메뉴 건너뛰기




Volumn 41, Issue 17, 2003, Pages 4211-4231

Reactive scheduling in a dynamic and stochastic FMS environment

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; DECISION MAKING; ONLINE SYSTEMS; RESOURCE ALLOCATION; SCHEDULING; TIME AND MOTION STUDY;

EID: 0242485199     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/0020754031000149202     Document Type: Article
Times cited : (94)

References (31)
  • 1
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates, and disruptions
    • Bean, J. C., Birge, J., Mintenhal, J. and Noon, C., 1991, Matchup scheduling with multiple resources, release dates, and disruptions. Operations Research, 39, 470-483.
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.C.1    Birge, J.2    Mintenhal, J.3    Noon, C.4
  • 3
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single stage production
    • Daniels, R. and Kouvelis, P., 1995, Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science, 41, 363-376.
    • (1995) Management Science , vol.41 , pp. 363-376
    • Daniels, R.1    Kouvelis, P.2
  • 4
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • Dutta, A., 1994, Reacting to scheduling exceptions in FMS environments. IIE Transactions, 22, 300-314.
    • (1994) IIE Transactions , vol.22 , pp. 300-314
    • Dutta, A.1
  • 5
    • 84982522109 scopus 로고
    • ISIS-knowledge based system for factory scheduling
    • Fox, M. S. and Smith, S. F., 1984, ISIS-knowledge based system for factory scheduling. Expert Systems, 1, 25-49.
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 6
    • 0002960598 scopus 로고
    • Effects of inaccuracy of processing time estimation on effectiveness of dispatch rules
    • He, Y., Smith, M. and Dudek, R., 1994, Effects of inaccuracy of processing time estimation on effectiveness of dispatch rules. Third Industrial Engineering Research Conference, pp.308-313.
    • (1994) Third Industrial Engineering Research Conference , pp. 308-313
    • He, Y.1    Smith, M.2    Dudek, R.3
  • 7
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
    • Jeong, K. J. and Kim, Y. D., 1998, A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research, 36(9), 2609-2626.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.J.1    Kim, Y.D.2
  • 8
    • 0028594405 scopus 로고
    • Simulation based real-time scheduling in a flexible manufacturing system
    • Kim, M. and Kim, Y., 1994, Simulation based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing System, 13, 85-93.
    • (1994) Journal of Manufacturing System , vol.13 , pp. 85-93
    • Kim, M.1    Kim, Y.2
  • 9
    • 0040621775 scopus 로고    scopus 로고
    • Experimental investigation of iterative simulation-based scheduling in dynamic and stochastic job shop
    • Kutanoglu, E. and Sabuncuoglu, I., 2001a, Experimental investigation of iterative simulation-based scheduling in dynamic and stochastic job shop. Journal of Manufacturing Systems, 20(4), 264-278.
    • (2001) Journal of Manufacturing Systems , vol.20 , Issue.4 , pp. 264-278
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 10
    • 0035922494 scopus 로고    scopus 로고
    • Routing-based reactive scheduling policies for machine failures in job shops
    • Kutanoglu, E. and Sabuncuoglu, I., 2001b, Routing-based reactive scheduling policies for machine failures in job shops. International Journal of Production Research, 39(14) 3141-3158.
    • (2001) International Journal of Production Research , vol.39 , Issue.14 , pp. 3141-3158
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 12
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S. R. and Sewell, E. C., 1997, Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15, 71-82.
    • (1997) Journal of Operations Management , vol.15 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 13
    • 0037051317 scopus 로고    scopus 로고
    • Effect of load and processing time variation on the effectiveness of scheduling rules
    • Lejmi, T. and Sabuncuoglu, I, 2002, Effect of load and processing time variation on the effectiveness of scheduling rules. International Journal of Production Research, 40(4), 945-974.
    • (2002) International Journal of Production Research , vol.40 , Issue.4 , pp. 945-974
    • Lejmi, T.1    Sabuncuoglu, I.2
  • 14
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V. J., Wu, S. D. and Storer, R. H. 1994, Robustness measures and robust scheduling for job shops. IIE Transactions, 26, 32-43.
    • (1994) IIE Transactions , vol.26 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 15
  • 18
    • 0017468930 scopus 로고
    • Centralized scheduling and priority implementation heuristics for a dynamic job shop model with due dates and variable processing times
    • Nelson, R. T. and Holloway, C. A., 1977, Centralized scheduling and priority implementation heuristics for a dynamic job shop model with due dates and variable processing times. AIIE Transactions, 19, 95-102.
    • (1977) AIIE Transactions , vol.19 , pp. 95-102
    • Nelson, R.T.1    Holloway, C.A.2
  • 20
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence-dependent set-up times
    • Ovacik, I. M. and Uzsoy, R., 1994, Rolling horizon algorithms for a single machine dynamic scheduling problem with sequence-dependent set-up times. International Journal of Production Research, 32, 1243-1263.
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovacik, I.M.1    Uzsoy, R.2
  • 21
    • 0031627997 scopus 로고    scopus 로고
    • Scheduling with neural networks - a review of the literature and new research directions
    • Sabuncuoglu, I., 1998, Scheduling with neural networks - a review of the literature and new research directions. Production and Inventory Control, 9(1), 2-12.
    • (1998) Production and Inventory Control , vol.9 , Issue.1 , pp. 2-12
    • Sabuncuoglu, I.1
  • 22
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu, I. and Bayiz, M., 2000, Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 23
    • 0032000573 scopus 로고    scopus 로고
    • A beam search algorithm and evaluation of scheduling approach for flexible manufacturing systems
    • Sabuncuoglu, I. and Karabuk, S., 1998, A beam search algorithm and evaluation of scheduling approach for flexible manufacturing systems. IIE Transactions, 30, 179-191.
    • (1998) IIE Transactions , vol.30 , pp. 179-191
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 24
    • 0000179190 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliable machines
    • Sabuncuoglu, I. and Karabuk, S., 1999, Rescheduling frequency in an FMS with uncertain processing times and unreliable machines. Journal of Manufacturing Systems, 18(4), 268-283.
    • (1999) Journal of Manufacturing Systems , vol.18 , Issue.4 , pp. 268-283
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 25
    • 0000936343 scopus 로고
    • Intelligent scheduling with machine learning capabilities: The induction of scheduling knowledge
    • Shaw, M., Park, S. and Raman, N., 1992, Intelligent scheduling with machine learning capabilities: the induction of scheduling knowledge. IIE Transactions, 24, 156-168.
    • (1992) IIE Transactions , vol.24 , pp. 156-168
    • Shaw, M.1    Park, S.2    Raman, N.3
  • 29
    • 0000015166 scopus 로고
    • Robustness scheduling for job shop
    • Wu, L. and Storer, R., 1994, Robustness scheduling for job shop. IIE Transactions, 26, 32-41.
    • (1994) IIE Transactions , vol.26 , pp. 32-41
    • Wu, L.1    Storer, R.2
  • 30
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, D., Storer, R. H. and Chang, P., 1993, One-machine rescheduling heuristics with efficiency and stability as criteria. Computers Operations Research, 20, 1-3.
    • (1993) Computers Operations Research , vol.20 , pp. 1-13
    • Wu, D.1    Storer, R.H.2    Chang, P.3
  • 31
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S. Y., 1985, Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705-722.
    • (1985) International Journal of Production Research , vol.23 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.