-
1
-
-
0001817717
-
Capturing the cost of non-conformance on construction sites-An application of the quality cost matrix
-
Abdul-Rahman, H., Thompson, P. A., and Whyte, I. L. (1996). Capturing the cost of non-conformance on construction sites-An application of the quality cost matrix, International Journal of Quality & Reliability Management, Vol. 13, Issue 1, pp 48-60
-
(1996)
International Journal of Quality & Reliability Management
, vol.13
, Issue.1
, pp. 48-60
-
-
Abdul-Rahman, H.1
Thompson, P.A.2
Whyte, I.L.3
-
3
-
-
1642436840
-
An application of lean concepts and simulation for drainage operations maintenance crews
-
Edited by Chick, S., Sánchez, P. J., Ferrin, D. and Morrice, D. J.
-
Agbulos, A., and AbouRizk, S. M. (2003). An application of lean concepts and simulation for drainage operations maintenance crews, Proceedings of the 2003 Winter Simulation Conference, Edited by Chick, S., Sánchez, P. J., Ferrin, D. and Morrice, D. J., pp 1534-1540
-
(2003)
Proceedings of the 2003 Winter Simulation Conference
, pp. 1534-1540
-
-
Agbulos, A.1
Abourizk, S.M.2
-
4
-
-
84866072076
-
Labour productivity in the building construction
-
W065/W055/W086-Construction in the XXI Century: Local and global challenges, October 2006, Rome, Italy
-
Alinaitwe, H., Mwakali J., and Hansson B. (2005). Labour productivity in the building construction, Proceedings of CIB 2006, W065/W055/W086-Construction in the XXI Century: Local and global challenges, October 2006, Rome, Italy
-
(2005)
Proceedings of CIB 2006
-
-
Alinaitwe, H.1
Mwakali, J.2
Hansson, B.3
-
6
-
-
8844247069
-
Report on elimination of waste in industry
-
Anonymous. September
-
Anonymous (1921). Report on elimination of waste in industry, Mechanical Engineering, September, pp 579-583
-
(1921)
Mechanical Engineering
, pp. 579-583
-
-
-
7
-
-
0004011301
-
-
School of Civil Engineering, Faculty of Engineering, University of Birmingham, Birmingham, UK
-
Ballard, H. G. (2000). The last planner system of production control, School of Civil Engineering, Faculty of Engineering, University of Birmingham, Birmingham, UK
-
(2000)
The Last Planner System of Production Control
-
-
Ballard, H.G.1
-
8
-
-
0001326664
-
Quality failure costs in civil engineering projects
-
Barber, P., Graves, A., Hall, M., Sheath, D., and Tomkins, C. (2000). Quality failure costs in civil engineering projects, International Journal of Quality and Reliability Management, Vol. 17, and Issue 4/5, pp 479-492
-
(2000)
International Journal of Quality and Reliability Management
, vol.17
, Issue.4-5
, pp. 479-492
-
-
Barber, P.1
Graves, A.2
Hall, M.3
Sheath, D.4
Tomkins, C.5
-
9
-
-
84866069787
-
-
Byggforskningsrådet, Stockholm, Sweden, R33:1994, ISBN 91-540-5674-8
-
Borgbrant, J. and Lugnegård, M. (1994). Effekter av produktivitetsarbete, Byggforskningsrådet, Stockholm, Sweden, R33:1994, ISBN 91-540-5674-8
-
(1994)
Effekter Av Produktivitetsarbete
-
-
Borgbrant, J.1
Lugnegård, M.2
-
11
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
Bossink, B. A. G. and Brouwers, H. J. H. (1996). Construction Waste: Quantification and Source Evaluation, Journal of Construction Engineering and Management, Vol. 122, No. 1, pp 55-60
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.1
, pp. 55-60
-
-
Bossink, B.A.G.1
Brouwers, H.J.H.2
-
12
-
-
0026837054
-
Causes of quality deviations in design and construction
-
Burati, J. L., Farrington, J. J. and Ledbetter, W. B. (1992). Causes of Quality Deviations in Design and Construction, Journal of Construction Engineering and Management, Vol. 118, Issue 1, pp 34-49
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.L.1
Farrington, J.J.2
Ledbetter, W.B.3
-
13
-
-
0036935371
-
Using lean principles to streamline the quotation process: A case study
-
Buzby, C. M., Gerstenfeld, A., Voss, L. E., and Zeng, A. Z. (2002). Using lean principles to streamline the quotation process: a case study, Industrial Management & Data Systems, Vol. 102, Issue 9, pp 513-520
-
(2002)
Industrial Management & Data Systems
, vol.102
, Issue.9
, pp. 513-520
-
-
Buzby, C.M.1
Gerstenfeld, A.2
Voss, L.E.3
Zeng, A.Z.4
-
15
-
-
4243464247
-
-
Byggkostnadsdelegationen. SOU 2000:44, Stockholm, Sweden
-
Byggkostnadsdelegationen (2000). Från byggsekt till byggsektor, SOU 2000:44, Stockholm, Sweden
