-
1
-
-
0024944070
-
Single machine flow-time scheduling with a single breakdown
-
Adiri, I., J. Bruno, E. Frostig, and A. H. G. Rinnooy Kan, "Single machine flow-time scheduling with a single breakdown," Acta Informatica, 26, 679-696 (1989).
-
(1989)
Acta Informatica
, vol.26
, pp. 679-696
-
-
Adiri, I.1
Bruno, J.2
Frostig, E.3
Rinnooy Kan, A.H.G.4
-
3
-
-
24144491827
-
A GRASP for aircraft routing in response to groundings and delays
-
Arguello, M. F., J. F. Bard, and G. Yu, "A GRASP for aircraft routing in response to groundings and delays," Journal on Combinatorial Optimization 5, 211-228 (1997).
-
(1997)
Journal on Combinatorial Optimization
, vol.5
, pp. 211-228
-
-
Arguello, M.F.1
Bard, J.F.2
Yu, G.3
-
4
-
-
1542631621
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
to appear
-
Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy, "Executing production schedules in the face of uncertainties: a review and some future directions," to appear in European Journal of Operational Research (2002).
-
(2002)
European Journal of Operational Research
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
5
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
Bean, J. C., J. R. Birge, J. Mittenthal, and C.E. Noon, "Matchup scheduling with multiple resources, release dates and disruptions," Operations Research, 39, 470-483 (1991).
-
(1991)
Operations Research
, vol.39
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
6
-
-
0024135864
-
Assessing the effects of machine breakdowns in stochastic scheduling
-
Birge, J. and K. D. Glazebrook, "Assessing the effects of machine breakdowns in stochastic scheduling," Operations Research Letters, 7, 267-271 (1988).
-
(1988)
Operations Research Letters
, vol.7
, pp. 267-271
-
-
Birge, J.1
Glazebrook, K.D.2
-
7
-
-
0025498911
-
Single-machine scheduling subject to stochastic breakdowns
-
Birge, J., J. B. G. Frenk, J. Mittenthal, and A. H. G. Rinnooy Kan, "Single-machine scheduling subject to stochastic breakdowns," Naval Research Logistics, 37, 661-677 (1990).
-
(1990)
Naval Research Logistics
, vol.37
, pp. 661-677
-
-
Birge, J.1
Frenk, J.B.G.2
Mittenthal, J.3
Rinnooy Kan, A.H.G.4
-
8
-
-
0004048738
-
-
Springer-Verlag, Berlin
-
Blazewicz J., K. Ecker, G. Schmidt, and J. Weglarz, Scheduling Computer and Manufacturing Processes, 2nd Edition, Springer-Verlag, Berlin (2001).
-
(2001)
Scheduling Computer and Manufacturing Processes, 2nd Edition
-
-
Blazewicz, J.1
Ecker, K.2
Schmidt, G.3
Weglarz, J.4
-
10
-
-
0027912254
-
Complexity of single machine, multi-criteria scheduling problems
-
Chen, C. -L. and R. L. Bulfin, "Complexity of single machine, multi-criteria scheduling problems," European Journal of Operational Research, 70, 115-125 (1993).
-
(1993)
European Journal of Operational Research
, vol.70
, pp. 115-125
-
-
Chen, C.L.1
Bulfin, R.L.2
-
11
-
-
1842782745
-
Disruption management
-
Clausen, J. J., J. Hansen, J. Larsen, and A. Larsen, "Disruption management," ORMS Today, 28, 40-43 (2001).
-
(2001)
ORMS Today
, vol.28
, pp. 40-43
-
-
Clausen, J.J.1
Hansen, J.2
Larsen, J.3
Larsen, A.4
-
12
-
-
84974201117
-
A note on stochastic scheduling on a single machine scheduling subject to breakdown-the preemptive repeat model
-
Frostig, E., "A note on stochastic scheduling on a single machine scheduling subject to breakdown-the preemptive repeat model," Probability in the Engineering and Informational Sciences, 5, pp. 349-354 (1991).
-
(1991)
Probability in the Engineering and Informational Sciences
, vol.5
, pp. 349-354
-
-
Frostig, E.1
-
14
-
-
0023367406
-
Evaluating the effects of machine breakdowns in stochastic scheduling problems
-
Glazebrook, K. D., "Evaluating the effects of machine breakdowns in stochastic scheduling problems," Naval Research Logistics, 34, 319-335 (1987).
-
(1987)
Naval Research Logistics
, vol.34
, pp. 319-335
-
-
Glazebrook, K.D.1
-
15
-
-
1642448328
-
An iterative goal-programming procedure for operational recovery problems
-
Golany, B., Y. Xia, J. Yang, and G. Yu, "An iterative goal-programming procedure for operational recovery problems," Journal of Optimization and Engineering, 3, 109-127 (2002).
