Efficient methods for scheduling make-to-order assemblies under resource, assembly area and part availability constraints

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; CONSTRAINT THEORY; HEURISTIC METHODS; OPTIMIZATION; PROBLEM SOLVING; RESOURCE ALLOCATION; SET THEORY;

EID: 0034627935     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/002075400189653     Document Type: Article
Times cited : (34)

References (45)
  • 3
    • 0031147439 scopus 로고    scopus 로고
    • Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
    • Anwar, M.G. and Nagi, R., 1997, Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups. International Journal of Production Research, 35, 1447-1470.
    • (1997) International Journal of Production Research , vol.35 , pp. 1447-1470
    • Anwar, M.G.1    Nagi, R.2
  • 4
    • 0003131416 scopus 로고    scopus 로고
    • Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
    • edited by S. Voss, S. Martello, J. Osmah and C. Roucairol (Dordrecht: Kluwer)
    • Baar, T., Brucker, P. and Knust, S., 1998, Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem. In Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization, edited by S. Voss, S. Martello, J. Osmah and C. Roucairol (Dordrecht: Kluwer), pp. 1-8.
    • (1998) Meta-Heuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 1-8
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 7
    • 0027814043 scopus 로고
    • An evaluation of heuristics for allocating components to kits in small-lot, multi-echelon assembly systems
    • Chen, J.F. and Wilhelm, W.E., 1993, An evaluation of heuristics for allocating components to kits in small-lot, multi-echelon assembly systems. International Journal of Production Research, 31, 2835-2856.
    • (1993) International Journal of Production Research , vol.31 , pp. 2835-2856
    • Chen, J.F.1    Wilhelm, W.E.2
  • 8
    • 84989672523 scopus 로고
    • Optimizing the allocation of components to kits in small-lot, multi-echelon assembly systems
    • Chen, J.F. and Wilhelm, W.E., 1994, Optimizing the allocation of components to kits in small-lot, multi-echelon assembly systems. Naval Research Logistics, 41, 229-256.
    • (1994) Naval Research Logistics , vol.41 , pp. 229-256
    • Chen, J.F.1    Wilhelm, W.E.2
  • 9
    • 0000655780 scopus 로고
    • Generalized pairwise interchanges and machine scheduling
    • Della Croce, F., 1995, Generalized pairwise interchanges and machine scheduling. European Journal of Operational Research, 83, 310-319.
    • (1995) European Journal of Operational Research , vol.83 , pp. 310-319
    • Croce, F.D.1
  • 11
    • 0030407746 scopus 로고    scopus 로고
    • Assembly management in machine tool manufacturing and the PRISMA-Leitstand
    • Drexl, A. and Kolisch, R., 1996, Assembly management in machine tool manufacturing and the PRISMA-Leitstand. Production and Inventory Management Journal, 37, 55-57.
    • (1996) Production and Inventory Management Journal , vol.37 , pp. 55-57
    • Drexl, A.1    Kolisch, R.2
  • 13
    • 0023343801 scopus 로고
    • Scheduling tasks with due dates in a fabrication/assembly process
    • Faaland, B. and Schmitt, T., 1987, Scheduling tasks with due dates in a fabrication/assembly process. Operations Research, 35, 378-381.
    • (1987) Operations Research , vol.35 , pp. 378-381
    • Faaland, B.1    Schmitt, T.2
  • 14
    • 0027555787 scopus 로고
    • Cost-based scheduling of workers and equipment in a fabrication and assembly shop
    • Faaland, B. and Schmitt, T., 1993, Cost-based scheduling of workers and equipment in a fabrication and assembly shop. Operations Research, 41, 253-268.
    • (1993) Operations Research , vol.41 , pp. 253-268
    • Faaland, B.1    Schmitt, T.2
  • 16
    • 0029262526 scopus 로고
    • Facility-wide planning and scheduling of printed wiring board assembly
    • Feo, T.A., Bard, J.F. and Holland, S.D., 1995, Facility-wide planning and scheduling of printed wiring board assembly. Operations Research, 43, 219 230.
    • (1995) Operations Research , vol.43 , pp. 219-230
    • Feo, T.A.1    Bard, J.F.2    Holland, S.D.3
  • 20
    • 0031351397 scopus 로고    scopus 로고
    • A branch and bound algorithm for the two-stage assembly scheduling problem
    • Hariri, A.M.A. and Potts, C.N., 1997, A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research, 103, 547-556.
    • (1997) European Journal of Operational Research , vol.103 , pp. 547-556
    • Hariri, A.M.A.1    Potts, C.N.2
  • 21
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann, S., 1998, A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics, 45, 733-750.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 23
