-
1
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
Bean, J. C., J. R. Birge, J. Mittenthal, C. E. Noon. 1991. Matchup scheduling with multiple resources, release dates and disruptions. Oper. Res. 39 470-483.
-
(1991)
Oper. Res.
, vol.39
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
3
-
-
0012331828
-
Experimental investigation of quasi-realtime scheduling on flexible manufacturing systems
-
Ann Arbor, MI
-
Chang, Y.-L., R. S. Sullivan, U. Bagchi. 1984. Experimental investigation of quasi-realtime scheduling on flexible manufacturing systems. Proc. First ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems, Ann Arbor, MI, 307-312.
-
(1984)
Proc. First ORSA/TIMS Special Interest Conf. on Flexible Manufacturing Systems
, pp. 307-312
-
-
Chang, Y.-L.1
Sullivan, R.S.2
Bagchi, U.3
-
4
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
Church, L. K., R. Uzsoy. 1992. Analysis of periodic and event-driven rescheduling policies in dynamic shops. Internat. J. Comput.-Integrated Manufacturing 5 153-163.
-
(1992)
Internat. J. Comput.-integrated Manufacturing
, vol.5
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
5
-
-
0004113622
-
-
Addison-Wesley, Reading, MA
-
Conway, R. W., W. L. Maxwell, L. W. Miller. 1967. Theory of Scheduling. Addison-Wesley, Reading, MA.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
6
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels, R. L., P. Kouvelis. 1995. Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Sci. 41 363-376.
-
(1995)
Management Sci.
, vol.41
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
7
-
-
10844247641
-
Flexible assembly systems: Near realtime scheduling of multiple products
-
Department of Industrial Engineering and Operations Research, University of Massachusetts, Amherst, MA
-
Donath, M., R. J. Graves. 1985. Flexible assembly systems: Near realtime scheduling of multiple products. Technical report, Department of Industrial Engineering and Operations Research, University of Massachusetts, Amherst, MA.
-
(1985)
Technical Report
-
-
Donath, M.1
Graves, R.J.2
-
9
-
-
0024010206
-
One-processor scheduling with symmetric earliness and tardiness penalties
-
Garey, M. R., R. E. Tarjan, G. T. Wilfong. 1988. One-processor scheduling with symmetric earliness and tardiness penalties. Math. Oper. Res. 13 330-348.
-
(1988)
Math. Oper. Res.
, vol.13
, pp. 330-348
-
-
Garey, M.R.1
Tarjan, R.E.2
Wilfong, G.T.3
-
10
-
-
0002941819
-
A hierarchical framework for discrete event scheduling in manufacturing systems
-
P. Varaiya, A. B. Kurzhanski, eds., Springer-Verlag, Berlin, Germany
-
Gershwin, S. B. 1987. A hierarchical framework for discrete event scheduling in manufacturing systems. P. Varaiya, A. B. Kurzhanski, eds. Lecture Notes in Control and Information Systems 103: Discrete Event Systems: Models and Applications, Springer-Verlag, Berlin, Germany, 197-216.
-
(1987)
Lecture Notes in Control and Information Systems 103: Discrete Event Systems: Models and Applications
, pp. 197-216
-
-
Gershwin, S.B.1
-
12
-
-
0042182628
-
Scheduling a production line to minimize maximum tardiness
-
Management Science Research Project, University of California, Los Angeles, CA
-
Jackson, J. R. 1955. Scheduling a production line to minimize maximum tardiness. Research report 43, Management Science Research Project, University of California, Los Angeles, CA.
-
(1955)
Research Report
, vol.43
-
-
Jackson, J.R.1
-
13
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
Jain, A. K., H. A. Elmaraghy. 1997. Production scheduling/rescheduling in flexible manufacturing. Internat. J. Production Res. 35 281-309.
-
(1997)
Internat. J. Production Res.
