메뉴 건너뛰기




Volumn 132, Issue 10, 2006, Pages 1083-1091

Lean processes for sustainable project delivery

Author keywords

Construction industry; Delivery; Sustainable development

Indexed keywords

LEAN PROCESSES; LEAN PRODUCTION; OPERATIONAL SAVINGS; PROJECT COSTS;

EID: 33748796091     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:10(1083)     Document Type: Article
Times cited : (219)

References (31)
  • 1
    • 33748802717 scopus 로고    scopus 로고
    • Value stream analysis of construction supply chains: Case study on pipe supports used in power plants
    • August 6-8, Gramado, Brazil, Universidade Federal do Rio Grande do Sul, Brazil
    • Arbulu, R., and Tommelein, I. (2002). "Value stream analysis of construction supply chains: Case study on pipe supports used in power plants." Proc., 10th Annual Conf. of Lean Construction, August 6-8, Gramado, Brazil, Universidade Federal do Rio Grande do Sul, Brazil.
    • (2002) Proc., 10th Annual Conf. of Lean Construction
    • Arbulu, R.1    Tommelein, I.2
  • 2
    • 69949101125 scopus 로고    scopus 로고
    • Lean project delivery system
    • Lean Construction Institute, Ketchum, Id
    • Ballard, G. (2000). "Lean project delivery system." Lean Construction Institute White Paper No. 8, Lean Construction Institute, Ketchum, Id.
    • (2000) Lean Construction Institute White Paper No. 8
    • Ballard, G.1
  • 3
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 4
  • 7
    • 4243759695 scopus 로고    scopus 로고
    • Lean Enterprise Research Centre, Cardiff, U.K.
    • Hines, P., and Taylor, D. (2000). Going lean, Lean Enterprise Research Centre, Cardiff, U.K.
    • (2000) Going Lean
    • Hines, P.1    Taylor, D.2
  • 8
    • 12344255065 scopus 로고    scopus 로고
    • Quantifying levels of wasted time in construction with meta-analysis
    • Horman, M., and Kenley, R. (2005). "Quantifying levels of wasted time in construction with meta-analysis." J. Constr. Eng. Manage., 131(1), 52-61.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 52-61
    • Horman, M.1    Kenley, R.2
  • 10
    • 33748798427 scopus 로고    scopus 로고
    • Lean and green: Integrating sustainability and lean construction
    • May 2-7, Toronto, International Council for Research and Innovation in Building and Construction (CIB), Rotterdam, The Netherlands
    • Horman, M. J., Riley, D. R., Pulaski, M. H., and Leyenberger, C. (2004). "Lean and green: Integrating sustainability and lean construction," CIB World Building Congress, May 2-7, Toronto, International Council for Research and Innovation in Building and Construction (CIB), Rotterdam, The Netherlands.
    • (2004) CIB World Building Congress
    • Horman, M.J.1    Riley, D.R.2    Pulaski, M.H.3    Leyenberger, C.4
  • 11
    • 84859272187 scopus 로고    scopus 로고
    • Contribution of the principles of lean construction to meet the challenges of sustainable development
    • August 13-15, Guarujá, Brazil
    • Huovila, P., and Koskela, L. (1998). "Contribution of the principles of lean construction to meet the challenges of sustainable development," Proc., 6th Annual Conf. on Lean Construction, August 13-15, Guarujá, Brazil.
    • (1998) Proc., 6th Annual Conf. on Lean Construction
    • Huovila, P.1    Koskela, L.2
  • 12
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • Center for Integrated Facilities Engineering, Stanford Univ., Stanford, Calif
    • Koskela, L. (1992). "Application of the new production philosophy to construction." Technical Rep. No. 72, Center for Integrated Facilities Engineering, Stanford Univ., Stanford, Calif.
    • (1992) Technical Rep. No. 72
    • Koskela, L.1
  • 14
    • 84926464668 scopus 로고    scopus 로고
    • Delivering sustainability: Lean principles for green projects
    • April 5-7, San Diego, ASCE, Reston, Va
    • Lapinski, A., Horman, M., and Riley, D. (2005). "Delivering sustainability: Lean principles for green projects," ASCE Construction Research Congress (CRC), April 5-7, San Diego, ASCE, Reston, Va., 136-140.