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R., 1996, Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation. European Journal of Operational Research, 90, 320-333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 24
    • 0011769064 scopus 로고    scopus 로고
    • Integrated scheduling, assembly area-, and part-assignment for large scale make-to-order assemblies
    • to be published
    • Kolisch, R., 1999, Integrated scheduling, assembly area-, and part-assignment for large scale make-to-order assemblies. International Journal of Production Economics, to be published.
    • (1999) International Journal of Production Economics
    • Kolisch, R.1
  • 25
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis
    • edited by J. Weglarz (Dordrecht: Kluwer)
    • Kolisch, R. and Hartmann, S., 1999, Heuristic algorithms for the resource-constrained project scheduling problem: Classification and computational analysis. In: Project Scheduling-Recent Models, Algorithms and Applications, edited by J. Weglarz (Dordrecht: Kluwer) pp. 147-178.
    • (1999) Project Scheduling-Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 26
    • 0011714830 scopus 로고    scopus 로고
    • Assembly scheduling in a make-to-order environment with shop floor constraints
    • edited by P. Kleinschmidt, A. Bachem, U. Derigs, D. Fischer, U. Leopold-Wildburger, and R.H. Möhring (Berlin: Springer)
    • Kolisch, R. and Rinne, A., 1996, Assembly scheduling in a make-to-order environment with shop floor constraints. Symposium on Operations Research, edited by P. Kleinschmidt, A. Bachem, U. Derigs, D. Fischer, U. Leopold-Wildburger, and R.H. Möhring (Berlin: Springer) pp. 376-381.
    • (1996) Symposium on Operations Research , pp. 376-381
    • Kolisch, R.1    Rinne, A.2
  • 27
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A. and Drexl, A., 1995, Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41, 1693-1703.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 28
    • 0029491419 scopus 로고
    • Evaluating backward scheduling and sequencing rules for an assembly shop environment
    • Lalsare, P. and Sen, S., 1995, Evaluating backward scheduling and sequencing rules for an assembly shop environment. Production and Inventory Management Journal, 36, 71-77.
    • (1995) Production and Inventory Management Journal , vol.36 , pp. 71-77
    • Lalsare, P.1    Sen, S.2
  • 29
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • Lee, C.-Y., Cheng, T.C.E. and Lin, B.M.T., 1993, Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science, 39, 616-625.
    • (1993) Management Science , vol.39 , pp. 616-625
    • Lee, C.-Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 31
    • 0001251144 scopus 로고
    • Job-shop scheduling: Computational study of local search and large-step optimization methods
    • Lourencco, H.R., 1995, Job-shop scheduling: computational study of local search and large-step optimization methods. European Journal of Operational Research, 83, 347-364.
    • (1995) European Journal of Operational Research , vol.83 , pp. 347-364
    • Lourencco, H.R.1
  • 32
    • 0001463650 scopus 로고
    • Large-step markov chains for TSP incorporating local search heuristics
    • Martin, O., Otto, S.W. and Felten, E.W., 1992, Large-step markov chains for TSP incorporating local search heuristics. Operations Research Letters, 11, 219-224.
    • (1992) Operations Research Letters , vol.11 , pp. 219-224
    • Martin, O.1    Otto, S.W.2    Felten, E.W.3
  • 34
    • 0000497721 scopus 로고    scopus 로고
    • Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
    • Neumann, K. and Schwindt, C., 1997, Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spektrum, 19, 205-217.
    • (1997) OR Spektrum , vol.19 , pp. 205-217
    • Neumann, K.1    Schwindt, C.2
  • 40
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., Watters, L.J. and Wolfe, P.M., 1969, Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16, 93-107.
    • (1969) Management Science , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 41
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russell, R.S. and Taylor, B.W. III, An evaluation of sequencing rules for an assembly shop. Decision Sciences, 16, 196-212, 1985.
    • (1985) Decision Sciences , vol.16 , pp. 196-212
    • Russell, R.S.1    Taylor B.W. III2
  • 43
    • 0011771295 scopus 로고
    • Flächenorientierte Terrain- und Kapazitätsplanung in der Anlagemnontage
    • Schlauch, R. and Ley, W., 1988, Flächenorientierte Terrain- und Kapazitätsplanung in der Anlagemnontage. Zeitschrift für wirtschaftliche Fertigung, 83, 223-227.
    • (1988) Zeitschrift für wirtschaftliche Fertigung , vol.83 , pp. 223-227
    • Schlauch, R.1    Ley, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.