Scheduling system for high-rise building construction
-
Arditi, D., Sikangwan, P., and Tokdemir, O. B. (2002). " Scheduling system for high-rise building construction.. " Constr. Manage. Econom., 20 (4), 353-364.
-
(2002)
Constr. Manage. Econom.
, vol.20
, Issue.4
, pp. 353-364
-
-
Arditi, D.1
Sikangwan, P.2
Tokdemir, O.B.3
-
2
-
-
84993019243
-
Scheduling system for repetitive unit construction using line-of-balance technology
-
Arditi, D., Tokdemir, O. B., and Suh, K. (2001). " Scheduling system for repetitive unit construction using line-of-balance technology.. " Eng., Constr., Archit. Manage., 8 (2), 90-103.
-
(2001)
Eng., Constr., Archit. Manage.
, vol.8
, Issue.2
, pp. 90-103
-
-
Arditi, D.1
Tokdemir, O.B.2
Suh, K.3
-
3
-
-
0029378035
-
Monte Carlo simulation as a tool for process reengineering
-
Back, W. E., and Bell, L. C. (1995). " Monte Carlo simulation as a tool for process reengineering.. " J. Management in Engineering, 11 (5), 46-53.
-
(1995)
J. Management in Engineering
, vol.11
, Issue.5
, pp. 46-53
-
-
Back, W.E.1
Bell, L.C.2
-
4
-
-
34250652104
-
-
D.Chua and G.Ballard, eds., National Univ. of Singapore, Singapore
-
Ballard, G. (2001). " Cycle time reduction in home building.. " 9th Int. Group for Lean Construction, D. Chua, and, G. Ballard, eds., National Univ. of Singapore, Singapore, 1-9.
-
(2001)
Cycle Time Reduction in Home Building
, pp. 1-9
-
-
Ballard, G.1
-
5
-
-
3242706628
-
Learning to see work flow: An application of lean concepts to precast concrete fabrication
-
Ballard, G., Harper, N., and Zabelle, T. (2003). " Learning to see work flow: An application of lean concepts to precast concrete fabrication.. " Eng., Constr., Archit. Manage., 10 (1), 6-14.
-
(2003)
Eng., Constr., Archit. Manage.
, vol.10
, Issue.1
, pp. 6-14
-
-
Ballard, G.1
Harper, N.2
Zabelle, T.3
-
6
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). " Shielding production: Essential step in production control.. " J. Constr. Eng. Manage., 124 (1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
7
-
-
12344273517
-
Production system loading: Cycle time relationship in residential construction
-
Bashford, H. H., Walsh, K., and Sawhney, A. (2005). " Production system loading: Cycle time relationship in residential construction.. " J. Constr. Eng. Manage., 131 (1), 15-22.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 15-22
-
-
Bashford, H.H.1
Walsh, K.2
Sawhney, A.3
-
8
-
-
33748128207
-
Accident trends involving construction plant: An exploratory analysis
-
Edwards, D. J. (2003). " Accident trends involving construction plant: An exploratory analysis.. " J. Constr. Res., 4 (2), 161-173.
-
(2003)
J. Constr. Res.
, vol.4
, Issue.2
, pp. 161-173
-
-
Edwards, D.J.1
-
9
-
-
34250617909
-
-
Egan, J. (1998). Rethinking construction. U.K. Department of Trade and Industry, 〈 http://www.constructingexcellence.org.uk/pdf/ rethinking%20construction/rethinking_construction_report.pdf 〉.
-
(1998)
-
-
Egan, J.1
-
10
-
-
12444344998
-
Resource-driven scheduling of repetitive activities
-
El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities.. " Constr. Manage. Econom., 16, 433-446.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 433-446
-
-
El-Rayes, K.1
Moselhi, O.2
-
11
-
-
84986142805
-
Generic implementation of lean concepts in simulation models
-
Farrar, J. M., AbouRizk, S. M., and Mao, X. (2004). " Generic implementation of lean concepts in simulation models.. " Lean Construction J., 1 (1), 1-23.
-
(2004)
Lean Construction J.
, vol.1
, Issue.1
, pp. 1-23
-
-
Farrar, J.M.1
Abourizk, S.M.2
Mao, X.3
-
12
-
-
1842860777
-
Object-oriented model for customer-building company interaction in mass customization environment
-
Frutos, J. D., and Borenstein, D. (2003). " Object-oriented model for customer-building company interaction in mass customization environment.. " J. Constr. Eng. Manage., 129 (3), 302-313.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 302-313
-
-
Frutos, J.D.1
Borenstein, D.2
-
13
-
-
0002908379
-
Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan
-
Gann, D. M. (1996). " Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan.. " Constr. Manage. Econom., 14 (5), 437-450.
-
(1996)
Constr. Manage. Econom.