    • (2005) ASCE Construction Research Congress (CRC) , pp. 136-140
    • Lapinski, A.1    Horman, M.2    Riley, D.3
  • 17
    • 27644454485 scopus 로고    scopus 로고
    • Toyota's new main campus: Green goes mainstream
    • New York
    • Pristin, T. (2003). "Toyota's new main campus: Green goes mainstream." The New York Times, New York, C6.
    • (2003) The New York Times
    • Pristin, T.1
  • 18
    • 2342418206 scopus 로고    scopus 로고
    • Synergies between sustainable design and consttuctability at the Pentagon
    • March 18-20, Honolulu, ASCE, Reston, Va
    • Pulaski, M., Pohlman, T., Horman, M., and Riley, D. (2003). "Synergies between sustainable design and consttuctability at the Pentagon." ASCE Construction Research Congress (CRC), March 18-20, Honolulu, ASCE, Reston, Va.
    • (2003) ASCE Construction Research Congress (CRC)
    • Pulaski, M.1    Pohlman, T.2    Horman, M.3    Riley, D.4
  • 19
    • 27644533025 scopus 로고    scopus 로고
    • Sustainable metrics: A design process model for high performance buildings
    • May 2-7, Toronto, CIB, The Netherlands
    • Riley, D., Magent, C., and Horman, M. (2004). "Sustainable metrics: A design process model for high performance buildings," CIB World Building Congress, May 2-7, Toronto, CIB, The Netherlands.
    • (2004) CIB World Building Congress
    • Riley, D.1    Magent, C.2    Horman, M.3
  • 21
    • 0004277453 scopus 로고    scopus 로고
    • Lean Enterprise Institute, Brookline, Mass
    • Rother, M., and Shook, J. (1999). Learning to see, Lean Enterprise Institute, Brookline, Mass.
    • (1999) Learning to See
    • Rother, M.1    Shook, J.2
  • 22
    • 0037489532 scopus 로고
    • An integrated building process model
    • The Pennsylvania State University, University Park, Pa
    • Sanvido, V. E. (1990). "An integrated building process model." Construction Research Program Technical Rep. No. 1. The Pennsylvania State University, University Park, Pa.
    • (1990) Construction Research Program Technical Rep. No. 1.
    • Sanvido, V.E.1
  • 25
    • 2442477648 scopus 로고    scopus 로고
    • Learning to lead at Toyota
    • Spear, S. J. (2004). "Learning to lead at Toyota." Harvard Bus. Rev., 82(5), 78-91.
    • (2004) Harvard Bus. Rev. , vol.82 , Issue.5 , pp. 78-91
    • Spear, S.J.1
  • 26
    • 0002623534 scopus 로고    scopus 로고
    • Decoding the DNA of the Toyota production system
    • Spear, S. J., and Bowen, H. K. (1999). "Decoding the DNA of the Toyota production system." Harvard Bus. Rev., 77(5), 96-106.
    • (1999) Harvard Bus. Rev. , vol.77 , Issue.5 , pp. 96-106
    • Spear, S.J.1    Bowen, H.K.2
  • 28
    • 0002372299 scopus 로고    scopus 로고
    • Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
    • July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif
    • Tommelein, I. D., and Li, A. E. Y. (1999). "Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration," Proc., 7th Annual Conf. on Lean Construction, July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
    • (1999) Proc., 7th Annual Conf. on Lean Construction
    • Tommelein, I.D.1    Li, A.E.Y.2
  • 29
    • 33748771924 scopus 로고    scopus 로고
    • More just-in-time: Location of buffers in structural steel supply and construction processes
    • July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif
    • Tommelein, I. D., and Weissenberger. M. (1999). "More just-in-time: Location of buffers in structural steel supply and construction processes," Proc., 7th Annual Conf. on Lean Construction, July 26-28, Berkeley, Calif., University of California-Berkeley, Berkeley, Calif.
    • (1999) Proc., 7th Annual Conf. on Lean Construction
    • Tommelein, I.D.1    Weissenberger, M.2
  • 30
    • 63049111426 scopus 로고    scopus 로고
    • GSA LEED cost study: Final report
    • GSA, Washington, D.C.
    • U.S. General Services Administration (GSA). (2004). "GSA LEED cost study: Final report," Rep. No. GS-11P-99-MAD-0565, GSA, Washington, D.C.
    • (2004) Rep. No. GS-11P-99-MAD-0565