-
(2002)
Journal of Optimization and Engineering
, vol.3
, pp. 109-127
-
-
Golany, B.1
Xia, Y.2
Yang, J.3
Yu, G.4
-
16
-
-
0032671338
-
Scheduling maintenance and semiresumable jobs on a single machine
-
Graves, G. H. and C. -Y. Lee, "Scheduling maintenance and semiresumable jobs on a single machine," Naval Research Logistics, 46, 845-863 (1999).
-
(1999)
Naval Research Logistics
, vol.46
, pp. 845-863
-
-
Graves, G.H.1
Lee, C.Y.2
-
17
-
-
0035019837
-
Scheduling with fixed delivery dates
-
Hall, N. G., M. A. Lesaoana, and C. N. Potts, "Scheduling with fixed delivery dates," Operations Research, 49, 134-144 (2001).
-
(2001)
Operations Research
, vol.49
, pp. 134-144
-
-
Hall, N.G.1
Lesaoana, M.A.2
Potts, C.N.3
-
18
-
-
2342539189
-
Supply chain scheduling: Batching and delivery
-
Hall, N. G. and C. N. Potts, "Supply Chain Scheduling: Batching and Delivery," Operations Research, 51, 385-407 (2003).
-
(2003)
Operations Research
, vol.51
, pp. 385-407
-
-
Hall, N.G.1
Potts, C.N.2
-
19
-
-
0346234066
-
Flow-shop problems with transportation times and a single robot
-
Preprints 1998, Universitat Osnabruck
-
Hurink, J. and S. Knust, "Flow-shop problems with transportation times and a single robot," Preprints 1998, Fachbereich Mathematik/Informatik, Universitat Osnabruck (1998).
-
(1998)
Fachbereich Mathematik/Informatik
-
-
Hurink, J.1
Knust, S.2
-
20
-
-
0027646865
-
A decision support framework for airline flight cancellations and delays
-
Jarrah, A. I. Z., G. Yu, N. Krishuamurthy, and A. Rakshit, "A decision support framework for airline flight cancellations and delays," Transportation Science, 27, 266-280 (1993).
-
(1993)
Transportation Science
, vol.27
, pp. 266-280
-
-
Jarrah, A.I.Z.1
Yu, G.2
Krishuamurthy, N.3
Rakshit, A.4
-
21
-
-
0024731859
-
A solution to the multiple set-up problem with dynamic demand
-
Lee, C.-Y., "A Solution to the Multiple Set-Up Problem with Dynamic Demand," IIE Transactions, 21, 266-270 (1989).
-
(1989)
IIE Transactions
, vol.21
, pp. 266-270
-
-
Lee, C.-Y.1
-
22
-
-
84944560904
-
Machine scheduling with availability constraints
-
Joseph Leung (Ed.), CRC Press
-
Lee, C.-Y., "Machine Scheduling with Availability Constraints, " in Handbook of Scheduling: Algorithms, Models, and Performance Analysis, Joseph Leung (Ed.), CRC Press 22.1-22.13 (2004).
-
(2004)
Handbook of Scheduling: Algorithms, Models, and Performance Analysis
-
-
Lee, C.-Y.1
-
23
-
-
0344427189
-
Machine scheduling with transportation considerations
-
Lee, C. -Y. and Z. L. Chen, "Machine scheduling with transportation considerations," Journal of Scheduling, 4, 3-24 (2001).
-
(2001)
Journal of Scheduling
, vol.4
, pp. 3-24
-
-
Lee, C.Y.1
Chen, Z.L.2
-
24
-
-
0035900864
-
Machine scheduling with maintenance and repair rate-modifying activities
-
Lee, C. -Y. and C. -S. Lin, "Machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, 135, 491-513 (2001).
-
(2001)
European Journal of Operational Research
, vol.135
, pp. 491-513
-
-
Lee, C.Y.1
Lin, C.S.2
-
25
-
-
0026818026
-
On scheduling with ready-times, due-dates and vacations
-
Leon, V. J. and S. D. Wu, "On scheduling with ready-times, due-dates and vacations," Naval Res. Logist. 39, 53-65 (1992).
-
(1992)
Naval Res. Logist.
, vol.39
, pp. 53-65
-
-
Leon, V.J.1
Wu, S.D.2
-
26
-
-
0028452692
-
A game-theoretic control approach for job shops in the presence of disruption
-
Leon, V. J., S. D. Wu, and R. H. Storer, "A game-theoretic control approach for job shops in the presence of disruption," International Journal of Production Research, 32, 1451-1476 (1994).
