-
1
-
-
84860796092
-
Material waste in the UAE construction industry: Main causes and minimization practices
-
Al-Hajj, A. and Hamani, K. (2011). "Material Waste in the UAE Construction Industry: Main Causes and Minimization Practices, " Architectural Engineering and Design Management, Vol. 7 No. 4, pp. 221-235.
-
(2011)
Architectural Engineering and Design Management
, vol.7
, Issue.4
, pp. 221-235
-
-
Al-Hajj, A.1
Hamani, K.2
-
2
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
ASCE
-
Bossink, B.A.G. and Brouwers, H.J.H. (1996). "Construction waste: quantification and source evaluation, " J. Constr. Eng. Manage., ASCE, Vol. 122 No. 1, pp. 55-60.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 55-60
-
-
Bossink, B.A.G.1
Brouwers, H.J.H.2
-
3
-
-
0026837054
-
Causes of quality deviations in design and construction
-
ASCE
-
Burati, J.L.J., Farrington, J.J. and Ledbetter, William B. (1992), "Causes of Quality Deviations in Design and Construction, " J. Constr. Eng. Manage., ASCE, Vol. 118 No. 1, pp. 34-49.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.J.1
Farrington, J.J.2
Ledbetter, W.B.3
-
4
-
-
84863079866
-
Waste elimination of mucking process of a petroleum storage tunnel through the value stream analysis
-
Manchester
-
Choi, S., Ku, T.H., Yeo, D.H. and Han, S.H. (2002). "Waste Elimination of Mucking Process of a Petroleum Storage Tunnel through the Value Stream Analysis, " Proceedings of the 10th Annual Conference of the IGLC, Manchester, pp. 155-167.
-
(2002)
Proceedings of the 10th Annual Conference of the IGLC
, pp. 155-167
-
-
Choi, S.1
Ku, T.H.2
Yeo, D.H.3
Han, S.H.4
-
5
-
-
0029735207
-
Materials control and waste on building sites
-
Enshassi, A. (1996), "Materials control and waste on building sites, " Building Research & Information, Vol. 24 No. 1, pp. 31-34.
-
(1996)
Building Research & Information
, vol.24
, Issue.1
, pp. 31-34
-
-
Enshassi, A.1
-
6
-
-
84993047549
-
Minimizing waste on construction project sites
-
MCB UP Ltd
-
Faniran, O.O. and Caban, G. (1993). "Minimizing waste on construction project sites, " Engineering, Construction and Architectural Management, MCB UP Ltd, Vol. 5 No. 2, pp. 182-188.
-
(1993)
Engineering, Construction and Architectural Management
, vol.5
, Issue.2
, pp. 182-188
-
-
Faniran, O.O.1
Caban, G.2
-
7
-
-
1842699306
-
Material waste in building industry: Main causes and prevention
-
M.ASCE, ASCE
-
Formoso, C.T., (M.ASCE), L.S., Cesare, C.D. and Isatto, E.L. (2002). "Material Waste in Building Industry: Main Causes and Prevention, " J. Constr. Eng. Manage., ASCE, Vol. 128 No. 4, pp. 316-325.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 316-325
-
-
Formoso, C.T.1
Cesare, C.D.2
Isatto, E.L.3
-
8
-
-
79960205634
-
Method for waste control in the building Industry
-
Berkeley
-
Formoso, C.T., Isatto, E.L. and Hirota, E.H. (1999). "Method for Waste Control in the Building Industry, " Proceedings of the 7th Annual Conference of the IGLC, Berkeley, pp. 325-334.
-
(1999)
Proceedings of the 7th Annual Conference of the IGLC
, pp. 325-334
-
-
Formoso, C.T.1
Isatto, E.L.2
Hirota, E.H.3
-
9
-
-
84866124892
-
Measurement of waste and productivity in relation to lean
-
Michigan
-
Forsberg, A. and Saukkoriipi, L. (2007). "Measurement of Waste and Productivity in Relation to Lean, " Proceedings of the 15th Annual Conference of the IGLC, Michigan, Vol. 46, pp. 67-76.
-
(2007)
Proceedings of the 15th Annual Conference of the IGLC
, vol.46
, pp. 67-76
-
-
Forsberg, A.1
Saukkoriipi, L.2
-
10
-
-
79960284972
-
Materials waste in the egyptian construction Industry
-
Singapore
-
Gara, G.L., Anis, A.R. and Gammal, A.E. (2001). "Materials Waste in the Egyptian Construction Industry, " Proceedings of the 9th Annual Conference of the IGLC, Singapore, pp. 1-8.