-
(2000)
Från Byggsekt Till Byggsektor
-
-
-
16
-
-
4243298456
-
-
Byggkvalitetsutredningen, SOU 1997:177, Stockholm, Sweden
-
Byggkvalitetsutredningen (1997). Byggkvalitet för framtiden, SOU 1997:177, Stockholm, Sweden
-
(1997)
Byggkvalitet för Framtiden
-
-
-
17
-
-
0347959591
-
-
6th edition. Butterworth-Heinemann, Jordan Hill, Oxford, OX2 8DP, 200 Wheeler road, Burlington, MA 01803
-
Calvert R. E., Coles D. C. H. and baily G. J. (1995). Introduction to Building Management, 6th edition. Butterworth-Heinemann, Jordan Hill, Oxford, OX2 8DP, 200 Wheeler road, Burlington, MA 01803
-
(1995)
Introduction to Building Management
-
-
Calvert, R.E.1
Coles, D.C.H.2
Baily, G.J.3
-
18
-
-
84866060947
-
-
ongoing licentiate thesis, Luleå University of Technology, Project nr: 1168202
-
Forsberg, A. (ongoing licentiate thesis, 2007). Produktivitetsmä tningar som förändringsverktyg, Luleå University of Technology, Project nr: 1168202
-
(2007)
Produktivitetsmätningar Som Förändringsverktyg
-
-
Forsberg, A.1
-
19
-
-
79960205634
-
Method for waste control in the Building Industry
-
Formoso, C. T., Isatto, E. L., and Hirota, E. H. (1999).Method for waste control in the Building Industry, Proceedings of International Group of Lean Construction 7
-
(1999)
Proceedings of International Group of Lean Construction
, vol.7
-
-
Formoso, C.T.1
Isatto, E.L.2
Hirota, E.H.3
-
20
-
-
1842699306
-
Material waste in building industry: Main causes and prevention
-
Formoso, C. T., Soibelman, L., De Cesare, C., and Isatto, E. L. (2002). "Material waste in building industry: Main causes and prevention", Journal of Construction Engineering and Management, Vol. 128, Issue 4, pp 316-325
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 316-325
-
-
Formoso, C.T.1
Soibelman, L.2
De Cesare, C.3
Isatto, E.L.4
-
21
-
-
79960284972
-
Materials waste in the Egyptian construction industry
-
August 2001, Singapore
-
Garas, G. L., Anis, A. R., and El Gammal, A. (2001). Materials waste in the Egyptian construction industry, Proceedings of IGLC-9, August 2001, Singapore
-
(2001)
Proceedings of IGLC-9
-
-
Garas, G.L.1
Anis, A.R.2
El Gammal, A.3
-
22
-
-
0026842035
-
The creation and use of labour productivity standards among specialist subcontractors in the construction industry
-
Gilleard, J. D. (1992). The creation and use of labour productivity standards among specialist subcontractors in the construction industry, Cost Engineering, 34
-
(1992)
Cost Engineering
, vol.34
-
-
Gilleard, J.D.1
-
23
-
-
0035501547
-
A cost of quality analysis of a building project: Towards a complete methodology for design and build
-
Hall, M., and Tomkins, C. (2001). A cost of quality analysis of a building project: towards a complete methodology for design and build, Construction Management and Economics, Vol. 19, Issue 7, pp 727-740
-
(2001)
Construction Management and Economics
, vol.19
, Issue.7
, pp. 727-740
-
-
Hall, M.1
Tomkins, C.2
-
25
-
-
0032650785
-
Performance improvement: A total poor-quality cost system
-
Harrington, H. J. (1999). Performance improvement: a total poor-quality cost system, The TQM Magazine, Vol. 11, Issue 4, pp 221-230
-
(1999)
The TQM Magazine
, vol.11
, Issue.4
, pp. 221-230
-
-
Harrington, H.J.1
-
27
-
-
84866069232
-
-
Luleå university of Technology, ISSN: LTU-FR-05/4-SE
-
Jonsson, J. (2005) Förstudie on produktivitetsfrågor, Luleå university of Technology, ISSN: LTU-FR-05/4-SE
-
(2005)
Förstudie on Produktivitetsfrågor
-
-
Jonsson, J.1
-
28
-
-
58849103778
-
-
FoU-Väst, report 49, Gothenburg, Sweden
-
Josephson, P.-E., and Hammarlund, Y. (1996). Kvalitetsfelkostnader på 90-talet-en studie av sju byggprojekt, FoU-Väst, report 49, Gothenburg, Sweden
-
(1996)
Kvalitetsfelkostnader På 90-talet-en Studie Av Sju Byggprojekt
-
-
Josephson, P.-E.1
Hammarlund, Y.2
-
29
-
-
84866118821
-
-
FoU-Väst report 0507, Gothenburg, Sweden
-
Josephson, P.-E., and Saukkoriipi, L. (2005). Slöseri i byggprojekt-Behov av förändrat synsätt, FoU-Väst report 0507, Gothenburg, Sweden
-
(2005)
Slöseri i Byggprojekt-Behov Av Förändrat Synsätt
-
-
Josephson, P.-E.1
Saukkoriipi, L.2
-
30
-
-
0003656231
-
-
Technical report no. 72, CIFE, Stanford University, Stanford, California, USA
-
