메뉴 건너뛰기




Volumn 52, Issue 3, 2004, Pages

Rescheduling for new orders

Author keywords

Deterministic; Production scheduling: sequencing; Single machine

Indexed keywords

PRODUCTION/SCHEDULING:SEQUENCING, DETERMINISTIC, SINGLE MACHINE; RESCHEDULING; SCHEDULING PROBLEMS;

EID: 19744366708     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.1030.0101     Document Type: Article
Times cited : (155)

References (25)
  • 1
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • Bean, J. C., J. R. Birge, J. Mittenthal, C. E. Noon. 1991. Matchup scheduling with multiple resources, release dates and disruptions. Oper. Res. 39 470-483.
    • (1991) Oper. Res. , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 4
    • 0000522889 scopus 로고
    • Analysis of periodic and event-driven rescheduling policies in dynamic shops
    • Church, L. K., R. Uzsoy. 1992. Analysis of periodic and event-driven rescheduling policies in dynamic shops. Internat. J. Comput.-Integrated Manufacturing 5 153-163.
    • (1992) Internat. J. Comput.-integrated Manufacturing , vol.5 , pp. 153-163
    • Church, L.K.1    Uzsoy, R.2
  • 6
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • Daniels, R. L., P. Kouvelis. 1995. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Sci. 41 363-376.
    • (1995) Management Sci. , vol.41 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 7
    • 10844247641 scopus 로고
    • Flexible assembly systems: Near realtime scheduling of multiple products
    • Department of Industrial Engineering and Operations Research, University of Massachusetts, Amherst, MA
    • Donath, M., R. J. Graves. 1985. Flexible assembly systems: Near realtime scheduling of multiple products. Technical report, Department of Industrial Engineering and Operations Research, University of Massachusetts, Amherst, MA.
    • (1985) Technical Report
    • Donath, M.1    Graves, R.J.2
  • 9
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • Garey, M. R., R. E. Tarjan, G. T. Wilfong. 1988. One-processor scheduling with symmetric earliness and tardiness penalties. Math. Oper. Res. 13 330-348.
    • (1988) Math. Oper. Res. , vol.13 , pp. 330-348
    • Garey, M.R.1    Tarjan, R.E.2    Wilfong, G.T.3
  • 10
  • 11
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic machine scheduling: A survey
    • Graham, R. L., E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan. 1979. Optimization and approximation in deterministic machine scheduling: A survey. Ann. Discrete Math. S 287-326.
    • (1979) Ann. Discrete Math. S , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Kan, A.H.G.R.4
  • 12
    • 0042182628 scopus 로고
    • Scheduling a production line to minimize maximum tardiness
    • Management Science Research Project, University of California, Los Angeles, CA
    • Jackson, J. R. 1955. Scheduling a production line to minimize maximum tardiness. Research report 43, Management Science Research Project, University of California, Los Angeles, CA.
    • (1955) Research Report , vol.43
    • Jackson, J.R.1
  • 13
    • 0030786875 scopus 로고    scopus 로고
    • Production scheduling/rescheduling in flexible manufacturing
    • Jain, A. K., H. A. Elmaraghy. 1997. Production scheduling/rescheduling in flexible manufacturing. Internat. J. Production Res. 35 281-309.
    • (1997) Internat. J. Production Res. , vol.35 , pp. 281-309
    • Jain, A.K.1    Elmaraghy, H.A.2
  • 14
    • 0034976639 scopus 로고    scopus 로고
    • Single machine scheduling with release times, deadlines and tardiness objectives
    • Koulamas, C., G. J. Kyparisis. 2001. Single machine scheduling with release times, deadlines and tardiness objectives. Eur. J. Oper. Res. 133 447-453.
    • (2001) Eur. J. Oper. Res. , vol.133 , pp. 447-453
    • Koulamas, C.1    Kyparisis, G.J.2
  • 15
    • 0002719797 scopus 로고
    • The Hungarian method for the assignment problem
    • Kuhn, H. W. 1955. The Hungarian method for the assignment problem. Naval Res. Logist. Quart. 2 83-97.
    • (1955) Naval Res. Logist. Quart. , vol.2 , pp. 83-97
    • Kuhn, H.W.1
  • 16
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • Li, R., Y. Shyu, S. Adiga. 1993. A heuristic rescheduling algorithm for computer-based production scheduling systems. Internat. J. Production Res. 31 1815-1826.
    • (1993) Internat. J. Production Res. , vol.31 , pp. 1815-1826
    • Li, R.1    Shyu, Y.2    Adiga, S.3
  • 18
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan, R., R. Uzsoy, K. N. McKay. 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. Internat. J. Production Res. 37 4217-4233.
    • (1999) Internat. J. Production Res. , vol.37 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 20
    • 38249023160 scopus 로고
    • Due date based scheduling in a general flexible manufacturing system
    • Raman, N., F. B. Talbot, R. V. Rachamadugu. 1989. Due date based scheduling in a general flexible manufacturing system. J. Oper. Management 8 115-132.
    • (1989) J. Oper. Management , vol.8 , pp. 115-132
    • Raman, N.1    Talbot, F.B.2    Rachamadugu, R.V.3
  • 21
    • 0002066821 scopus 로고
    • Various optimizers for single-stage production
    • Smith, W. E. 1956. Various optimizers for single-stage production. Naval Res. Logist. Quart. 3 59-66.
    • (1956) Naval Res. Logist. Quart. , vol.3 , pp. 59-66
    • Smith, W.E.1
  • 22
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type dependent setup times and deadlines
    • Unal, A. T., R. Uzsoy, A. S. Kiran. 1997. Rescheduling on a single machine with part-type dependent setup times and deadlines. Ann. Oper. Res. 70 93-113.
    • (1997) Ann. Oper. Res. , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiran, A.S.3
  • 23
    • 0042156822 scopus 로고
    • A rescheduling procedure for manufacturing systems under random disruptions
    • G. Fandel, T. Gulledge, A. Jones, eds. Springer, Berlin, Germany
    • Wu, S. D., R. H. Storer, P.-C. Chang. 1992. A rescheduling procedure for manufacturing systems under random disruptions. G. Fandel, T. Gulledge, A. Jones, eds. New Directions for Operations Research in Manufacturing. Springer, Berlin, Germany, 292-308.
    • (1992) New Directions for Operations Research in Manufacturing , pp. 292-308
    • Wu, S.D.1    Storer, R.H.2    Chang, P.-C.3
  • 24
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S. D., R. H. Storer, P.-C. Chang. 1993. One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20 1-14.
    • (1993) Comput. Oper. Res. , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.-C.3
  • 25
    • 0031079410 scopus 로고    scopus 로고
    • Robust deterministic scheduling in stochastic environments: The method of capacity hedge points
    • Yellig, E. J., G. T. Mackulak. 1997. Robust deterministic scheduling in stochastic environments: The method of capacity hedge points. Internat. J. Production Res. 35 369-379.
    • (1997) Internat. J. Production Res. , vol.35 , pp. 369-379
    • Yellig, E.J.1    Mackulak, G.T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.