-
(2001)
Proceedings of the 9th Annual Conference of the IGLC
, pp. 1-8
-
-
Gara, G.L.1
Anis, A.R.2
Gammal, A.E.3
-
11
-
-
0028497885
-
Source evaluation of solid waste in building construction
-
Gavilan, R.M. and Bernold, L.E. (1994). "Source evaluation of solid waste in building construction, " J. Constr. Eng. Manage., Vol. 120 No. 3, pp. 536-552.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.3
, pp. 536-552
-
-
Gavilan, R.M.1
Bernold, L.E.2
-
12
-
-
84874493345
-
Identification and quantification of non-value adding effort due to errors and changes in design and construction projects
-
ASCE
-
Han, S., Lee, S. and Peña-Mora, F. (2011). "Identification and Quantification of Non-Value Adding Effort Due to Errors and Changes in Design and Construction Projects, " J. Constr. Eng. Manage., ASCE, Vol. 1 No. 1, p. 291.
-
(2011)
J. Constr. Eng. Manage.
, vol.1
, Issue.1
, pp. 291
-
-
Han, S.1
Lee, S.2
Peña-Mora, F.3
-
13
-
-
12344255065
-
Quantifying levels of wasted time in construction with meta-analysis
-
ASCE
-
Horman, M.J. and Kenley, R. (2005). "Quantifying Levels of Wasted Time in Construction with Meta-Analysis, " J. Constr. Eng. Manage., ASCE, Vol. 131 No. 1, pp. 52-61.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 52-61
-
-
Horman, M.J.1
Kenley, R.2
-
14
-
-
81855224814
-
New operating system for project management: Consequences and opportunities
-
ASCE
-
Howell, G. (2011), "New Operating System for Project Management: Consequences and Opportunities, " J. Constr. Eng. Manage., ASCE, Vol. 137 No. 10, pp. 882-886.
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.10
, pp. 882-886
-
-
Howell, G.1
-
15
-
-
60449091309
-
Measuring the impact of rework on construction cost performance
-
ASCE, doi:10.1061/(ASCE)0733-9364(2009)135:3(187
-
Hwang, B.-G., Thomas, S.R., Haas, C.T. and Caldas, C.H. (2009). "Measuring the Impact of Rework on Construction Cost Performance, " J. Constr. Eng. Manage., ASCE, Vol. 135 No. 3, pp. 187-198. doi:10.1061/(ASCE) 0733-9364(2009)135:3(187).
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.3
, pp. 187-198
-
-
Hwang, B.-G.1
Thomas, S.R.2
Haas, C.T.3
Caldas, C.H.4
-
19
-
-
84866115541
-
Waste and labor productivity in production planning
-
Haifa
-
Koskenvesa, A., Koskela, L., Tolonen, T. and Sahlstedt, S. (2008). "Waste and Labor productivity in Production Planning, " Proceedings of the 16th Annual Conference of the IGLC, Haifa, pp. 477-486.
-
(2008)
Proceedings of the 16th Annual Conference of the IGLC
, pp. 477-486
-
-
Koskenvesa, A.1
Koskela, L.2
Tolonen, T.3
Sahlstedt, S.4
-
20
-
-
2342647404
-
Impact of construction materials on project time and cost in Kuwait
-
Emerald Group Publishing Limited
-
Koushki, P.A. and Kartam, N. (2004). "Impact of construction materials on project time and cost in Kuwait, " Engineering, Construction and Architectural Management, Emerald Group Publishing Limited, Vol. 11 No. 2, pp. 126-132.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.2
, pp. 126-132
-
-
Koushki, P.A.1
Kartam, N.2
-
21
-
-
33748796091
-
Lean processes for sustainable project delivery
-
ASCE
-
Lapinski, A.R., Horman, M.J. and Riley, D.R. (2006). "Lean Processes for Sustainable Project Delivery, " J. Constr. Eng. Manage., ASCE, Vol. 132 No. 10, pp. 1083-1091.
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.10
, pp. 1083-1091
-
-
Lapinski, A.R.1
Horman, M.J.2
Riley, D.R.3
-
22
-
-
0028393005
-
Quality performance on successful project
-
ASCE, doi:10.1061/(ASCE)0733- 9364(1994)120:1(34
-
Ledbetter, W B. (1994), "Quality Performance on Successful Project, " J. Constr. Eng. Manage., ASCE, Vol. 120 No. 1, pp. 34-46. doi:10.1061/(ASCE)0733- 9364(1994)120:1(34).
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 34-46
-
-
Ledbetter, W.B.1
-
23
-
-
84855854530
-
A lean strategy to performance measurement- reducing waste by measuring ' Next ' customer needs
-
Manchester
-
Leong, M.S. and Tilley, P. (2008). "A Lean Strategy to Performance Measurement - Reducing Waste by Measuring ' Next ' Customer Needs, " Proceedings of the 16th Annual Conference of the IGLC, Manchester, pp. 757-768.