Koskela, L. (1992). Application of the new production philosophy to construction, Technical report no. 72, CIFE, Stanford University, Stanford, California, USA
-
(1992)
Application of the New Production Philosophy to Construction
-
-
Koskela, L.1
-
32
-
-
84921224084
-
Business process redesign: Key to competitiveness
-
Knorr, R.O. (1991). "Business Process Redesign: Key to Competitiveness", The Journal of Business Strategy, Vol. 12, No. 6, pp 48-51
-
(1991)
The Journal of Business Strategy
, vol.12
, Issue.6
, pp. 48-51
-
-
Knorr, R.O.1
-
36
-
-
0012259134
-
Identifying waste: Applications of construction process analysis
-
July 1999, Berkeley, USA
-
Lee, S.-H., Diekmann, J. E., Songer, A. D., Brown, H. (1999). Identifying waste: Applications of construction process analysis, Proceedings of IGLC-9, July 1999, Berkeley, USA
-
(1999)
Proceedings of IGLC-9
-
-
Lee, S.-H.1
Diekmann, J.E.2
Songer, A.D.3
Brown, H.4
-
38
-
-
33747617431
-
Cost management and value creation: The missing link
-
McNair, C. J., Polutnik, L. and Silvi, R. (2001). Cost management and value creation: The missing link, The European Accounting Review, Vol. 10, No. 1, pp 33-50
-
(2001)
The European Accounting Review
, vol.10
, Issue.1
, pp. 33-50
-
-
McNair, C.J.1
Polutnik, L.2
Silvi, R.3
-
39
-
-
0003367477
-
-
The Royal Institute of Technology, Construction Management and Economics, Stockholm, Sweden
-
Nylén, K.-O. (1999). Civil Works-Unique projects or a repeatable process? The Royal Institute of Technology, Construction Management and Economics, Stockholm, Sweden
-
(1999)
Civil Works-Unique Projects or A Repeatable Process?
-
-
Nylén, K.-O.1
-
40
-
-
18544395776
-
-
AACE International Transactions, CSC.07
-
Orth, D. L., and Jenkins, J. L. (2003). Mechanical and General Construction Productivity Results, AACE International Transactions, CSC.07, pp 1-5
-
(2003)
Mechanical and General Construction Productivity Results
, pp. 1-5
-
-
Orth, D.L.1
Jenkins, J.L.2
-
42
-
-
84866069236
-
-
SBUF (The Development Fund of the Swedish Construction Industry) 2005. Produktivitetsmätningar som förändringsverktyg, Research project number: 11666
-
SBUF (The Development Fund of the Swedish Construction Industry) 2005. Produktivitetsmätningar som förändringsverktyg, Research project number: 11666
-
-
-
-
43
-
-
0003958050
-
-
Productivity Press, Cambridge, Massachusetts, USA Statistics Sweden, 2003
-
Shingo, S. (1988). Non-stock production: the Shingo system for continuous improvement, Productivity Press, Cambridge, Massachusetts, USA Statistics Sweden, 2003
-
(1988)
Non-stock Production: The Shingo System for Continuous Improvement
-
-
Shingo, S.1
-
44
-
-
84866060671
-
What do construction workers do? Direct observations in housing projects
-
October 2006, Rome, Italy
-
Strandberg, J., and Josephson, P.-E. (2005). What do construction workers do? Direct observations in housing projects, Proceedings of CIB 2006, W065/W055/W086-Construction in the XXI Century: Local and global challenges, October 2006, Rome, Italy
-
(2005)
Proceedings of CIB 2006, W065/W055/W086-Construction in the XXI Century: Local and Global Challenges
-
-
Strandberg, J.1
Josephson, P.-E.2
-
45
-
-
84866077439
-
-
Swedish Construction Federation
-
Swedish Construction Federation (2003). Fakta om byggande
-
(2003)
Fakta Om Byggande
-
-
-
46
-
-
0030145090
-
A technical note on using work sampling to estimate the effort on activities under activity-based costing
-
Tsai, W.-H. (1996) A technical note on using work sampling to estimate the effort on activities under activity-based costing, International Journal of Production Economics, Vol. 43, Issue 1, pp 11-16
-
(1996)
International Journal of Production Economics
, vol.43
, Issue.1
, pp. 11-16
-
-
Tsai, W.-H.1
-
47
-
-
0003986421
-
-
Simon and Schuster, New York, USA
-
Womack, J. P., and Jones, D. T. (1996). Lean thinking, Simon and Schuster, New York, USA
-
(1996)
Lean Thinking
-
-
Womack, J.P.1
Jones, D.T.2
-
48
-
-
0003463029
-
-
Harper Collins, New York, NY, USA
-
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world-the story of lean production, Harper Collins, New York, NY, USA
-
(1990)
The Machine That Changed the World-The Story of Lean Production
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|