-
1
-
-
33748802717
-
Value stream analysis of construction supply chains: Case study on pipe supports used in power plants
-
August 6-8, Gramado, Brazil, Universidade Federal do Rio Grande do Sul, Brazil
-
Arbulu, R., and Tommelein, I. (2002). "Value stream analysis of construction supply chains: Case study on pipe supports used in power plants." Proc., 10th Annual Conf. of Lean Construction, August 6-8, Gramado, Brazil, Universidade Federal do Rio Grande do Sul, Brazil.
-
(2002)
Proc., 10th Annual Conf. of Lean Construction
-
-
Arbulu, R.1
Tommelein, I.2
-
2
-
-
69949101125
-
Lean project delivery system
-
Lean Construction Institute, Ketchum, Id
-
Ballard, G. (2000). "Lean project delivery system." Lean Construction Institute White Paper No. 8, Lean Construction Institute, Ketchum, Id.
-
(2000)
Lean Construction Institute White Paper No. 8
-
-
Ballard, G.1
-
3
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
4
-
-
27644454484
-
Lean design: Process, tools, and techniques
-
Lean Construction Institute, Ketchum, Id
-
Ballard, G., and Zabelle, T. R. (2000). "Lean design: Process, tools, and techniques." Lean Construction Institute White Paper No. 10, Lean Construction Institute, Ketchum, Id.
-
(2000)
Lean Construction Institute White Paper No. 10
-
-
Ballard, G.1
Zabelle, T.R.2
-
5
-
-
27644478076
-
Can anything stop Toyota?
-
June 9, 2005
-
Bremner, B., Dawson, C., Kerwin, K., Palmeri, C., and Magnusson, P. (2003). "Can anything stop Toyota?" Business Week Online, 〈http://businessweek.com/magazine/content/03_46/b3858001_mz001.htm〉 (June 9, 2005).
-
(2003)
Business Week Online
-
-
Bremner, B.1
Dawson, C.2
Kerwin, K.3
Palmeri, C.4
Magnusson, P.5
-
6
-
-
0003438585
-
-
Little, Brown, and Company, Boston
-
Hawken, P., Lovins, A., and Lovins, L. (1999). Natural capitalism: Creating the next industrial revolution, Little, Brown, and Company, Boston.
-
(1999)
Natural Capitalism: Creating the next Industrial Revolution
-
-
Hawken, P.1
Lovins, A.2
Lovins, L.3
-
7
-
-
4243759695
-
-
Lean Enterprise Research Centre, Cardiff, U.K.
-
Hines, P., and Taylor, D. (2000). Going lean, Lean Enterprise Research Centre, Cardiff, U.K.
-
(2000)
Going Lean
-
-
Hines, P.1
Taylor, D.2
-
8
-
-
12344255065
-
Quantifying levels of wasted time in construction with meta-analysis
-
Horman, M., and Kenley, R. (2005). "Quantifying levels of wasted time in construction with meta-analysis." J. Constr. Eng. Manage., 131(1), 52-61.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 52-61
-
-
Horman, M.1
Kenley, R.2
-
9
-
-
33646746735
-
Delivering green building project: Process improvements for sustainable construction
-
Horman, M., Riley, D., Lapinski, A., Korkmaz, S., Pulaski, M., Magent, C., Luo, Y., Harding, N., and Dahl, P. (2006). "Delivering green building project: Process improvements for sustainable construction." Journal of Green Building, 1(1), 123-140.
-
(2006)
Journal of Green Building
, vol.1
, Issue.1
, pp. 123-140
-
-
Horman, M.1
Riley, D.2
Lapinski, A.3
Korkmaz, S.4
Pulaski, M.5
Magent, C.6
Luo, Y.7
Harding, N.8
Dahl, P.9
-
10
-
-
33748798427
-
Lean and green: Integrating sustainability and lean construction
-
May 2-7, Toronto, International Council for Research and Innovation in Building and Construction (CIB), Rotterdam, The Netherlands
-
Horman, M. J., Riley, D. R., Pulaski, M. H., and Leyenberger, C. (2004). "Lean and green: Integrating sustainability and lean construction," CIB World Building Congress, May 2-7, Toronto, International Council for Research and Innovation in Building and Construction (CIB), Rotterdam, The Netherlands.
-
(2004)
CIB World Building Congress
-
-
Horman, M.J.1
Riley, D.R.2
Pulaski, M.H.3
Leyenberger, C.4
-
11
-
-
84859272187
-
Contribution of the principles of lean construction to meet the challenges of sustainable development
-
August 13-15, Guarujá, Brazil
-
Huovila, P., and Koskela, L. (1998). "Contribution of the principles of lean construction to meet the challenges of sustainable development," Proc., 6th Annual Conf. on Lean Construction, August 13-15, Guarujá, Brazil.
-
(1998)
Proc., 6th Annual Conf. on Lean Construction
-
-
Huovila, P.1
Koskela, L.2
-
12
-
-
0003656231
-
Application of the new production philosophy to construction
-
Center for Integrated Facilities Engineering, Stanford Univ., Stanford, Calif
-
Koskela, L. (1992). "Application of the new production philosophy to construction." Technical Rep. No. 72, Center for Integrated Facilities Engineering, Stanford Univ., Stanford, Calif.
-
(1992)
Technical Rep. No. 72
-
-
Koskela, L.1
-
13
-
-
33748777879
-
-
MS thesis, Architectural Engineering, The Pennsylvania State University, University Park, Pa
-
Lapinski, A. R. (2005). "Delivering sustainability: Mapping Toyota Motor Sales' corporate facility delivery process." MS thesis, Architectural Engineering, The Pennsylvania State University, University Park, Pa.