-
(2008)
Proceedings of the 16th Annual Conference of the IGLC
, pp. 757-768
-
-
Leong, M.S.1
Tilley, P.2
-
24
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
, ASCE
-
Love, P. (2002). "Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects, " J. Constr. Eng. Manage., ASCE, Vol. 128 No. 1, pp. 18-29.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.1
-
25
-
-
4143055741
-
Determinants of rework in building construction projects
-
Emerald Group Publishing Limited
-
Love, P. and Edwards, D.J. (2004). "Determinants of rework in building construction projects, " Engineering, Construction and Architectural Management, Emerald Group Publishing Limited, Vol. 11 No. 4, pp. 259-274.
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.4
, pp. 259-274
-
-
Love, P.1
Edwards, D.J.2
-
26
-
-
0000797825
-
Quantifying the causes and costs of rework in construction
-
Love, P. and Li, H. (2000). "Quantifying the causes and costs of rework in construction, " Constr. Mgmt and Econ., Vol. 18 No. 4, pp. 479-490.
-
(2000)
Constr. Mgmt and Econ.
, vol.18
, Issue.4
, pp. 479-490
-
-
Love, P.1
Li, H.2
-
27
-
-
0001187120
-
Determining the causal structure of rework influences in construction
-
Love, P., Mandal, P and Li, H. (1999), "Determining the causal structure of rework influences in construction, " Constr. Mgmt and Econ., Vol. 17 No. 4, pp. 505-517.
-
(1999)
Constr. Mgmt and Econ.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.1
Mandal, P.2
Li, H.3
-
28
-
-
2142718584
-
Modelling the dynamics of design error induced rework in construction
-
doi:10.1080/014461900407374
-
Love, P., Mandal, Purnendu, Smith, J. and Li, H. (2000), "Modelling the dynamics of design error induced rework in construction, " Constr. Mgmt and Econ., Vol. 18 No. 5, pp. 567- 574. doi:10.1080/014461900407374.
-
(2000)
Constr. Mgmt and Econ
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.1
Mandal, P.2
Smith, J.3
Li, H.4
-
29
-
-
2642539100
-
Benchmarking, benchaction, and benchlearning: Rework mitigation in projects
-
ASCE
-
Love, P. and Smith, J. (2003). "Benchmarking, Benchaction, and Benchlearning: Rework Mitigation in Projects, " J. Manage. Eng., ASCE, Vol. 19 No. 4, pp. 147-159.
-
(2003)
J. Manage. Eng.
, vol.19
, Issue.4
, pp. 147-159
-
-
Love, P.1
Smith, J.2
-
31
-
-
42549083736
-
Construction process reengineering by integrating lean principles and computer simulation techniques
-
ASCE
-
Mao, X. and Zhang, X. (2008). "Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques, " J. Constr. Eng. Manage., ASCE, Vol. 134 No. 5, pp. 371-381.
-
(2008)
J. Constr. Eng. Manage
, vol.134
, Issue.5
, pp. 371-381
-
-
Mao, X.1
Zhang, X.2
-
32
-
-
77953850521
-
Toyota production system: Practical approach to production management
-
Monden, Y. (1983). Toyota production system: Practical approach to production management., Industrial Engineering Management, p. 247.
-
(1983)
Industrial Engineering Management
, pp. 247
-
-
Monden, Y.1
-
33
-
-
84874483410
-
Effects of lean on sustainability of modular homebuilding
-
ASCE
-
Nahmens, I. and Ikuma, L.H. (2011). "Effects of Lean on Sustainability of Modular Homebuilding, " J. Archit. Eng, ASCE, Vol. 1 No. 1, p. 25.
-
(2011)
J. Archit. Eng.
, vol.1
, Issue.1
, pp. 25
-
-
Nahmens, I.1
Ikuma, L.H.2
-
34
-
-
84855941154
-
Lean homebuilding: Lessons learned from a precast concrete panelizer
-
Nahmens, I. and Mullens, M.A. (2011). "Lean Homebuilding: Lessons Learned from a Precast Concrete Panelizer, " J. Archit. Eng, Vol. 17 No. 4, p. 155.
-
(2011)
J. Archit. Eng
, vol.17
, Issue.4
, pp. 155
-
-
Nahmens, I.1
Mullens, M.A.2
-
36
-
-
84874491582
-
A floor-level construction material layout planning model considering actual travel path
-
ASCE
-
Park, M., Yang, Y., Lee, H.-S., Han, S. and Ji, S.-hyun. (2011). "A Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path, " J. Constr. Eng. Manage., ASCE, Vol. 1 No. 1, p. 363.
-
(2011)
J. Constr. Eng. Manage
, vol.1
, Issue.1
, pp. 363
-
-
Park, M.1
Yang, Y.2
Lee, H.-S.3
Han, S.4
Ji, S.-Hyun.5
-
37
-
-
0035852458
-
Systematic reviews from astronomy to zoology: Myths and misconceptions
-
doi:10.1136/bmj.322.7278.98
-
Petticrew, M. (2001). "Systematic reviews from astronomy to zoology: myths and misconceptions, " Bmj, Vol. 322 No. 7278, pp. 98-101. doi:10.1136/bmj.322.7278.98.
