine scheduling: the case of SPT schedules. International Journal of Production Economics, 103 (1), 166-184. (Pubitemid 43866474)
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.1
, pp. 166-184
-
-
Qi, X.1
Bard, J.F.2
Yu, G.3
-
42
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell, W.G., and Kurz, M.B., 2004. Dynamic rescheduling that simultaneously considers efficiency and stability. Computers and Industrial Engineering, 46 (1), 1-15.
-
(2004)
Computers and Industrial Engineering
, vol.46
, Issue.1
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell, W.G.2
Kurz, M.B.3
-
43
-
-
33750841084
-
A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
-
DOI 10.1016/j.ejor.2005.12.009, PII S0377221705008507
-
Ruiz, R. and Stützle, T., 2007. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal of Operational Research, 177 (3), 2033-2049. (Pubitemid 44712036)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2033-2049
-
-
Ruiz, R.1
Stutzle, T.2
-
44
-
-
60749122333
-
Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
-
Sabuncuoglu, I. and Goren, S., 2009. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing, 22 (2), 138-157.
-
(2009)
International Journal of Computer Integrated Manufacturing
, vol.22
, Issue.2
, pp. 138-157
-
-
Sabuncuoglu, I.1
Goren, S.2
-
45
-
-
0242485199
-
Reactive scheduling in a dynamic and stochastic FMS environment
-
Sabuncuoglu, I. and Kizilisik, O.B., 2003. Reactive scheduling in a dynamic and stochastic FMS environment. International Journal of Production Research, 41 (17), 4211-4231.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.17
, pp. 4211-4231
-
-
Sabuncuoglu, I.1
Kizilisik, O.B.2
-
46
-
-
38949199814
-
On a quantitative method in production planning and scheduling
-
Salveson, M.E., 1952. On a quantitative method in production planning and scheduling. Econometrica, 20 (4), 554-590.
-
(1952)
Econometrica
, vol.20
, Issue.4
, pp. 554-590
-
-
Salveson, M.E.1
-
47
-
-
79955418363
-
An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server
-
Samarghandi, H. and ElMekkawy, T.Y., 2011. An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server. European Journal of Industrial Engineering, 5 (2), 111-131.
-
(2011)
European Journal of Industrial Engineering
, vol.5
, Issue.2
, pp. 111-131
-
-
Samarghandi, H.1
Elmekkawy, T.Y.2
-
48
-
-
0016843112
-
The nervous MRP system: How to do battle
-
Steele, D.C., 1975. The nervous MRP system: how to do battle. Production and Inventory Management, 16 (4), 83-89.
-
(1975)
Production and Inventory Management
, vol.16
, Issue.4
, pp. 83-89
-
-
Steele, D.C.1
-
49
-
-
27844533529
-
Reactive repair tool for job shop schedules
-
DOI 10.1080/0020754042000270412
-
Subramaniam, V., Raheja, A.S., and Reddy, K.R.B., 2005. Reactive repair tool for job shop schedules. International Journal of Production Research, 43 (1), 1-23. (Pubitemid 41646826)
-
(2005)
International Journal of Production Research
, vol.43
, Issue.1
, pp. 1-23
-
-
Subramaniam, V.1
Raheja, A.S.2
Rama Bhupal Reddy, K.3
-
50
-
-
0025700701
-
Some efficient heuristic methods for the flow shop sequencing problem
-
DOI 10.1016/0377-2217(90)90090-X
-
Taillard, E., 1990. Some efficient heuristic methods for the flow-shop sequencing problem. European Journal of Operational Research, 47 (1), 65-74. (Pubitemid 20733430)
-
(1990)
European Journal of Operational Research
, vol.47
, Issue.1
, pp. 65-74
-
-
Taillard, E.1
-
51
-
-
0027201278
-
Benchmarks for basic scheduling problems
-
DOI 10.1016/0377-2217(93)90182-M
-
Taillard, E., 1993. Benchmarks for basic scheduling problems. European Journal of Operational Research, 64 (2), 278-285. (Pubitemid 23599340)
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 278-285
-
-
Taillard, E.1
-
52
-
-
77949457036
-
Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties
-
Valente, J.M.S. and Schaller, J.E., 2010. Improved heuristics for the single machine scheduling problem with linear early and quadratic tardy penalties. European Journal of Industrial Engineering, 4 (1), 99-129.
-
(2010)
European Journal of Industrial Engineering
, vol.4
, Issue.1
, pp. 99-129
-
-
Valente, J.M.S.1
Schaller, J.E.2
-
53
-
-
69749084638
-
Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem
-
Vallada, E. and Ruiz, R., 2010. Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem. Omega-International Journal of Management Science, 38 (1/2), 57-67.
-
(2010)
Omega-International Journal of Management Science
, vol.38
, Issue.1-2
, pp. 57-67
-
-
Vallada, E.1
Ruiz, R.2
-
54
-
-
0040518040
-
Predicting the performance of rescheduling strategies for parallel machine systems
-
Vieira, G.E., Herrmann, J.W., and Lin, E., 2000. Predicting the performance of rescheduling strategies for parallel machine systems. Journal of Manufacturing Systems, 19 (4), 256-266.
-
(2000)
Journal of Manufacturing Systems
, vol.19
, Issue.4
, pp. 256-266
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
55
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
-
Vieira, G.E., Herrmann, J.W., and Lin, E., 2003. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. Journal of Scheduling, 6 (1), 39-62.
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
57
-
-
0036498099
-
On the robust single machine scheduling problem
-
DOI 10.1023/A:1013333232691
-
Yang, J. and Yu, G., 2002. On the robust single machine scheduling problem. Journal of Combinatorial Optimization, 6 (1), 17-33. (Pubitemid 34130061)
-
(2002)
Journal of Combinatorial Optimization
, vol.6
, Issue.1
, pp. 17-33
-
-
Yang, J.1
Yu, G.2
-
58
-
-
74549133998
-
An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
-
Zandieh, M. and Gholami, M., 2009. An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns. International Journal of Production Research, 47 (24), 6999-7027.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.24
, pp. 6999-7027
-
-
Zandieh, M.1
Gholami, M.2
|