메뉴 건너뛰기




Volumn 38, Issue 11, 2000, Pages 2489-2514

ISTS: A new procedure for the integrated scheduling of multi-stage systems

Author keywords

[No Author keywords available]

Indexed keywords

ASSEMBLY; MACHINE COMPONENTS; MACHINING; PLANNING; PRODUCTION CONTROL;

EID: 0034691918     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540050031887     Document Type: Article
Times cited : (15)

References (30)
  • 1
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly job shops
    • Adam, N., Bertrand, J. and Surkis, J 1987, Priority assignment procedures in multi-level assembly job shops. IIE Transactions, 9, 317-328.
    • (1987) IIE Transactions , vol.9 , pp. 317-328
    • Adam, N.1    Bertrand, J.2    Surkis, J.3
  • 3
    • 0023979312 scopus 로고
    • Theory and practice of load oriented manufacturing control
    • Bechte, W., 1988, Theory and practice of load oriented manufacturing control. International Journal of Production Research, 26, 375-395.
    • (1988) International Journal of Production Research , vol.26 , pp. 375-395
    • Bechte, W.1
  • 7
    • 0032205531 scopus 로고    scopus 로고
    • Comparison of order review and release techniques in a dynamic and uncertain job shop environment
    • Cigolini, R., Perona, M. and Portioli, A., 1998, Comparison of order review and release techniques in a dynamic and uncertain job shop environment. International Journal of Production Research, 36, 2931-2951.
    • (1998) International Journal of Production Research , vol.36 , pp. 2931-2951
    • Cigolini, R.1    Perona, M.2    Portioli, A.3
  • 10
  • 11
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, R. J., 1989, A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems. International Journal of Production Research, 27, 637-670.
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 12
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J. and Goodwin, J., Jr., 1982, Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
    • (1982) Decision Sciences , vol.13 , pp. 585-603
    • Goodwin, J.1    Goodwin, J.2
  • 14
    • 0001641797 scopus 로고
    • Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems
    • Ho, C., 1995, Examining the impact of demand lumpiness on the lot-sizing performance in MRP systems. International Journal of Production Research, 33, 2579-2599.
    • (1995) International Journal of Production Research , vol.33 , pp. 2579-2599
    • Ho, C.1
  • 15
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho, C. and Carter, P. L., 1996, An investigation of alternative dampening procedures to cope with MRP system nervousness. International Journal of Production Research, 34, 137-156.
    • (1996) International Journal of Production Research , vol.34 , pp. 137-156
    • Ho, C.1    Carter, P.L.2
  • 16
    • 0011757454 scopus 로고
    • Criteria for selecting a production control philosophy
    • Larsen, N. and Alting, L., 1993, Criteria for selecting a production control philosophy. Production Planning and Control, 4, 54-68.
    • (1993) Production Planning and Control , vol.4 , pp. 54-68
    • Larsen, N.1    Alting, L.2
  • 17
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W. and Mehra, M., 1968, Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , pp. 241-254
    • Maxwell, W.1    Mehra, M.2
  • 20
    • 0029732560 scopus 로고    scopus 로고
    • An enhanced loading model for the probabilistic workload control under workload unbalancement
    • Perona, M. and Portioli, A., 1996, An enhanced loading model for the probabilistic workload control under workload unbalancement. Production Planning and Control, 7, 6878.
    • (1996) Production Planning and Control , vol.7 , pp. 6878
    • Perona, M.1    Portioli, A.2
  • 21
    • 0032118511 scopus 로고    scopus 로고
    • The impact of parameters setting in load oriented manufacturing control
    • Perona, M. and Portioli, A., 1998, The impact of parameters setting in load oriented manufacturing control. International Journal of Production Economics, 55, 133-142.
    • (1998) International Journal of Production Economics , vol.55 , pp. 133-142
    • Perona, M.1    Portioli, A.2
  • 22
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoom, P., Russel, R. and Fry, T., 1991, A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
    • (1991) International Journal of Production Research , vol.29 , pp. 739-753
    • Philipoom, P.1    Russel, R.2    Fry, T.3
  • 23
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignation of due-dates in assembly shop based in simulation
    • Roman, D. B. and del Valle, A. G., 1996, Dynamic assignation of due-dates in assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
    • (1996) International Journal of Production Research , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Del Valle, A.G.2
  • 24
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for assembly shops
    • Russel, R, and Taylor, III B., 1985, An evaluation of sequencing rules for assembly shops. Decision Sciences, 16, 196-212.
    • (1985) Decision Sciences , vol.16 , pp. 196-212
    • Russel, R.1    Taylor, B.2
  • 25
    • 0024748621 scopus 로고
    • The performance of push and pull systems: A simulation and comparative study
    • Sarker, B. R. and Fitzsimmons, J. A., 1989, The performance of push and pull systems: a simulation and comparative study. International Journal of Production Research, 27, 1715-1731.
    • (1989) International Journal of Production Research , vol.27 , pp. 1715-1731
    • Sarker, B.R.1    Fitzsimmons, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.