, vol.14
, Issue.5
, pp. 437-450
-
-
Gann, D.M.1
-
14
-
-
3242734677
-
Theoretical comparison of alternative delivery systems for projects in unpredictable environments
-
Gil, N., Tommelein, I. D., and Ballard, G. (2004). " Theoretical comparison of alternative delivery systems for projects in unpredictable environments.. " Constr. Manage. Econom., 22 (5), 495-508.
-
(2004)
Constr. Manage. Econom.
, vol.22
, Issue.5
, pp. 495-508
-
-
Gil, N.1
Tommelein, I.D.2
Ballard, G.3
-
15
-
-
34250633623
-
-
Goldratt, E. M. (1997). Critical chain, North River Press, Great Barrington, Mass.
-
(1997)
-
-
Goldratt, E.M.1
-
16
-
-
0017539255
-
CYCLONE: Method for modeling job site processes
-
Halpin, D. W. (1977). " CYCLONE: Method for modeling job site processes.. " J. Constr. Div., 103 (3), 489-499.
-
(1977)
J. Constr. Div.
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
17
-
-
0032656251
-
Impact of change orders on labor efficiency for mechanical construction
-
Hanna, A. S., Russell, J. S., Gotzion, T. W., and Nordheim, E. V. (1999). " Impact of change orders on labor efficiency for mechanical construction.. " J. Constr. Eng. Manage., 125 (3), 176-184.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 176-184
-
-
Hanna, A.S.1
Russell, J.S.2
Gotzion, T.W.3
Nordheim, E.V.4
-
18
-
-
0028454852
-
The contractor-subcontractor relationship: The subcontractor's view
-
Hinze, J., and Tracey, A. (1994). " The contractor-subcontractor relationship: The subcontractor's view.. " J. Constr. Eng. Manage., 120 (2), 274-287.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.2
, pp. 274-287
-
-
Hinze, J.1
Tracey, A.2
-
20
-
-
0002083363
-
Impact of subcontracting on site productivity: Lessons learned in Taiwan
-
Hsieh, T. (1998). " Impact of subcontracting on site productivity: Lessons learned in Taiwan.. " J. Constr. Eng. Manage., 124 (2), 91-100.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.2
, pp. 91-100
-
-
Hsieh, T.1
-
21
-
-
0032593163
-
The causes and costs of defects in construction: A study of seven building projects
-
Josephson, P. E., and Hammarlund, Y. (1999). " The causes and costs of defects in construction: A study of seven building projects.. " Autom. Constr., 8, 681-687.
-
(1999)
Autom. Constr.
, vol.8
, pp. 681-687
-
-
Josephson, P.E.1
Hammarlund, Y.2
-
22
-
-
34250664260
-
Making do: The eighth category of waste
-
S.Bertelsen and C.Formoso, eds., Elsinore, Denmark
-
Koskela, L. (2004). " Making do: The eighth category of waste.. " 12th Conf. of the Int. Group for Lean Construction, S. Bertelsen, and, C. Formoso, eds., Elsinore, Denmark, 3-12.
-
(2004)
12th Conf. of the Int. Group for Lean Construction
, pp. 3-12
-
-
Koskela, L.1
-
23
-
-
0013198772
-
The underlying theory of project management is obsolete
-
D. P.Slevin, J. K.Pinto, eds., Project Management Institute
-
Koskela, L., and Howell, G. (2002). " The underlying theory of project management is obsolete.. " PMI Research Conf., Seattle, D. P. Slevin, D. I. Cleland, and, J. K. Pinto, eds., Project Management Institute, 293-302.
-
(2002)
PMI Research Conf.
, pp. 293-302
-
-
Koskela, L.1
Howell, G.2
Cleland, D.I.3
-
24
-
-
16444365584
-
Delays and cost increases in the construction of private residential projects in Kuwait
-
Koushki, P. A., Al-Rashid, K., and Kartam, N. (2005). " Delays and cost increases in the construction of private residential projects in Kuwait.. " Constr. Manage. Econom., 23, 285-294.
-
(2005)
Constr. Manage. Econom.
, vol.23
, pp. 285-294
-
-
Koushki, P.A.1
Al-Rashid, K.2
Kartam, N.3
-
25
-
-
34250675704
-
-
Laufer, A. (1996). Simultaneous management, American Management Association, New York.
-
(1996)
-
-
Laufer, A.1
-
26
-
-
34250623283
-
-
LCI. (2004). Lean Construction Institute, 〈 http://www. leanconstruction.org/ 〉 (March 26, 2005).
-
(2004)
-
-
-
27
-
-
34250617094
-
-
LEAPCON.
-
LEAPCON. (2005). Technion LEAPCON management simulation game, 〈 http://www.technion.ac.il/~cvsacks/tech-leap.htm 〉 (November 21, 2005).
