-
1
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
-
Adam, N. R., Bertrand, J. W. M., Morehead, D. C., and Surkis, J., 1993, Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68(1), 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, Issue.1
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
2
-
-
0003067640
-
An investigation of due date assignment rules with constrained tightness
-
Baker, K. R., and Bertrand,J. W. M., 1981, An investigation of due date assignment rules with constrained tightness. Journal of Operations Management, 1(3), 109-120.
-
(1981)
Journal of Operations Management
, vol.1
, Issue.3
, pp. 109-120
-
-
Baker, K.R.1
Bertrand, J.W.M.2
-
3
-
-
0031078124
-
Order review and release strategies in a job shop environment: A review and a classification
-
Bergamaschi, D., Cigolini, R., Perona, M., and Portioli, A., 1997, Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research, 35(2), 399-420.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.2
, pp. 399-420
-
-
Bergamaschi, D.1
Cigolini, R.2
Perona, M.3
Portioli, A.4
-
4
-
-
0026141922
-
Flow rate flexibility in complex production departments
-
Bertrand, J. W. M., and Ooijen, Van, H. P. G., 1991, Flow rate flexibility in complex production departments. International Journal of Production Research, 29(4), 713-724.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 713-724
-
-
Bertrand, J.W.M.1
Ooijen2
Van, H.P.G.3
-
5
-
-
0032142734
-
Minimizing production flow time in a process and assembly job shop
-
Cummings McKoy, D. H., and Egbelu, P. J., 1998, Minimizing production flow time in a process and assembly job shop. International Journal of Production Research, 36(8), 2315-2333.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.8
, pp. 2315-2332
-
-
Cummings McKoy, D.H.1
Egbelu, P.J.2
-
6
-
-
0027608514
-
Scheduling for machining and assembly n a job-shop environment
-
Doctor, S. R., Cavalier, T. M., and Egbelu, P. J., 1993, Scheduling for machining and assembly n a job-shop environment. International Journal of Production Research, 31(6), 1275-1297.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.6
, pp. 1275-1297
-
-
Doctor, S.R.1
Cavalier, T.M.2
Egbelu, P.J.3
-
7
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S., and Chowdhury, I. G., 1967, Due dates in job shop scheduling. International Journal of Production Research, 14(2), 223-237.
-
(1967)
International Journal of Production Research
, vol.14
, Issue.2
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
8
-
-
0000538802
-
Job lead time requirements under condition of controlled delivery performance
-
Enns, S. T. VAN, 1994, Job lead time requirements under condition of controlled delivery performance. European Journal of Operational Research, 27(3), 419-439.
-
(1994)
European Journal of Operational Research
, vol.27
, Issue.3
, pp. 419-439
-
-
Enns, S.T.V.1
-
9
-
-
0024641735
-
The effects of product structure and sequencing rules on assembly job performance
-
Fry, T. D., Cliff, M. D., Minor, E. D., and Leong, G. K., 1989(a), The effects of product structure and sequencing rules on assembly job performance. International Journal of Production Research, 27(4), 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.4
, pp. 671-686
-
-
Fry, T.D.1
Cliff, M.D.2
Minor, E.D.3
Leong, G.K.4
-
10
-
-
0024680497
-
Due date assignment in a multi-stage job shop
-
Fry, T. D., Philipoon, P. R., and Markland, R. E., 1989(b), Due date assignment in a multi-stage job shop. IEE Transactions, 21(2), 153-161.
-
(1989)
IEE Transactions
, vol.21
, Issue.2
, pp. 153-161
-
-
Fry, T.D.1
Philipoon, P.R.2
Markland, R.E.3
-
11
-
-
0012298197
-
Priority dispatching with operation due-dates in a job shop
-
Kanet,J.J., and Hayya,J. C., 1982, Priority dispatching with operation due-dates in a job shop. Journal of Operation Management, 2, 155-163,
-
(1982)
Journal of Operation Management
, vol.2
, pp. 155-163
-
-
Kanet, J.J.1
Hayya, J.C.2
-
12
-
-
0004146861
-
Priority dispatching and assembly operation in a job shop
-
Memorandom, RM-5370-PR, Rand Corporation
-
Maxwell, W. L., 1969, Priority dispatching and assembly operation in a job shop. Memorandom, RM-5370-PR, Rand Corporation.
-
(1969)
-
-
Maxwell, W.L.1
-
13
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
Maxwell, W. L., and Mehra, M., 1968, Multiple-Factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
14
-
-
0026243199
-
Controlling different flow rates in job shop like production departments
-
Ooijen, H. P. G. VAN, 1991, Controlling different flow rates in job shop like production departments. International Journal of Production Economics, 23(1-3), 239-249.
-
(1991)
International Journal of Production Economics
, vol.23
, Issue.1-3
, pp. 239-249
-
-
Ooijen H.P.G. VAN1
-
15
-
-
0026140380
-
A preliminary investigation of multi-attribute bases sequencing rules for assembly shops
-
Philipoon, P. R., Russell, R. S., and Fry, T. D., 1991, A preliminary investigation of multi-attribute bases sequencing rules for assembly shops. International Journal of Production Research, 29(4), 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.4
, pp. 739-753
-
-
Philipoon, P.R.1
Russell, R.S.2
Fry, T.D.3
-
16
-
-
0003831155
-
An investigation of job shop scheduling for jobs with assembly constraints
-
Unpublished PhD dissertation, Cornell University
-
Siegel, G. B., 1971, An investigation of job shop scheduling for jobs with assembly constraints. Unpublished PhD dissertation, Cornell University.
-
(1971)
-
-
Siegel, G.B.1
|