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1451-1476
-
-
Leon, V.J.1
Wu, S.D.2
Storer, R.H.3
-
27
-
-
0031275839
-
On the airline schedule perturbation problem caused by the ground delay program
-
Luo, S. and G. Yu, "On the airline schedule perturbation problem caused by the ground delay program," Transportation Science, 31, 298-311 (1997).
-
(1997)
Transportation Science
, vol.31
, pp. 298-311
-
-
Luo, S.1
Yu, G.2
-
28
-
-
0003438602
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Pinedo, M. L., Scheduling: Theory, Algorithms and Systems, 2nd Edition, Prentice-Hall, Englewood Cliffs, NJ (2002).
-
(2002)
Scheduling: Theory, Algorithms and Systems, 2nd Edition
-
-
Pinedo, M.L.1
-
30
-
-
0033446820
-
Scheduling the maintenance on a single machine
-
Qi, X., T. Chen, and F. Tu, "Scheduling the maintenance on a single machine," Journal of the Operational Research Society, 50, 1071-1078 (1999).
-
(1999)
Journal of the Operational Research Society
, vol.50
, pp. 1071-1078
-
-
Qi, X.1
Chen, T.2
Tu, F.3
-
32
-
-
30344468290
-
Fab-wide control and disruption management in high-volume semiconductor manufacturing
-
Qin, S. Z. and G. Yu, "Fab-wide control and disruption management in high-volume semiconductor manufacturing," NSF Grant 04-532 (2004).
-
(2004)
NSF Grant
, vol.4
, Issue.532
-
-
Qin, S.Z.1
Yu, G.2
-
34
-
-
0021375239
-
Optimal dispatching strategy on an airline network after a schedule perturbation
-
Teodorovic, D. and S. Guberinic, "Optimal dispatching strategy on an airline network after a schedule perturbation," European Journal of Operational Research, 15, 178-182 (1984).
-
(1984)
European Journal of Operational Research
, vol.15
, pp. 178-182
-
-
Teodorovic, D.1
Guberinic, S.2
-
35
-
-
0034149008
-
Balancing user preferences for aircraft recovery during airline irregular operations
-
Thengvall, B., J. F. Bard, and G. Yu, "Balancing user preferences for aircraft recovery during airline irregular operations," IIE Transaction, 32, 181-193 (2000).
-
(2000)
IIE Transaction
, vol.32
, pp. 181-193
-
-
Thengvall, B.1
Bard, J.F.2
Yu, G.3
-
36
-
-
20944440587
-
Trial by fire: A blaze in albuquerque sets off major crisis
-
1/29/2001
-
"Trial by Fire: A Blaze in Albuquerque Sets Off Major Crisis," The Wall Street Journal, 1/29/2001, Page A1.
-
The Wall Street Journal
-
-
-
37
-
-
0031525145
-
Rescheduling on a single machine with part-type dependent setup times and deadlines
-
Unal, A. T., R. Uzsoy, and A. S. Kiran, "Rescheduling on a single machine with part-type dependent setup times and deadlines," Annals of Operations Research, 70, 93-113 (1997).
-
(1997)
Annals of Operations Research
, vol.70
, pp. 93-113
-
-
Unal, A.T.1
Uzsoy, R.2
Kiran, A.S.3
-
38
-
-
30344464541
-
Rescheduling manufacturing systems: A framework of strategies policies, and methods
-
The Institute of Systems Research, The University of Maryland
-
Vieira, G. E., J. Herrmann, and E. Lin, "Rescheduling manufacturing systems: a framework of strategies policies, and methods," Working Paper, The Institute of Systems Research, The University of Maryland (2002).
-
(2002)
Working Paper
-
-
Vieira, G.E.1
Herrmann, J.2
Lin, E.3
-
39
-
-
0030409893
-
A decision support framework for handling schedule perturbations
-
Yan, S. and D. Yang, "A decision support framework for handling schedule perturbations," Transportation Research - Part B: Method-ology, 30, 405-419 (1996).
-
(1996)
Transportation Research - Part B: Method-ology
, vol.30
, pp. 405-419
-
-
Yan, S.1
Yang, D.2
-
40
-
-
0037251369
-
A new era for crew recovery at continental airlines
-
Yu, G., M. Arguello, S. McCowan, M. Song, and A. White, "A new era for crew recovery at continental airlines," Interfaces, 33, 5-22 (2003).
-
(2003)
Interfaces
, vol.33
, pp. 5-22
-
-
Yu, G.1
Arguello, M.2
McCowan, S.3
Song, M.4
White, A.5
|