-
(2005)
-
-
-
28
-
-
2142718584
-
Modeling the dynamics of design error induced rework in construction projects
-
Love, P. E. D., Mandal, P., Smith, J., and Li, H. (2000). " Modeling the dynamics of design error induced rework in construction projects.. " Constr. Manage. Econom., 18 (5), 567-574.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.5
, pp. 567-574
-
-
Love, P.E.D.1
Mandal, P.2
Smith, J.3
Li, H.4
-
29
-
-
0032677122
-
General purpose systems for effective construction simulation
-
Martinez, J. C., and Ioannou, P. G. (1999). " General purpose systems for effective construction simulation.. " J. Constr. Eng. Manage., 125 (4), 265-276.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
30
-
-
14544291592
-
Change orders impact on labor productivity
-
Moselhi, O., Assem, I., and El-Rayes, K. (2005). " Change orders impact on labor productivity.. " J. Constr. Eng. Manage., 131 (3), 354-359.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.3
, pp. 354-359
-
-
Moselhi, O.1
Assem, I.2
El-Rayes, K.3
-
31
-
-
0012763346
-
An innovative supply chain strategy for customized housing
-
Naim, M., and Barlow, J. (2003). " An innovative supply chain strategy for customized housing.. " Constr. Manage. Econom., 21, 593-602.
-
(2003)
Constr. Manage. Econom.
, vol.21
, pp. 593-602
-
-
Naim, M.1
Barlow, J.2
-
32
-
-
2142649813
-
Network analysis and construction planning
-
Peer, S. (1974). " Network analysis and construction planning.. " J. Constr. Div., 100 (3), 203-210.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 203-210
-
-
Peer, S.1
-
34
-
-
34247279276
-
Lean management model for construction of high-rise apartment buildings
-
Sacks, R., and Goldin, M. (2007). " Lean management model for construction of high-rise apartment buildings.. " J. Constr. Eng. Manage., 133 (5), 374-384.
-
(2007)
J. Constr. Eng. Manage.
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
35
-
-
34247263892
-
A case study of line-of-balance based schedule planning and control system
-
R.Kenley, ed., Univ. of New South Wales, Sydney, Australia
-
Seppanen, O., and Aalto, E. (2005). " A case study of line-of-balance based schedule planning and control system.. " 13th Conf. of the Int. Group for Lean Construction, R. Kenley, ed., Univ. of New South Wales, Sydney, Australia, 271-279.
-
(2005)
13th Conf. of the Int. Group for Lean Construction
, pp. 271-279
-
-
Seppanen, O.1
Aalto, E.2
-
36
-
-
0009206894
-
Characterization of waste in building construction products
-
G.Howell, ed., Univ. of New Mexico, Albuquerque, New Mexico.
-
Serpell, A., Venturi, A., and Contreras, J. (1995). " Characterization of waste in building construction products.. " 3rd Annual Conf. of the Int. Group for Lean Construction, G. Howell, ed., Univ. of New Mexico, Albuquerque, New Mexico.
-
(1995)
3rd Annual Conf. of the Int. Group for Lean Construction
-
-
Serpell, A.1
Venturi, A.2
Contreras, J.3
-
37
-
-
0001582375
-
Knowledge-based system for construction planning of high-rise buildings
-
Shaked, O., and Warszawski, A. (1995). " Knowledge-based system for construction planning of high-rise buildings.. " J. Constr. Eng. Manage., 121 (2), 172-182.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.2
, pp. 172-182
-
-
Shaked, O.1
Warszawski, A.2
-
38
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). " Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique.. " J. Constr. Eng. Manage., 124 (4), 279-288.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
39
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). " Parade game: Impact of work flow variability on trade performance.. " J. Constr. Eng. Manage., 125 (5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
41
-
-
33748134508
-
Cycle-time contributions of hyperspecialization and time-gating strategies in US residential construction
-
J.Martinez and C.Formoso, eds., Virginia Polytechnic Institute and State Univ., Blacksburg.
-
Walsh, K. D., Sawhney, A., and Bashford, H. H. (2003). " Cycle-time contributions of hyperspecialization and time-gating strategies in US residential construction.. " 11th Annual Conf. on Lean Construction, J. Martinez, and, C. Formoso, eds., Virginia Polytechnic Institute and State Univ., Blacksburg.
-
(2003)
11th Annual Conf. on Lean Construction
-
-
Walsh, K.D.1
Sawhney, A.2
Bashford, H.H.3
-
42
-
-
13944277321
-
A practical multi-factor approach to evaluating the risk of investment in engineering projects
-
Warszawski, A., and Sacks, R. (2003). " A practical multi-factor approach to evaluating the risk of investment in engineering projects.. " J. Constr. Eng. Manage., 130 (3), 357-367.
-
(2003)
J. Constr. Eng. Manage.
, vol.130
, Issue.3
, pp. 357-367
-
-
Warszawski, A.1
Sacks, R.2
|