-
(2001)
Bmj
, vol.322
, Issue.7278
, pp. 98-101
-
-
Petticrew, M.1
-
39
-
-
7444268052
-
Management of construction waste in public housing projects in Hong Kong
-
Taylor & Francis
-
Poon, C.S., Yu, A.T.W., Wong, S.W. and Cheung, E. (2004). "Management of construction waste in public housing projects in Hong Kong, " Construction Management & Economics, Taylor & Francis, Vol. 22 No. 7, pp. 675-689.
-
(2004)
Construction Management & Economics
, vol.22
, Issue.7
, pp. 675-689
-
-
Poon, C.S.1
Yu, A.T.W.2
Wong, S.W.3
Cheung, E.4
-
40
-
-
84863505744
-
Building information modelling based analysis to minimize waste rate of structural reinforcement
-
ASCE
-
Porwal, A. and Hewage, K.N. (2011). "Building Information Modelling Based Analysis to Minimize Waste Rate of Structural Reinforcement, " J. Constr. Eng. Manage., ASCE, Vol. 1 No. 1, p. 376.
-
(2011)
J. Constr. Eng. Manage.
, vol.1
, Issue.1
, pp. 376
-
-
Porwal, A.1
Hewage, K.N.2
-
41
-
-
34247224920
-
LEAPCON: Simulation of lean construction of high-rise apartment buildings
-
ASCE
-
Sacks, R., Esquenazi, A. and Goldin, M. (2007). "LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings, " J. Constr. Eng. Manage., ASCE, Vol. 133 No. 5, pp. 374-384.
-
(2007)
J. Constr. Eng. Manage
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Esquenazi, A.2
Goldin, M.3
-
42
-
-
67849121453
-
Role of knowledge in managing construction project change
-
Emerald Group Publishing Limited
-
Senaratne, S. and Sexton, M.G. (2009), "Role of knowledge in managing construction project change, " Engineering, Construction and Architectural Management, Emerald Group Publishing Limited, Vol. 16 No. 2, pp. 186-200.
-
(2009)
Engineering, Construction and Architectural Management
, vol.16
, Issue.2
, pp. 186-200
-
-
Senaratne, S.1
Sexton, M.G.2
-
43
-
-
5844324478
-
Materials wastage- A misuse of resources
-
Skoyles, E.R. (1976), "Materials wastage - a misuse of resources, " Batiment International, Building Research and Practice, Vol. 4 No. 4, p. 232.
-
(1976)
Batiment International, Building Research and Practice
, vol.4
, Issue.4
, pp. 232
-
-
Skoyles, E.R.1
-
44
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
ASCE
-
Tommelein, I.D.I.D., Riley, D.R.D.R. and Howell, G. (1999), "Parade Game: Impact of Work Flow Variability on Trade Performance, " J. Constr. Eng. Manage., ASCE, Vol. 125 No. 5, pp. 304-310.
-
(1999)
J. Constr. Eng. Manage
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.I.D.1
Riley, D.R.D.R.2
Howell, G.3
-
45
-
-
84992957649
-
Industrial management approaches for improving material control in building services works
-
Emerald Group Publishing Limited
-
Wan, S.K.M. and Kumaraswamy, M.M. (2009), "Industrial management approaches for improving material control in building services works, " Engineering, Construction and Architectural Management, Emerald Group Publishing Limited, Vol. 16 No. 3, pp. 208- 223.
-
(2009)
Engineering, Construction and Architectural Management
, vol.16
, Issue.3
, pp. 208-223
-
-
Wan, S.K.M.1
Kumaraswamy, M.M.2
-
47
-
-
67651219247
-
Development of lean model for house construction using value stream mapping
-
ASCE
-
Yu, H., Tweed, T., Al-Hussein, M. and Nasseri, R. (2009). "Development of Lean Model for House Construction Using Value Stream Mapping, " J. Constr. Eng. Manage., ASCE, Vol. 135 No. 8, pp. 782-790.
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.8
, pp. 782-790
-
-
Yu, H.1
Tweed, T.2
Al-Hussein, M.3
Nasseri, R.4
-
48
-
-
77952930622
-
Prediction system for change management in construction project
-
ASCE
-
Zhao, Z.Y., Lv, Q.L., Zuo, J. and Zillante, G. (2010). "Prediction System for Change Management in Construction Project, " J. Constr. Eng. Manage., ASCE, Vol. 136 No. 6, pp. 659-669.
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.6
, pp. 659-669
-
-
Zhao, Z.Y.1
Lv, Q.L.2
Zuo, J.3
Zillante, G.4
|