-
1
-
-
0025462988
-
Analysis of material flow in a job shop with assembly operations
-
Cheng T.C.E. Analysis of material flow in a job shop with assembly operations. International Journal of Production Research. 28(7):1990;1369-1383.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.7
, pp. 1369-1383
-
-
Cheng, T.C.E.1
-
2
-
-
0032628881
-
Scheduling the fabrication and assembly of components in a two-machine flowshop
-
Cheng T.C.E., Wang G. Scheduling the fabrication and assembly of components in a two-machine flowshop. IIE Transactions. 31:1999;135-143.
-
(1999)
IIE Transactions
, vol.31
, pp. 135-143
-
-
Cheng, T.C.E.1
Wang, G.2
-
6
-
-
0024641735
-
The effect of product structure and sequencing rule on assembly shop performance
-
Fry T.D., Olife M.D., Minor E.D., Keong Leong G. The effect of product structure and sequencing rule on assembly shop performance. International Journal of Production Research. 27(4):1989;671-686.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 671-686
-
-
Fry, T.D.1
Olife, M.D.2
Minor, E.D.3
Keong Leong, G.4
-
8
-
-
0031351397
-
A branch and bound algorithm for the two-stage assembly scheduling problem
-
Hariri A.M.A., Potts C.N. A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research. 103(3):1997;547-556.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.3
, pp. 547-556
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
9
-
-
0021424669
-
A comparative study of priority dispatching rules in a hybrid assembly/job shop
-
Huang P.Y. A comparative study of priority dispatching rules in a hybrid assembly/job shop. International Journal of Production Research. 22(3):1984;375-387.
-
(1984)
International Journal of Production Research
, vol.22
, Issue.3
, pp. 375-387
-
-
Huang, P.Y.1
-
10
-
-
0027590319
-
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
-
Lee C.Y., Cheng T.C.E., Lin B.M.T. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science. 39(5):1993;616-625.
-
(1993)
Management Science
, vol.39
, Issue.5
, pp. 616-625
-
-
Lee, C.Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
11
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoon P.R., Russell R.S., Fry T.D. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research. 29(4):1991;739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoon, P.R.1
Russell, R.S.2
Fry, T.D.3
-
12
-
-
0000655488
-
The two-stage assembly scheduling problem: Complexity and approximation
-
Potts C.N., Sevast'Janov S.V., Strusevich V.A., Van Wassenhove L.N., Zwaneveld C.M. The two-stage assembly scheduling problem: Complexity and approximation. Operations Research. 43(2):1995;346-355.
-
(1995)
Operations Research
, vol.43
, Issue.2
, pp. 346-355
-
-
Potts, C.N.1
Sevast'janov, S.V.2
Strusevich, V.A.3
Van Wassenhove, L.N.4
Zwaneveld, C.M.5
-
14
-
-
7444270127
-
Flow shops with non-identical multiple processors: A study on makespans
-
ISBN 0-9654599-5-0, Paper Number 403, Hsinchu, Taiwan, December
-
I. Roa, D. Santos, Flow shops with non-identical multiple processors: A study on makespans, in: Proceedings of the 5th Annual International Conference on Industrial Engineering - Theories, Applications, and Practice, ISBN 0-9654599-5-0, Paper Number 403, Hsinchu, Taiwan, December 2000.
-
(2000)
Proceedings of the 5th Annual International Conference on Industrial Engineering - Theories, Applications, and Practice
-
-
Roa, I.1
Santos, D.2
-
15
-
-
0035929101
-
Hybrid flow-shop scheduling with assembly operations
-
Yokoyama M. Hybrid flow-shop scheduling with assembly operations. International Journal of Production Economics. 73(2):2001;103-116.
-
(2001)
International Journal of Production Economics
, vol.73
, Issue.2
, pp. 103-116
-
-
Yokoyama, M.1
|