메뉴 건너뛰기




Volumn 51, Issue 3, 2013, Pages 869-882

Workload control and order release in two-level multi-stage job shops: An assessment by simulation

Author keywords

controlled order release; multi stage job shop; simulation; workload control (WLC)

Indexed keywords

CONTROLLED ORDER RELEASE; FINAL ASSEMBLY; FLOWTHROUGH; JOB SHOP; LEVEL 2; LEVEL-1; MULTI-STAGE; RELEASE METHODS; SIMPLE STRUCTURES; SIMULATION; SUB-ASSEMBLY; TARDY JOBS; THEORY AND PRACTICE; WORK-IN-PROCESS; WORKLOAD CONTROL;

EID: 84871241829     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.676685     Document Type: Article
Times cited : (16)

References (32)
  • 1
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
    • Adam, N.R., et al., 1993. Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68 (1), 212-227.
    • (1993) European Journal of Operational Research , vol.68 , Issue.1 , pp. 212-227
    • Adam, N.R.1
  • 2
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte, W., 1988. Theory and practise of load-oriented manufacturing control. International Journal of Production Research, 26 (3), 375-395. (Pubitemid 18604815)
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 3
    • 0002479150 scopus 로고
    • Load-oriented manufacturing control just-in-time production for job shops
    • Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning and Control, 5 (3), 292-307.
    • (1994) Production Planning and Control , vol.5 , Issue.3 , pp. 292-307
    • Bechte, W.1
  • 6
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly shops
    • Bertrand, J.W.M. and van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly shops. Production Planning and Control, 13 (7), 639-648.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 639-648
    • Bertrand, J.W.M.1    Van De Wakker, A.M.2
  • 8
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck workloads
    • Enns, S.T. and Prongue Costa, M., 2002. The effectiveness of input control based on aggregate versus bottleneck workloads. Production Planning and Control, 13 (7), 614-624.
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Prongue Costa, M.2
  • 10
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • DOI 10.1109/66.4371
    • Glassey, C.R. and Resende, M.G., 1988. Closed-loop job release control for VLSI circuit manufacturing. IEEE Transactions on Semiconductor Manufacturing, 1 (1), 36-46. (Pubitemid 18612167)
    • (1988) IEEE Trans Semicond Manuf , vol.1 , Issue.1 , pp. 36-46
    • Glassey, C.R.1    Resende Mauricio, G.C.2
  • 13
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry, L.C. and Wong, S.K., 1994. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32 (12), 2827-2842.
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 14
    • 38749152402 scopus 로고    scopus 로고
    • Investigating implementation issues for workload control (WLC): A comparative case study analysis
    • Hendry, L.C., et al., 2008. Investigating implementation issues for workload control (WLC): a comparative case study analysis. International Journal of Production Economics, 112 (1), 452-469.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 452-469
    • Hendry, L.C.1
  • 15
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman, B.G., Tatsiopoulos, I.P., and Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40 (2), 196-209.
    • (1989) European Journal of Operational Research , vol.40 , Issue.2 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 16
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • PII S0925527398000528
    • Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: improving the release method. International Journal of Production Economics, 56-57, 347-364. (Pubitemid 128400955)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 17
    • 78649822911 scopus 로고    scopus 로고
    • Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
    • Lu, H.L., Huang, G.Q., and Yang, H.D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49 (3), 647-669.
    • (2011) International Journal of Production Research , vol.49 , Issue.3 , pp. 647-669
    • Lu, H.L.1    Huang, G.Q.2    Yang, H.D.3
  • 19
    • 84987013915 scopus 로고
    • An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters
    • Melnyk, S.A., et al., 1994. An experimental model for investigating the sensitivity of job shop performance to job release time distribution parameters. Production and Operations Management, 3 (1), 64-74.
    • (1994) Production and Operations Management , vol.3 , Issue.1 , pp. 64-74
    • Melnyk, S.A.1
  • 21
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P.R., Malhotra, M.K., and Jensen, J.B., 1993. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences, 24 (6), 1109-1133.
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 22
    • 0034691918 scopus 로고    scopus 로고
    • ISTS: A new procedure for the integrated scheduling of multi-stage systems
    • Portioli-Staudacher, A., 2000. ISTS: a new procedure for the integrated scheduling of multi-stage systems. International Journal of Production Research, 38 (11), 2489-2514.
    • (2000) International Journal of Production Research , vol.38 , Issue.11 , pp. 2489-2514
    • Portioli-Staudacher, A.1
  • 25
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • DOI 10.1016/j.dss.2005.08.001, PII S0167923605001119
    • Silva, C., Roque, L., and Almeida, A., 2006. MAPP: a web-based decision support system for the mould industry. Decision Support Systems, 42 (2), 999-1014. (Pubitemid 44537479)
    • (2006) Decision Support Systems , vol.42 , Issue.2 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 26
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33 (9), 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 27
    • 41849149287 scopus 로고    scopus 로고
    • Theoretical development of a workload control methodology: Evidence from two case studies
    • DOI 10.1080/00207540601039791, PII 771200955
    • Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131. (Pubitemid 351499535)
    • (2008) International Journal of Production Research , vol.46 , Issue.11 , pp. 3107-3131
    • Stevenson, M.1    Silva, C.2
  • 28
    • 79954418061 scopus 로고    scopus 로고
    • The theory and practice of workload control: A research agenda and implementation strategy
    • Stevenson, M., et al., 2011. The theory and practice of workload control: a research agenda and implementation strategy. International Journal of Production Economics, 131 (2), 689-700.
    • (2011) International Journal of Production Economics , vol.131 , Issue.2 , pp. 689-700
    • Stevenson, M.1
  • 30
    • 84855789582 scopus 로고    scopus 로고
    • Three decades of workload control research: A systematic review of the literature
    • Thürer, M., Stevenson, M., and Silva, C., 2011. Three decades of workload control research: a systematic review of the literature. International Journal of Production Research, 49 (23), 6905-6935.
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 6905-6935
    • Thürer, M.1    Stevenson, M.2    Silva, C.3
  • 31
    • 84867085910 scopus 로고    scopus 로고
    • The application of workload control in assembly job shops: An assessment by simulation
    • in press DOI: 10.1080/00207543.2011.631600
    • Thürer, M., et al., in press. The application of workload control in assembly job shops: an assessment by simulation. International Journal of Production Research. DOI: 10.1080/00207543.2011.631600.
    • International Journal of Production Research
    • Thürer, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.