-
(2005)
Delivering Sustainability: Mapping Toyota Motor Sales' Corporate Facility Delivery Process
-
-
Lapinski, A.R.1
-
14
-
-
84926464668
-
Delivering sustainability: Lean principles for green projects
-
April 5-7, San Diego, ASCE, Reston, Va
-
Lapinski, A., Horman, M., and Riley, D. (2005). "Delivering sustainability: Lean principles for green projects," ASCE Construction Research Congress (CRC), April 5-7, San Diego, ASCE, Reston, Va., 136-140.
-
(2005)
ASCE Construction Research Congress (CRC)
, pp. 136-140
-
-
Lapinski, A.1
Horman, M.2
Riley, D.3
-
17
-
-
27644454485
-
Toyota's new main campus: Green goes mainstream
-
New York
-
Pristin, T. (2003). "Toyota's new main campus: Green goes mainstream." The New York Times, New York, C6.
-
(2003)
The New York Times
-
-
Pristin, T.1
-
18
-
-
2342418206
-
Synergies between sustainable design and consttuctability at the Pentagon
-
March 18-20, Honolulu, ASCE, Reston, Va
-
Pulaski, M., Pohlman, T., Horman, M., and Riley, D. (2003). "Synergies between sustainable design and consttuctability at the Pentagon." ASCE Construction Research Congress (CRC), March 18-20, Honolulu, ASCE, Reston, Va.
-
(2003)
ASCE Construction Research Congress (CRC)
-
-
Pulaski, M.1
Pohlman, T.2
Horman, M.3
Riley, D.4
-
19
-
-
27644533025
-
Sustainable metrics: A design process model for high performance buildings
-
May 2-7, Toronto, CIB, The Netherlands
-
Riley, D., Magent, C., and Horman, M. (2004). "Sustainable metrics: A design process model for high performance buildings," CIB World Building Congress, May 2-7, Toronto, CIB, The Netherlands.
-
(2004)
CIB World Building Congress
-
-
Riley, D.1
Magent, C.2
Horman, M.3
-
20
-
-
0004046182
-
-
Lean Enterprise Institute, Brookline, Mass
-
Rother, M., and Harris, R. (2002). Creating continuous flow, Lean Enterprise Institute, Brookline, Mass.
-
(2002)
Creating Continuous Flow
-
-
Rother, M.1
Harris, R.2
-
21
-
-
0004277453
-
-
Lean Enterprise Institute, Brookline, Mass
-
Rother, M., and Shook, J. (1999). Learning to see, Lean Enterprise Institute, Brookline, Mass.
-
(1999)
Learning to See
-
-
Rother, M.1
Shook, J.2
-
22
-
-
0037489532
-
An integrated building process model
-
The Pennsylvania State University, University Park, Pa
-
Sanvido, V. E. (1990). "An integrated building process model." Construction Research Program Technical Rep. No. 1. The Pennsylvania State University, University Park, Pa.
-
(1990)
Construction Research Program Technical Rep. No. 1.
-
-
Sanvido, V.E.1
-
23
-
-
0003969428
-
-
Productivity Press, Cambridge, Mass
-
Shingo, S., and Dillon, A. P. (1989). A Study of the Toyota production system from an industrial engineering viewpoint, Productivity Press, Cambridge, Mass.
-
(1989)
A Study of the Toyota Production System from An Industrial Engineering Viewpoint
-
-
Shingo, S.1
Dillon, A.P.2
-
25
-
-
2442477648
-
Learning to lead at Toyota
-
Spear, S. J. (2004). "Learning to lead at Toyota." Harvard Bus. Rev., 82(5), 78-91.
-
(2004)
Harvard Bus. Rev.
, vol.82
, Issue.5
, pp. 78-91
-
-
Spear, S.J.1
-
26
-
-
0002623534
-
Decoding the DNA of the Toyota production system
-
Spear, S. J., and Bowen, H. K. (1999). "Decoding the DNA of the Toyota production system." Harvard Bus. Rev., 77(5), 96-106.
-
(1999)
Harvard Bus. Rev.
, vol.77
, Issue.5
, pp. 96-106
-
-
Spear, S.J.1
Bowen, H.K.2
-
28
-
-
0002372299
-
Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
-
July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif
-
Tommelein, I. D., and Li, A. E. Y. (1999). "Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration," Proc., 7th Annual Conf. on Lean Construction, July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
-
(1999)
Proc., 7th Annual Conf. on Lean Construction
-
-
Tommelein, I.D.1
Li, A.E.Y.2
-
29
-
-
33748771924
-
More just-in-time: Location of buffers in structural steel supply and construction processes
-
July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif
-
Tommelein, I. D., and Weissenberger. M. (1999). "More just-in-time: Location of buffers in structural steel supply and construction processes," Proc., 7th Annual Conf. on Lean Construction, July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
-
(1999)
Proc., 7th Annual Conf. on Lean Construction
-
-
Tommelein, I.D.1
Weissenberger, M.2
-
30
-
-
63049111426
-
GSA LEED cost study: Final report
-
GSA, Washington, D.C.
-
U.S. General Services Administration (GSA). (2004). "GSA LEED cost study: Final report," Rep. No. GS-11P-99-MAD-0565, GSA, Washington, D.C.
-
(2004)
Rep. No. GS-11P-99-MAD-0565
-
-
-
31
-
-
0003463029
-
-
HarperPerennial, New York
-
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world: The story of lean production, HarperPerennial, New York.
-
(1990)
The Machine That Changed the World: the Story of Lean Production
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|