, vol.35
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
14
-
-
0034976639
-
Single machine scheduling with release times, deadlines and tardiness objectives
-
Koulamas, C., G. J. Kyparisis. 2001. Single machine scheduling with release times, deadlines and tardiness objectives. Eur. J. Oper. Res. 133 447-453.
-
(2001)
Eur. J. Oper. Res.
, vol.133
, pp. 447-453
-
-
Koulamas, C.1
Kyparisis, G.J.2
-
15
-
-
0002719797
-
The Hungarian method for the assignment problem
-
Kuhn, H. W. 1955. The Hungarian method for the assignment problem. Naval Res. Logist. Quart. 2 83-97.
-
(1955)
Naval Res. Logist. Quart.
, vol.2
, pp. 83-97
-
-
Kuhn, H.W.1
-
16
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
Li, R., Y. Shyu, S. Adiga. 1993. A heuristic rescheduling algorithm for computer-based production scheduling systems. Internat. J. Production Res. 31 1815-1826.
-
(1993)
Internat. J. Production Res.
, vol.31
, pp. 1815-1826
-
-
Li, R.1
Shyu, Y.2
Adiga, S.3
-
18
-
-
0033343706
-
Predictable scheduling of a single machine with breakdowns and sensitive jobs
-
O'Donovan, R., R. Uzsoy, K. N. McKay. 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. Internat. J. Production Res. 37 4217-4233.
-
(1999)
Internat. J. Production Res.
, vol.37
, pp. 4217-4233
-
-
O'Donovan, R.1
Uzsoy, R.2
McKay, K.N.3
-
20
-
-
38249023160
-
Due date based scheduling in a general flexible manufacturing system
-
Raman, N., F. B. Talbot, R. V. Rachamadugu. 1989. Due date based scheduling in a general flexible manufacturing system. J. Oper. Management 8 115-132.
-
(1989)
J. Oper. Management
, vol.8
, pp. 115-132
-
-
Raman, N.1
Talbot, F.B.2
Rachamadugu, R.V.3
-
21
-
-
0002066821
-
Various optimizers for single-stage production
-
Smith, W. E. 1956. Various optimizers for single-stage production. Naval Res. Logist. Quart. 3 59-66.
-
(1956)
Naval Res. Logist. Quart.
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
22
-
-
0031525145
-
Rescheduling on a single machine with part-type dependent setup times and deadlines
-
Unal, A. T., R. Uzsoy, A. S. Kiran. 1997. Rescheduling on a single machine with part-type dependent setup times and deadlines. Ann. Oper. Res. 70 93-113.
-
(1997)
Ann. Oper. Res.
, vol.70
, pp. 93-113
-
-
Unal, A.T.1
Uzsoy, R.2
Kiran, A.S.3
-
23
-
-
0042156822
-
A rescheduling procedure for manufacturing systems under random disruptions
-
G. Fandel, T. Gulledge, A. Jones, eds. Springer, Berlin, Germany
-
Wu, S. D., R. H. Storer, P.-C. Chang. 1992. A rescheduling procedure for manufacturing systems under random disruptions. G. Fandel, T. Gulledge, A. Jones, eds. New Directions for Operations Research in Manufacturing. Springer, Berlin, Germany, 292-308.
-
(1992)
New Directions for Operations Research in Manufacturing
, pp. 292-308
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.-C.3
-
24
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, S. D., R. H. Storer, P.-C. Chang. 1993. One-machine rescheduling heuristics with efficiency and stability as criteria. Comput. Oper. Res. 20 1-14.
-
(1993)
Comput. Oper. Res.
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.-C.3
-
25
-
-
0031079410
-
Robust deterministic scheduling in stochastic environments: The method of capacity hedge points
-
Yellig, E. J., G. T. Mackulak. 1997. Robust deterministic scheduling in stochastic environments: The method of capacity hedge points. Internat. J. Production Res. 35 369-379.
-
(1997)
Internat. J. Production Res.
, vol.35
, pp. 369-379
-
-
Yellig, E.J.1
Mackulak, G.T.2
|